Permanent restoration on Tantli to Gurakhara Part-II and Bhargi to Kunan
2026_JKRRD_149439_1
Permanent Restoration work under PMGSY Divisoin Thathri NIT 06 of 2026-27
Open Tender
CIVIL
Percentage
45 days
Thathri
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer
₹1.8 L
Yes
8 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
21 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of Soil | 1,211.66 | Cum | 256.85 | ₹3,11,214.87 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6(4.4.5) | 265 | Cum | 5,733.6 | ₹15,19,404 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4- | 20.42 | Cum | 6,591.26 | ₹1,34,593.53 |
| 4 | Back filling with stones behind abutment, wing walls and return walls complete as per drawing and technical specification clause 1204.3.8 | 531.57 | Cum | 937.9 | ₹4,98,559.5 |
| 5 | Polygonal Rubble masonry brought to course in 1 cement : 6 fine sand mortar with nallah stone in substructure, incl. leveling up at specified levels with M-5 nominal Mix (size of stone agg. 20mm nominal) conc. Incl. cost of through/Bond stones. | 526.23 | Cum | 5,402.9 | ₹28,43,168.07 |
| 6 | Polygonal/Random Rubble masonry uncoursed/brought to course laid dry with nallah stone in sub-structure inc. cost of through/bond stones. | 173.76 | Cum | 2,793.8 | ₹4,85,450.69 |
| 7 | Hand-packing stones in wire-crates; including cost of stones and excluding Cost of Crates | 1,296 | Cum | 1,071.15 | ₹13,88,210.4 |
| 8 | supply of Wire- Crates with 4mm dia G I Confirming to IS 280 &4826 in 100mmX100mm incl. 10% extra for laps and Joint incliding all lead lift and Carriages | 150 | No | 6,000 | ₹9,00,000 |
| 9 | a)Carriage cost of Sand 30 km by MT | 360.49 | Cum | 520.34 | ₹1,87,577.37 |
| 10 | b) Carriage cost of Stone Aggregate 30 km by MT | 303.94 | Cum | 520.34 | ₹1,58,150.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_235536.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .