Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹50.3 L+₹1.3 L (2.69%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹52.4 L+₹3.4 L (6.90%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹54.5 L+₹5.5 L (11.2%)Rejected-Finance RUPCHANDPUR MIRSHADPUR BADLAPUR JAUNPUR | JAUNPUR | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹59.1 L+₹10.1 L (20.5%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S DHANANJAY PRASAD TRIPATHI L2 | M/S RAM CHARAN YADAV L3 | M/s TRIPATHI CONSTRUCATION L1 | VIRAT CONSTRUCTION L5 | NAGENDRA PRATAP SINGH L4 | M/S CHANDRA MAULI MISHRA CONTRECTOR L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in excavation of foundation in all type of soil including as per direction by engineer in charge required for proper completion of work including cost of all Labour and T&P etc. | 2,208.44 | CUM | 81 ₹1,78,883.88 | 53 ₹1,17,047.48 Lowest | 60 ₹1,32,506.58 | 83.6 ₹1,84,625.83 | 85 ₹1,87,717.66 | 84 ₹1,85,509.21 |
| 2.00 | Laying C.C, A-40, M-10 in foundation with cement ,coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including with mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work includind cost of all material, ,Labour and T&P etc. | 22.64 | CUM | 999.49 ₹22,629.45 Lowest | 11,000 ₹2,49,051 | 9,100 ₹2,06,033.1 | 12,173 ₹2,75,608.89 | 8,500 ₹1,92,448.5 | 12,273 ₹2,77,872.99 |
| 3.00 | Laying R.C.C, A-20, M-15 with cement coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including all lead & lift ,with mechanical mixing & mechanical 0ibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, ,Labour and T&P etc. | 157.77 | CUM | 10,250 ₹16,17,183.5 | 11,000 ₹17,35,514 | 9,300 ₹14,67,298.2 Lowest | 11,739 ₹18,52,108.99 | 10,700 ₹16,88,181.8 | 11,740 ₹18,52,266.76 |
| 4.00 | Laying R.C.C, A-20, M-25 with cement coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including all lead & lift ,with mechanical mixing & mechanical 0ibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, ,Labour and T&P etc. | 128.35 | CUM | 10,250 ₹13,15,556.75 | 11,500 ₹14,75,990.5 | 9,000 ₹11,55,123 Lowest | 12,988 ₹16,66,970.84 | 10,500 ₹13,47,643.5 | 12,999 ₹16,68,382.65 |
| 5.00 | Centering & Shuttering for P.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 19.2 | SQM | 161.34 ₹3,097.63 | 120 ₹2,304 Lowest | 150 ₹2,880 | 210 ₹4,032 | 450 ₹8,640 | 215 ₹4,128 |
| 6.00 | Centering & Shuttering for R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 322.32 | SQM | 765 ₹2,46,577.86 | 523 ₹1,68,575.45 Lowest | 750 ₹2,41,743 | 900 ₹2,90,091.6 | 600 ₹1,93,394.4 | 950 ₹3,06,207.8 |
| 7.00 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, ,Labour and T&P etc. | 4.95 | MT | 78,530 ₹3,88,959.09 | 78,000 ₹3,86,334 | 75,000 ₹3,71,475 | 78,540 ₹3,89,008.62 | 67,000 ₹3,31,851 Lowest | 78,640 ₹3,89,503.92 |
| 8.00 | Dewatering with all cost of power/POL machines,pump well/point system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc.(83 HP Pump) | 20,947.68 | KWH | 44.07 ₹9,23,206.15 | 40 ₹8,37,907.2 Lowest | 45 ₹9,42,645.6 | 56.6 ₹11,85,638.69 | 56 ₹11,73,070.08 | 65 ₹13,61,599.2 |
| 9.00 | P/L 100 mm dia PVC pipe for weep holes including cost of all material labour t&p etc | 32 | Rm | 377.76 ₹12,088.32 | 200 ₹6,400 Lowest | 400 ₹12,800 | 483 ₹15,456 | 450 ₹14,400 | 485 ₹15,520 |
| 10.00 | P/L filter media with coarse sand of thickness not less than 200mm including cost of all material labour T&P, etc. | 1.15 | CUM | 5,280 ₹6,082.56 | 4,000 ₹4,608 Lowest | 6,300 ₹7,257.6 | 6,694.8 ₹7,712.41 | 6,600 ₹7,603.2 | 6,695 ₹7,712.64 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
31 Aug 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2,Basti (U.P.)
Construction work of wing wall of Super passage at km. 49.634 of Caimpierganj in district Maharajganj.
2026_UPIDC_1178893_5
Tender Notic 03/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,385
₹1.3 L
6 Oct 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation of foundation in all type of soil including as per direction by engineer in charge required for proper completion of work including cost of all Labour and T&P etc. | 0.2 | CUM | - | - |
| 2 | Laying C.C, A-40, M-10 in foundation with cement ,coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including with mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work includind cost of all material, ,Labour and T&P etc. | 1 | CUM | - | - |
| 3 | Laying R.C.C, A-20, M-15 with cement coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including all lead & lift ,with mechanical mixing & mechanical 0ibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, ,Labour and T&P etc. | 0.6 | CUM | - | - |
| 4 | Laying R.C.C, A-20, M-25 with cement coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including all lead & lift ,with mechanical mixing & mechanical 0ibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, ,Labour and T&P etc. | 0.8 | CUM | - | - |
| 5 | Centering & Shuttering for P.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 1 | SQM | - | - |
| 6 | Centering & Shuttering for R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 0.6 | SQM | - | - |
| 7 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, ,Labour and T&P etc. | - | MT | - | - |
| 8 | Dewatering with all cost of power/POL machines,pump well/point system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc.(83 HP Pump) | - | KWH | - | - |
| 9 | P/L 100 mm dia PVC pipe for weep holes including cost of all material labour t&p etc | - | Rm | - | - |
| 10 | P/L filter media with coarse sand of thickness not less than 200mm including cost of all material labour T&P, etc. | 1 | CUM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
CampwelLot-5.pdf
Tender Documents • 1.01 MB
BOQ_2216081.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .