| 1.00 | Dismantling and Taking out Power Transformer of capacity 2000 KVA , 33/11 KV from its Position for repair / servicing / rewinding installed at MRS on Plinth structure Make-SCHNEIDER and MES NO :184/3014/TR-3/18 by disconnecting /opening HV, LV Electrical connections, earthing connections along with following other works. (a) Transpiration of transformer to workshop at Lucknow/Unnao/Bareilly and back to site by making necessary arrangements of T&P (crane, recovery, vehicle, tripod to be arranged (b) Opening of transformer top cover by extraction ,removing of serviceable/unserviceable nuts bolts and washers and Lifting primary coil (HV) and secondary coil (LV) , dismantling of transformer complete part by part carefully , and display all the parts without damaging any portion for inspection of Engr -in -Charge .
c) Draining out of transformer oil and Refilling topping up of transformer oil. (d) Reassembling the transformer complete with all existing serviceable parts, and new parts as ordered .
(e) Reinstall the Transformer at site in position as directed after repair connecting HV, LV electrical connections, earthing connections and testing to entire satisfaction on load . Note- (a) Replacement of unserviceable parts like; Bush insulator, brass studs, cork gasket, breather assembly, tap changer, renewal of adequate size Nut, bolts & washers of transformer top cover shall deemed to be included in UNIT RATE QUOATED
(b) Rewinding, re-insulation of Primary and Secondary coil with copper winding wire, transformer oil etc shall be measured and paid separately under appropriate Item of schedule. | 1 | Each Job | 4,00,000 ₹4,00,000 | 3,50,000 ₹3,50,000 Lowest |
| 2.00 | Supply & filling up of transformer oil conforming to IS -335 of 1993 as in topping up / replacement up to desired level of transformer oil capacity complete all as specified and as directed.
[Note: Dielectric strength of oil should not be less than 60 KV at 2.5mm gap complete all as specified and directed. (Make: Gulf/Servo/Sabita) | 1,900 | Ltrs | 160 ₹3,04,000 Lowest | 170 ₹3,23,000 |
| 3.00 | M&L for rewinding of primary coil (33 KV) of 33/ 11 KV Transformer any capacity using proper size DPC copper wire and insulation material , heating coils in heat chamber after rewinding including taking out carefully burnt unserviceable copper winding of coils complete all as specified and directed. | 400 | Kg | 1,190 ₹4,76,000 Lowest | 1,200 ₹4,80,000 |
| 4.00 | M&L for rewinding of secondary coil (11 KV) of 33/ 11 KV , Transformer any capacity using proper size DPC copper wire and insulation material , heating coils in heat chamber after rewinding including taking out carefully burnt unserviceable copper winding of coils complete all as specified and directed. | 300 | Kg | 1,190 ₹3,57,000 Lowest | 1,200 ₹3,60,000 |
| 5.00 | M&L for preparation of old painted steel or iron surfaces of transformer of 2000 KVA , 33/11 KV capacity transformers by scrapping with steel wire brush/scrapper emery paper, etc. and applying one coats of synthetic enamel smoke grey paint over a coat of red oxide primer (painting shall be done by spray machine) including writing of SM No, MES No etc. at prominent place/location of transformer with black synthetic enamel thick paint in white back ground complete all as specified and directed. | 1 | Each Job | 5,000 ₹5,000 Lowest | 15,000 ₹15,000 |
| 6.00 | Labour only for testing of transformer, consumable items required during installation of transformer, testing of earthings, servicing & testing of buchholz relay, servicing bushing CTs, WTI & OTI and to make transformer in serviceable condition complete in all respect and making transformer ready for testing of 33/ 11 KV all routine tests to checking all the parameters in workshop completely shall be deemed to be included in quoted rate.
Note : After repair of transformer testing & commissioning should be done by SEI. | 1 | Each Job | 2,000 ₹2,000 Lowest | 15,000 ₹15,000 |
| 7.00 | Labour only for inspecting repair, testing and commissioning of all C&R panel relay complete all as specified and directed by Engineer-in-Charge including the following :- (a) IDMT RELAY. (b) Master Trip Relay.(c) All other miscellaneous relays including checking of all wiring circuit.
Note: Tripping Mechanism as per transformer protection requirement shall be got done from UPPCL before energizing the transformer. | 1 | Each Job | 2,000 ₹2,000 Lowest | 15,000 ₹15,000 |
| 8.00Note : The transformer will be repaired for a warranty period of THREE YEARS from the date of completion against any workmanship faults. | |||||
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
25 Sept 2025, 6:00 pmClosed
CWE (AF) BAREILLY
HQ Commander Works Engineers AF Military Engineer Services Bareilly 243002
as described in BOQ
2025_MES_724236_2
81549/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
AGE (I) (AF) MEMAURA
AS PER NIT
9 documents required · 9 mandatory
₹500
Yes
AEG (I) (AF) MEMAURA
₹22,000
17 Oct 2025
2 Sept 2025
2 Oct 2025
2 Sept 2025
25 Sept 2025
8 Sept 2025
Amount
Dismantling and Taking out Power Transformer of capacity 2000 KVA , 33/11 KV from its Position for repair / servicing / rewinding installed at MRS on Plinth structure Make-SCHNEIDER and MES NO :184/3014/TR-3/18 by disconnecting /opening HV, LV Electrical connections, earthing connections along with following other works. (a) Transpiration of transformer to workshop at Lucknow/Unnao/Bareilly and back to site by making necessary arrangements of T&P (crane, recovery, vehicle, tripod to be arranged (b) Opening of transformer top cover by extraction ,removing of serviceable/unserviceable nuts bolts and washers and Lifting primary coil (HV) and secondary coil (LV) , dismantling of transformer complete part by part carefully , and display all the parts without damaging any portion for inspection of Engr -in -Charge . c) Draining out of transformer oil and Refilling topping up of transformer oil. (d) Reassembling the transformer complete with all existing serviceable parts, and new parts as ordered . (e) Reinstall the Transformer at site in position as directed after repair connecting HV, LV electrical connections, earthing connections and testing to entire satisfaction on load . Note- (a) Replacement of unserviceable parts like; Bush insulator, brass studs, cork gasket, breather assembly, tap changer, renewal of adequate size Nut, bolts & washers of transformer top cover shall deemed to be included in UNIT RATE QUOATED (b) Rewinding, re-insulation of Primary and Secondary coil with copper winding wire, transformer oil etc shall be measured and paid separately under appropriate Item of schedule.
Supply & filling up of transformer oil conforming to IS -335 of 1993 as in topping up / replacement up to desired level of transformer oil capacity complete all as specified and as directed. [Note: Dielectric strength of oil should not be less than 60 KV at 2.5mm gap complete all as specified and directed. (Make: Gulf/Servo/Sabita)
M&L for rewinding of primary coil (33 KV) of 33/ 11 KV Transformer any capacity using proper size DPC copper wire and insulation material , heating coils in heat chamber after rewinding including taking out carefully burnt unserviceable copper winding of coils complete all as specified and directed.
M&L for rewinding of secondary coil (11 KV) of 33/ 11 KV , Transformer any capacity using proper size DPC copper wire and insulation material , heating coils in heat chamber after rewinding including taking out carefully burnt unserviceable copper winding of coils complete all as specified and directed.
M&L for preparation of old painted steel or iron surfaces of transformer of 2000 KVA , 33/11 KV capacity transformers by scrapping with steel wire brush/scrapper emery paper, etc. and applying one coats of synthetic enamel smoke grey paint over a coat of red oxide primer (painting shall be done by spray machine) including writing of SM No, MES No etc. at prominent place/location of transformer with black synthetic enamel thick paint in white back ground complete all as specified and directed.
Labour only for testing of transformer, consumable items required during installation of transformer, testing of earthings, servicing & testing of buchholz relay, servicing bushing CTs, WTI & OTI and to make transformer in serviceable condition complete in all respect and making transformer ready for testing of 33/ 11 KV all routine tests to checking all the parameters in workshop completely shall be deemed to be included in quoted rate. Note : After repair of transformer testing & commissioning should be done by SEI.
Labour only for inspecting repair, testing and commissioning of all C&R panel relay complete all as specified and directed by Engineer-in-Charge including the following :- (a) IDMT RELAY. (b) Master Trip Relay.(c) All other miscellaneous relays including checking of all wiring circuit. Note: Tripping Mechanism as per transformer protection requirement shall be got done from UPPCL before energizing the transformer.
Note : The transformer will be repaired for a warranty period of THREE YEARS from the date of completion against any workmanship faults.
kumaon and hills strument engnering services (BID ID -3435704)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .