| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.7 LAccepted-AOC DHAMARAIPAKKAM BUILDING AT PUES IN DHAMARAIPAKKAM PANCHAYAT | ₹97.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹97.7 LRejected-AOC | ₹97.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KBJ CONSTRUCTION L1 | SSKT ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the road from Anaimallur to Vedharajapuram road KM 0/0-2/050 R 237 PUR | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,880 | Sqm | 5.5 ₹15,840 | 5.85 ₹16,848 |
| 3.00 | Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3) | 2,062.5 | Sqm | 21.5 ₹44,344 | 21.75 ₹44,859 |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 1,080 | Cum | 131 ₹1.4 L | 131.05 ₹1.4 L |
| 5.00 | Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 240 | Cum | 134 ₹32,160 | 134 ₹32,160 |
| 6.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC | 773.44 | Cum | 2,097 ₹16.2 L | 2,097.1 ₹16.2 L |
| 7.00 | pplying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance | 6,187.5 | Sqm | 81.75 ₹5.1 L | 81.81 ₹5.1 L |
| 8.00 | Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions | 6,187.5 | Sqm | 19.17 ₹1.2 L | 19.17 ₹1.2 L |
| 9.00 | Applying tack coat over WMM surface using 3.00 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions | 1,312.5 | Sqm | 32.43 ₹42,564 | 32.43 ₹42,564 |
| 10.00 | BC 50mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, | 375 | Cum | 8,598.62 ₹32.2 L | 8,598.62 ₹32.2 L |
Tender Value
Refer Docs
EMD Value
₹99,980
Closing Date
12 Mar 2026, 9:00 amClosed
The Village President
The Village President
Strengthening the road from Anaimallur to Vedharajapuram road KM 0/0-2/050 R 237 PUR
2026_RDTN_673511_1
B3/777/2025
Open Tender
Civil Works
120 days
Panchayat Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹99,980
12 Mar 2026
11 Mar 2026
12 Mar 2026
11 Mar 2026
12 Mar 2026
11 Mar 2026
Strengthening the road from Anaimallur to Vedharajapuram road KM 0/0-2/050 R 237 PUR
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC
pplying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions
Applying tack coat over WMM surface using 3.00 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions
BC 50mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site,
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Road Stud with lens reflector
Provision for Hectometer stone
Provision for Kilometer stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_809495.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid