Loading…
Loading…
Tender Value
₹9.4 L
EMD Value
₹18,812
Closing Date
8 Jun 2026, 4:00 pm3d left
Executive Engineer (BM-PK)
Room No.1615, 16th Floor, Palika Kendra, New Delhi
Replacement of existing old window at ground and mezzanine floor at Palika Kendra building.
2026_NDMC_292238_1
NIT No.18/EE(BM-PK)/2026-27
Open Tender
Civil Works
90 days
NDMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,812
29 May 2026
29 May 2026
8 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineerin- charge. | 48 | Square Metre | 54.68 | ₹2,624.64 |
| 2 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand) | 1.5 | Cubic Metre | 6,323.57 | ₹9,485.36 |
| 3 | CEMENT PLASTER (IN FINE SAND) 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | 50 | Square Metre | 337.38 | ₹16,869 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from
natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | Cubic Metre | 7,658.88 | ₹45,953.28 |
| 5 | Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing,
paneling and dash fasteners to be paid for separately) : For fixed portion Powder coated aluminium (minimum thickness of powder coating 50 micron) | 311 | Kiloigram | 516.11 | ₹1,60,510.21 |
| 6 | For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powder coating 50 micron) | 250 | Kiloigram | 616.76 | ₹1,54,190 |
| 7 | Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete : 250x10 mm. | 30 | Each | 111.94 | ₹3,358.2 |
| 8 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 25 mm average thickness | 120 | Square Metre | 123.22 | ₹14,786.4 |
| 9 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer- In-charge complete in all respect. Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 120 | Square Metre | 277.25 | ₹33,270 |
| 10 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge.25 mm average thickness in 2 layers. | 120 | Square Metre | 570.98 | ₹68,517.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_388052.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid