Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance TAMIL NADU | PUDUKKOTTAI | TAMIL NADU | 613301 | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹4.0 L+₹8,732 (2.22%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions Satisfied |
Tender Value
₹3.6 L
EMD Value
₹3,600
Closing Date
30 Sept 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Operation,TTPS
Office of the SE/Operation/TTPS
TTPS Operation Circle MPM II ACP STAGE I, II III Cleaning of filters, greasing of bearings, aligning of V belts, checking of bearing performance, Conducting static balancing test and renewing of fan blades and tie rods, if any failure occurs,
2020_EB_179048_1
SE/O/TTPS/Spec.No.191/20-21
Open Tender
Miscellaneous Works
Item Rate
175 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹3,600
6 Oct 2020
15 Sept 2020
1 Oct 2020
15 Sept 2020
30 Sept 2020
15 Sept 2020
90 days
Charges for removing of filters, cleaning with compressed air and water and re-fixing in the filter frames at Unit I to III fan houses, including replacement of damaged filters with new filters and each unit having 144 nos filters. (One Operation includes units I, II and III fan house.)
Charges for removing of filters, cleaning with compressed air and water and re-fixing in the filter frames at Unit IV & V air washer including replacement of damaged filters with new filters and each unit having 312 nos filters. (One Operation includes unit IV & V air washer).
Charges for greasing of the bearings in AC plant equipments like fan house centrifugal fans at unit I to III, cooling water pumps and blower fans of air washer unit IV & V. Checking for any, dislocation of bearing and lock nut tightness of blower fans. (1 Opn = 10 Nos blowers / fans + 2 Nos. cooling water pumps.)
Charges for checking the ‘V’ belt alignment. If necessary, re-aligning of the ‘V’ belts, tightness of the bed bolts and taper lock bush allen bolts, free rotation of impellers, inspection of welding portion of the fan blades [if necessary welding should be carried out] and tightness of the tie rods of the centrifugal fans at unit I to III fan house and unit IV & V air washer blowers.
Materials under Contractor’s Scope i) V-Belt C-210 (Make Fenner).
Materials under Contractor’s Scope V-Belt C-225 (Make Fenner).
Materials under Contractor’s Scope V-Belt SPC-7500 (Make Fenner).
Charges for dismantling the failed bearings at both sides if any, renewing the self aligned double row taper lock bearings No 1316K or 1318K or 22326K with sleeve and lock washer after dismantling the flywheel at DE side & Plummer block housing at both sides using lifting arrangements, grease packing, tightening of the bolts & nuts, aligning of ‘V’ belts after re-fixing the dismantled parts and commissioning of fans at fan house unit I to III or air washer blower at unit IV & V. The rates included all consumables, T&P hire charges, devolution of scrap materials as per the direction of engineer in charge. [Bearings will be supplied by board.]
Charges for cutting and removing the corroded impeller (or) damaged fan blades, size [920 X 540] mm, grinding the cutting portion, fixing the newly fabricated blades on the impeller by welding and also fixing the tie rods 2 mtr length and 25 mm dia [if necessary] and commissioning of the blower fans at air washer unit IV & V. The rates includes all T&P hire charges and consumables. [The fan blades and tie rods will be supplied by board.]
Charges for conducting the static balancing test on any of the blower assembly at Unit I to V fan house/air washer system. [T&Ps and consumables with contract scope].
Charges for decoupling the motor and overhauling of cooling water pump and its suction strainer cleaning pump Make: Beacon weir, model SDB 150/200, Motor cap: 37 KW, dismantling the pump parts, replace the damaged parts, bearings etc., if necessary. Cleaning and re-assembling the same in the pump, painting the pump, alignment checking, coupling with motor and commissioning of the pump at air washer unit IV & V.
KARTHIK ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .