| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.6 LAccepted-AOC BARPALI GEVRA BASTI KUSMUNDA KORBA C G | KUSMUNDA | KORBA | CHHATTISGARH | 495452 | L-1 | Accepted-AOC The work has been awarded to L-1 bidder | |
| 2 | Rejected-Technical PALI ROAD DIPKA KORBA CG 495452 | KORBA | CHHATTISGARH | 495452 | - | Rejected-Technical Due to L2 Bidder |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
21 Aug 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM CIVIL GEVRA AREA
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534065
Development works to view point at Gevra Project of Gevra Area
2023_SECL_285167_1
SECL/GA/GM(C)/ETN/23-24/58 dtd. 04.08.2023
Open Tender
Civil Works - Others
Item Rate
60 days
Gevra Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,800
20 Sept 2023
5 Aug 2023
23 Aug 2023
5 Aug 2023
21 Aug 2023
6 Aug 2023
5 Aug 2023 - 9 Aug 2023
Amount
PART-A RETAINING WALL
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Precast terrazo tiles 22 mm thick with graded marble chips of size upto 12 mm, laid in floors, and landings, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand) : Medium shade pigment using 50% white cement and 50% ordinary cement
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :' Raised and cut pointing
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall' 40 mm nominal outer dia Pipes
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade : New work (three or more coats)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total impact of GST for the purpose of CTC
SUDEEP KUMAR SINGH
stage.html
html • 0.04 MB
techsummary_295258.pdf
PDF • 2.50 MB
finsummary_295258.pdf
PDF • 2.50 MB
LOA573KAVITAENTERPRISES.pdf
PDF • 4.10 MB
finance_295258.pdf
PDF • 0.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .