| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹8,265.50 (2.11%)Rejected-Finance 23A 17 RAM KRISHNA SARANI KOLKATA 700060 | KOLKATA | KOLKATA | WEST BENGAL | 700060 | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.1 L+₹20,409.13 (5.21%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹3.9 L
EMD Value
₹8,000
Closing Date
25 Sept 2026, 2:00 pmClosed
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
RESTORATION OF COLLAPSED SEWER AT 68/B, RAJA S.C. MALLICK ROAD, WARD 99, BR. X
2026_KMC_1042523_1
S_D/BR-X/1/26-27
Open Tender
CIVIL WORKS
Percentage
22 days
68/B, RAJA S.C. MALLICK ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
30 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
25 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying to
site empty cement polythene bags (capacity 50kg) in good condition
including stacking, incedental charges etc. all complete (capacity 50
kg). | 86 | EACH | 6 | ₹516 |
| 2 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and
stacked at site: 6)d)Silver Sand. Note: 1. The above rates are
inclusive of all charges such as Royalty, Supervision Charges, etc.
and also include allowance for sinkage, as applicable, and/or
shrinkage and 10% Contractor?s Profit but exclusive of GST
2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at
site and no other costs need to be considered. For other items,
necessary loading-unloading & carriage charges are admissible.
3. Laterrite Boulder &Moorum are available in the districts as
mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may
add necessary carriage cost as applicable. (6th Corrigenda &
addenda dated 29.07.2019) | 2.4 | CUM | 800 | ₹1,920 |
| 3 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labour
charges for filling empty cement gunny bag / polythene bag (capacity
50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone /
brick) and sewing as done in case of cement bags ,( tying with a knot
after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of
any types of filling materials). NB:- Volume of earth/ sand filled bags
should not be less than 0.028 cum/bag | 86 | EACH | 7 | ₹602 |
| 4 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping in
position earth / sand filled gunny / poly bags (capacity 50kg) within a
lead of 30 metre inclusive of all lifts. | 86 | EACH BAG | 3 | ₹258 |
| 5 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.32.Removing
earth/sand filled poly bags/gunny bags from the channel bed/slope
and initially depositing the same near channel bank at a place as
directed by the Engineer-in Charge for measurement of Bag. & then
disposing off the same at a distance not less than 150 metre from the
channel site. | 86 | EACH BAG | 6 | ₹516 |
| 6 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF
MACHINERIES 8.29Hire charges for engaging Air Compressor
machine with minimum pressure capacity of 5.0 Kg/sq.cm
arrangement including all necessary equipments and operating staff,
carriage, fuel, Tools and plants all complete for cutting Road / hard
crust cutting with pneumatic hammer at desired point in water supply
works as per direction of EIC . a) With Pneumatic hammers For
beyond 8hrs. of working | 8 | Hr | 750 | ₹6,000 |
| 7 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete. (a) Depth of excavation not exceeding
1,500 mm. | 0.2 | CUBIC METER PERCENT | 11,927 | ₹2,415.22 |
| 8 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete (b) Depth of excavation for additional
depth beyond 1,500 mm. and upto 3,000 mm. but not requiring
shoring | 0.17 | CUBIC METER PERCENT | 19,238 | ₹3,310.86 |
| 9 | Hire and labour charges for shoring work (including necessary close
plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc)
complete as per direction of the Engineer-in-charge for excavation
works (vertical surface are in contact with supported earth is to be
measured.) (This item should be executed on specific direction of the
Enginner in charg(e).With 5.0 cm. thick timber planks. For depth upto
6.00 M below G.L. a) Beyond 1.0 M. upto 2.0 M trench width . | 72.15 | SQM | 727 | ₹52,453.05 |
| 10 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
4. (A) Filling in foundation or plinth by silver sand in layers not
exceeding 150 mm as directed and consolidating the same by
thorough saturation with water, ramming complete including the cost
of supply of sand. (payment to be made on measurement of finished quantity) | 0.03 | CUBIC METER PERCENT | 93,621 | ₹2,527.77 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
form.pdf
Tender Documents • 0.63 MB
BOQ_2558803.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .