Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.4 L+₹1,648.25 (0.68%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.5 L+₹5,738.55 (2.36%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.5 L+₹9,202.05 (3.78%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹2.6 L+₹11,996.55 (4.93%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S CLEAR LINE ENGINEERS CONTRACTOR L6 | WINCARE L12 | M/S MENGI CONTRACTOR L4 | M/s Intel Technocrates L5 | THAPPA ELECTRICAL CONSTRUCTION AND SUPPLIERS L3 | MR INFRA ASSOCIATES L11 | Ms Jagan Electrical Construction L7 | M/S D.K TRADERS L17 | M/S K.K ELECTRICALS L15 | GIRI ELECTRICAL & SONS L13 | SHAH BROTHERS L18 | M/S PIONEER ENGINEERS L10 | SATYAM CONSTRUCTION & TRADING COMPANY L14 | M/S SURYA ENTERPRISES L9 | SHAKEEL AHMED SHEIKH L8 | TM GROUP OF COMPANIES L1 | JAI CHANDI MAA ENTERPRISES L16 | R K ELECTRICALS CONSTRUCTION AND SUPPLIERS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Items of Emergent and Maintenance Works | |||||||||||||||||||||
| 1.01 | Unloading T&P items | 1 | Qtls | 150 ₹150 | 1,260 ₹1,260 | 53 ₹53 | 200 ₹200 | 53 ₹53 | 1,550 ₹1,550 | 70 ₹70 | 1,500 ₹1,500 | 1,500 ₹1,500 | 1,000 ₹1,000 | 1,500 ₹1,500 | 95 ₹95 | 1,500 ₹1,500 | 90 ₹90 | 50 ₹50 Lowest | 54.25 ₹54.25 | 1,600 ₹1,600 | - |
| 1.02 | Carriage of T and P items upto 100 Mtr | 1 | Qtls | 180 ₹180 | 2,520 ₹2,520 | 57 ₹57 Lowest | 100 ₹100 | 57 ₹57 Lowest | 3,100 ₹3,100 | 70 ₹70 | 3,000 ₹3,000 | 3,000 ₹3,000 | 1,000 ₹1,000 | 3,000 ₹3,000 | 110 ₹110 | 3,000 ₹3,000 | 90 ₹90 | - | 58.25 ₹58.25 | 3,100 ₹3,100 | 58.25 ₹58.25 |
| 1.03 | Carriage of T and P items for subsequent 100 Mtr | 1 | Qtls | 150 ₹150 | 4,200 ₹4,200 | 70 ₹70 | 200 ₹200 | 68 ₹68 Lowest | 9,000 ₹9,000 | 87 ₹87 | 5,000 ₹5,000 | 5,000 ₹5,000 | 1,000 ₹1,000 | 5,000 ₹5,000 | 115 ₹115 | 5,000 ₹5,000 | 90 ₹90 | 249 ₹249 | 69 ₹69 | 4,990 ₹4,990 | 69 ₹69 |
| 1.04 | Branch Cutting along the DT/HT/LT network for providing standard ground clearance | 1 | Km | 5,000 ₹5,000 | 7,560 ₹7,560 | 1,500 ₹1,500 | 10,000 ₹10,000 | 1,490 ₹1,490 | 12,000 ₹12,000 | 1,700 ₹1,700 | 9,000 ₹9,000 | 9,000 ₹9,000 | 7,000 ₹7,000 | 9,000 ₹9,000 | 1,000 ₹1,000 Lowest | 9,000 ₹9,000 | 3,500 ₹3,500 | 4,490 ₹4,490 | 1,495 ₹1,495 | 10,000 ₹10,000 | 1,495 ₹1,495 |
| 1.05 | Route clearance for making path for safe working | 1 | Mtr | 3 ₹3 | 7,560 ₹7,560 | 3 ₹3 | 100 ₹100 | 2 ₹2 Lowest | 12,000 ₹12,000 | 5 ₹5 | 9,000 ₹9,000 | 9,000 ₹9,000 | 7,000 ₹7,000 | 9,000 ₹9,000 | 950 ₹950 | 9,000 ₹9,000 | 5 ₹5 | 38 ₹38 | 2.5 ₹2.5 | 8,990 ₹8,990 | 2.5 ₹2.5 |
| 1.06 | Unloading of PCC 8 Mtr Pole | 1 | No | 45 ₹45 Lowest | 1,260 ₹1,260 | 180 ₹180 | 100 ₹100 | 176 ₹176 | 1,450 ₹1,450 | 250 ₹250 | 1,600 ₹1,600 | 1,500 ₹1,500 | 1,000 ₹1,000 | 1,500 ₹1,500 | 250 ₹250 | 1,500 ₹1,500 | 150 ₹150 | 195 ₹195 | 177 ₹177 | 1,500 ₹1,500 | 177 ₹177 |
| 1.07 | Average carriage of PCC 8 Mtr Pole upto 100 Mtr | 1 | No | 120 ₹120 | 1,680 ₹1,680 | 220 ₹220 | 100 ₹100 Lowest | 220 ₹220 | 2,100 ₹2,100 | 250 ₹250 | 2,000 ₹2,000 | 2,000 ₹2,000 | 1,000 ₹1,000 | 2,000 ₹2,000 | 350 ₹350 | 2,000 ₹2,000 | 200 ₹200 | 305 ₹305 | 221 ₹221 | 2,000 ₹2,000 | 221 ₹221 |
| 1.08 | Average carriage of PCC 8 Mtr Pole for subsequent 100Mtr | 1 | No | 100 ₹100 Lowest | 3,360 ₹3,360 | 342 ₹342 | 100 ₹100 Lowest | 344 ₹344 | 4,100 ₹4,100 | 400 ₹400 | 4,000 ₹4,000 | 4,000 ₹4,000 | 1,000 ₹1,000 | 4,000 ₹4,000 | 320 ₹320 | 4,000 ₹4,000 | 200 ₹200 | 145 ₹145 | 345 ₹345 | 4,000 ₹4,000 | 345 ₹345 |
| 1.09 | Erection of PCC 8 Mtr Pole with Cross-Arm/U-clamp | 1 | No | 700 ₹700 | 7,560 ₹7,560 | 1,100 ₹1,100 | 200 ₹200 Lowest | 1,090 ₹1,090 | 9,500 ₹9,500 | 1,500 ₹1,500 | 9,000 ₹9,000 | 9,000 ₹9,000 | 7,000 ₹7,000 | 9,000 ₹9,000 | 1,100 ₹1,100 | 9,000 ₹9,000 | 2,000 ₹2,000 | 3,475 ₹3,475 | 1,090 ₹1,090 | 9,000 ₹9,000 | 1,090 ₹1,090 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 May 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Elect Div Batote
Office of the Executive Engineer Elect Divi Batote
FixingofRateContractforMaintenance Restoration and Works of Emergent natureofDistributionNetwork in the Jurisdiction ofElectricDivision JPDCL Batotefor the financial year 2024 25
2024_PDD_248024_1
e NIT 08 of 2024-25
Open Tender
Electrical and Maintenance Works
Turn-key
Distt Ramban under ED BAtote
As per SBD
4 documents required · 4 mandatory
₹2,000
Executive Engineer, Elect Div Batote
₹1 L
Yes
Office of the Executive Engineer Elect Divi Batote
14 Jun 2024
20 Apr 2024
7 May 2024
20 Apr 2024
6 May 2024
20 Apr 2024
20 Apr 2024 - 23 Apr 2024
23 Apr 2024
Items of Emergent and Maintenance Works
Unloading T&P items
Carriage of T and P items upto 100 Mtr
Carriage of T and P items for subsequent 100 Mtr
Branch Cutting along the DT/HT/LT network for providing standard ground clearance
Route clearance for making path for safe working
Unloading of PCC 8 Mtr Pole
Average carriage of PCC 8 Mtr Pole upto 100 Mtr
Average carriage of PCC 8 Mtr Pole for subsequent 100Mtr
Erection of PCC 8 Mtr Pole with Cross-Arm/U-clamp
Dismantling of PCC Pole 8 Mtr Long
Unloading of ST 8 Mtr Pole
Average carriage of ST 8 Mtr Pole upto 100 Mtr
Average carriage of ST 8 Mtr Pole for subsequent 100Mtr
Erection of ST 8 Mtr Pole with Cross-Arm/U-clamp
Dismantling of ST Pole 8 Mtr Long
Unloading of PCC 9 Mtr Pole
Average carriage of PCC 9 Mtr Pole upto 100 Mtr
Average carriage of PCC 9 Mtr Pole for subsequent 100Mtr
Erection of PCC 9 Mtr Pole with Cross-Arm/U-clamp
Dismantling of PCC Pole 9 Mtr Long
Unloading of ST 9 Mtr Pole
Average carriage of ST 9 Mtr Pole upto 100 Mtr
Average carriage of ST 9 Mtr Pole for subsequent 100Mtr
Erection of ST 9 Mtr Pole with Cross-Arm/U-clamp
Dismantling of ST Pole 9 Mtr Long
Unloading of PCC 11 Mtr Pole
Average carriage of PCC 11 Mtr Pole upto 100 Mtr
Average carriage of PCC 11 Mtr Pole for subsequent 100Mtr
Erection of PCC 11 Mtr Pole with Cross-Arm/U-clamp
Dismantling of PCC Pole11 Mtr Long
Unloading of ST 11 Mtr Pole
Average carriage of ST 11 Mtr Pole upto 100 Mtr
Average carriage of ST 11 Mtr Pole for subsequent 100Mtr
Erection of ST 11 Mtr Pole with Cross-Arm/U-clamp
Dismantling of ST Pole 11 Mtr Long
Unloading of ST 13 Mtr Pole
Average carriage of ST 13 Mtr Pole upto 100 Mtr
Average carriage of ST 13 Mtr Pole for subsequent 100Mtr
Erection of ST 13 Mtr Pole with Cross-Arm/U-clamp
Dismantling of ST Pole 13 Mtr Long
Straightening of tilted 8Mtr PCC pole
Straightening of tilted 9Mtr PCC pole
Straightening of tilted 11Mtr PCC pole
Straightening of tilted 8Mtr ST pole
Straightening of tilted 9Mtr ST pole
Straightening of tilted 11Mtr ST pole
Straightening of tilted 13Mtr ST pole
Fixing of GI Barbed Wire for anti Climbing
Erection of Danger Plates with Clamps
Dismantling of Danger Plates with Clamps
Erection of Anti Climbing Device with Clamps
Dismantling of Anti Climbing Device with Clamps
Painting of LT ST Poles (8Mtr,9Mtr,11Mtr) and allied material( excluding cost of material)
Painting of HT ST Poles (8Mtr,9Mtr,11Mtr) and allied material( excluding cost of material)
Painting of HT ST Poles (13Mtr) and allied material( excluding cost of material)
Painting of Substation Poles and allied material( excluding cost of material)
Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor)
Unloading of Line Material
Loading of Line Material
Loading of ACSR conductors of all sizes(scrap/roll/drum)
Loading of HT/LT AB/XLPE Cables of all sizes( in scrap/roll/drum)of all sizes
Watch and Ward of Material
Punching/Making of Holes on M S Channel
Punching/Making of Holes on M S Angle Iron/Braces
Fabrication of Ms Steel i.e Channel , Angle Braces etc at site as requirements
Drilling holes in the iron piece
Fixing of M S Channels 10/9/7/6 feet long
Fixing of MS Channels 4.5/3 feet long
Fixing of M S Angle Iron 10/9/7/6 feet long
Fixing of MS Angle Iron 5/4.5/3 feet long
Dismantling of M S Channels 10/9/7/6 feet long
Dismantling of MS Channels 4.5/3 feet long
Dismantling of M S Angle Iron 10/9/7/6 feet long
Dismantling of MS Angle Iron 5/4.5/3 feet long
Fixing of U-Clamps and Shackle Insulators
Dismantling of U-Clamps and Shackle Insulators
Fixing/Installation of 11 KV Pin Insulators with Pins
Dismantling of 11 KV Pin Insulators with Pins
Fixing/Installation of Complete LT switchgear MCCBs(complete job)
Fixing/Installation of 11 KV Disc Insulators with fittings
Dismantling of 11KV Disc Insulators with fittings
Installation of Link/DO set
Installation of HG set
Dismantling of Link/DO Set
Dismantling of HG Set
Installation of GO Set(complete)
Dismantling of GO Set(complete)
Installation of LA Set(Station type)
Dismantling of LA Set(Station type)
Installation of LASet(Line Type)
Dismantling of LASet(Line Type)
Unloading of CT/PT Unit
Average carriage of CT/PT Unit upto 100 Mtr
Average carriage of CT/PT for subseqent 100mtrs
Erection of CT/PT Unit along with Trivector Meter
Erection of CT/PT Unit
Dismantling of CT/PT Unit
Testing and commissioning of CT/PT Unit
Earthing of CT/PT Unit
Unloading of 25/63/100KVA Transformer
Unloading of 250/400/500/630 KVA Transformer
Construction of Cement Platform (8x8x6), 3feet below ground level & 3feet below ground level for Distribution transformer 400/500/630 KVA (Matrerial to be provided by contractor)
Average carriage of 25/63/100 KVA upto 100 Mtr
Average carriage of 25/63/100 KVA for subsequent 100 Mtr
Average carriage of 250/400/500/630 KVA upto 100 Mtr
Average carriage of 250/400/500/630 for subsequent 100 Mtr
Mounting of 25/63/100 KVA Transformer
Mounting of 250/400/500/630 KVA Transformer
Unmounting of 25/63/100 KVA Transformer
Unmounting of 250/400/500/630 KVA Transformer
Erection of HVDS 25KVA
Dismantling of HVDS 25KVA
Earthing of HVDS 25KVA
Fixing of Jumpers
Dismantling of Jumper
Earthing of poles for HT Line
Earthing of poles for LT Line
Earthing of Substation complete(Poles,Transformer,LA) per qty
Fixing of LT Circuit Component of Substation (LT cables,Thimbles, Busbar,Shackle insulators) with Fuse Set / MCCB with Box
Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Fixing of LT Distribution Box for 400/ 500/630 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Fabrication & fixing of LT Switch made of angle Iron 50x50x6 with LT busbar 50x6mmon bus bar insulator
Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit
Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps
Dismantling of LT Circuit Component of Substation (LT cables,Thimbles, Busbar,Shackle insulators) with Fuse Set / MCCB with Box
Testing and commissioning of Substation
Laying/Stringing of ACSR Conductor 20/30mmsq/Squirel /Weasel
Dismantling of Old Squirell/Weasel ACSR Conductor
Laying/Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog
Dismantling of Old Dog/Rabbit ACSR Conductor
Tightening of loose conductor
Erection of Guys in HT/LT Line , with stay wire binding for eye bolt, Guy insulator & anchor rod and Back filling the stay pit
Dismantling of Guys in HT/LT Line with stay wire binding for eye bolt, Guy insulator & anchor rod and Back filling the stay pit
Fixing of Suspension/Anchoring Clamps
Laying/Erection/Stringining of HT AB/XLPE Cable (25/35/50 mmsq)
Dismantling of HT AB/XLPE Cable 25/35/50 mmsq
Laying/Erection/Stringining of HT AB/XLPE Cable 70/95/120 mmsq
Dismantling of HT AB/XLPE Cable 70/95/120 mmsq
Laying/Erection/Stringining of HT AB/XLPE Cable 150/185mmsq
Dismantling of HT AB/XLPE Cable 150/185mmsq
Laying/Erection/Stringining of HT AB/XLPE Cable 240/300 mmsq
Dismantling of LT AB/XLPE Cable 240/300 mmsq
Laying/Erection/Stringining of LT AB/XLPE Cable 25/35/50 mmsq
Dismantling of LT AB/XLPE Cable 25/35/50 mmsq
Laying/Erection/Stringining of LT AB/XLPE Cable 70/95/120 mmsq
Dismantling of LT AB/XLPE Cable 70/95/120 mmsq
Laying/Erection/Stringining of LT AB/XLPE Cable 150/185mmsq
Dismantling of LT AB/XLPE Cable 150/185mmsq
Laying/Erection/Stringining of LT AB/XLPE Cable 240/300/400 mmsq
Dismantling of HT AB/XLPE Cable 240/300/400 mmsq
Laying of LT PVC Single Core Cable 95 mm sq for Dt's
Laying of LT PVC Single Core Cable 185 mm sq for Dt's
Laying of LT PVC Single Core Cable 300 mm sq for Dt's
Laying of LT PVC Single Core Cable 400 mm sq for Dt's
Laying of LT PVC Single Core Cable 630 mm sq for Dt's
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT Lines including jointing Kit of sizes upto 95sqmm
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT Lines including jointing Kit of sizes 95sqmm to 185sqmm
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT Lines including jointing Kit of sizes above 185sqmm
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of LT Lines of all sizes
Fixing of Mid Span Straight Jointer Kit for AB/XLPE cables of HT Lines of all sizes
Fixing of Mid Span Straight Jointer Kit for AB/XLPE cables of LT Lines of all sizes
Earthing of Cable
Fixing of IPC 120/50mm
Fixing of Single Phase Meters
Fixing of Three Phase Meters
Labour charges for erection of HT metering cubicle including all connections and earthing as per departmental standards.
Labour charges for erection of HT Trivector meter box including all connections and earthing as per departmental standards.
Labour charges for testing and repairing of meters and rigging and modification of CT Boxes.
Sealing of Meter bit, including inserting of wire
Winding of trip and close coils including material and without bobbin
Fixing of 3-Ph LT CT Meter at DTR (including transport)
Replacement of existing S-Ph meter with H.A meter (all types including infrared(IR) meter) including writing meter change slip and handing over to Section office including transporting from section office to location and back.
Replacement of existing 3-Ph meter with H.A meter (all types including infrared(IR) meter) including writing meter change slip and handing over to Section office including transporting from section office to location and back.
Erection of 11KV and 0.440KV CTs including earthing & Jumpering with GI/Copper wire
Erection of 11KV and 0.44KV CTs including earthing & Jumpering with GI/Copper/MS Flat Earthing
Labour charges for sealing of single phase/3 phase meters including transportation of meter box carton to work spot, unpacking, packing of sealed meters and stocking etc., complete.
Removing the meter back cover, cleaning the old meter cover, painting the meter top & bottom covers with good approved enamel black paint, cleaning the meter with petrol and oiling to bearings with good 2 in 1 oil (Usha make) refixing the meter in meter cover duly providing new gaskets. Testing and adjustments of the meter as per departmental standards, loading, transporting, and unloading including introducing sealing wire to each meter including replacement of glass wherever necessary.
Supply and rigging of meter with country wood of size 1’x1/2’, 7/20 finolex wire, bolts and nuts and screws along with lugs. Removing of metallic strip in syntex box, fixing of wooden board suitably, fixing of meter and CT in position including fixing of neutral terminal bolt. Providing of internal wiring duly giving proper connections, opening of internal link in the meter duly providing sealing after testing. (energy meter and box will be supplied by the deptt)
Labour charges for fixing of tube light fitting for street light
Dismantling of Single Phase Meters
Dismantling of Three Phase Meters
Laying & Erection of Service Wire Twin Core 4/6 mmsq
Laying & Erection of Service Wire Twin Core 10/16 mmsq
Dismantling of Service Wire Twin Core 4/6 mmsq
Dismantling of Service Wire Twin Core 10/16 mmsq
Installation of 3 Phase 4 Wire Progidy Energy Meter
Dismantling of 3 Phase 4 Wire Progidy Energy Meter
Erection of DB/METER Box on PCC/ST Poles
Fixing of Guard netting of HT/LT Line
Dismantling/bundling of Guard netting of HT/LT Line
Fixing/Crimping of Thimbles/Lugs of size 25sqmm to 75sqmm
Fixing/Crimping of Thimbles/Lugs of size 75sqmm to 185sqmm
Fixing/Crimping of Thimbles of size 185sqmm above
Fixing of spacers for LT Line for 5 wires system
Fixing of spacers for LT Line for 4 wires system
Fixing of spacers for LT Line for 3/2 wires system
Installation of MS V- Cross arm
Installation/Erection of MS Cross arm upto 3fts long
Installation of MS Cross arm above 3fts to 6fts long
Installation of MS Cross arm above 6fts to 10fts long
Fixing/ Erection of Braces
Dismantling of Braces
Fixing of Top Clamp for Pin Insulator(HT)/PG clamp
Dismantling of Top Clamp for Pin Insulator(HT)/PG clamp
Fixing of U/D Clamp for LT insulator
Dismantling of U/D Clamp for LT insulator
Dismantling of Cross Arm upto 3ft long
Dismantling of Cross Arm above 3ft to 6fts long
Dismantling of Cross Arm above 6ft to 10fts long
Dismantling of V Cross Arm
Replacement/Refitting of HT Bush Rod at site
Replacement/Refitting of HT Bushing at site
Replacement/Refitting of LT Bush Rod at site
Replacement/Refitting of LT Bushing at site
Fixing of Bi- Metallic Clamps
Fixing of Aluminium Jointing Sleeve
Fixing of Wedge connectors/PG clamps
Stone Pad(300mmX300mmX75mm)
Topping of oil in DT at site
Carriage of Material for repair and maintenance work at site upto 100mtrs
Carriage of Material for repair and maintenance work at site for subsquent 100 Mtr
Providing code numbers to transformers / structures including cost of paint.
Charges of Crane / Hydra for loading and unloading works at site (like DT/HT/LT poles and other allied material on per hour basis)
Erection of Pipe Earthing using CI/GI pipes including pit excavation, backfilling, charcoal&salt/betonite powder and cement collar of 2' dia and 1' height etc complete
Erection of Spike Earthing as per IS Standards
Charging for Re- stringing of Loose Span
Erection of Strut in DP structure
Dismantling of Strut in DP structure
Fixing/unfastening of Nuts/Bolts/Washers (Galvanized of sort) as per IS standards
Concreting of pole of pit of size 2'x2'x5' (0.6mx0.6mx1.5m) with C.C(1:4:8) using 40mm HBG metal.
Concreting of pole of pit of size 2'x2'x5' (0.6mx0.6mx1.5m) with C.C(1:3:6) using 20mm and 12mm HBG metal.
Concreting of stay pit of size 1'-6" x 1'-6" x 4'6" (0.45mx0.45x1.35m) with C.C. (1:4:8) using 40 mm and 20mm HBG metal
Concreting of stay pit of size 1' 6"x 1'-6" x 4' 6"(0.45mx0.45x1.35m) with C.C. (1:3:6) using 20 mm and 12mm HBG metal
Installation/Fixing of Street Light fixture
Dismantling/unFixing of Street Light fixture
Labour charges for Survey and pit marking of HT/LT lines in Plain area
Labour charges for Survey and pit marking of HT/LT lines in Hilly area
Excavation of pits in all soils, i.e, mixture of gravel and soft disintegrated rock like shales ordinary gravel, stony earth and earth mixed with fair sized boulders.
for 8mtr and 9 mtr STpoles
for 11mtr and 13 mtr STpoles
for 8mtr and 9 mtr PCC poles
for 11mtr and 13 mtr PCC poles
Supply and installation of Chain link security Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations with PCC(1:3:6) and chain link fencing mesh of 8guage 50.8mm x 50.8mm(2'' x 2'') size, MS angle 50 x 50 x 6, MS flat 25 x 6 ft height, bolts,nutsAldrop, hinges, with access doora nd locking facility including Painting with one coatred oxide, 02 coats aluminum paint of approved brand and Manufacture to give an even shade.(Material will be provided by the Division)
Carriage of Dismantled Material from site upto 100mtrs for Write Back to Divisional Store
Carriage of Dismantled Material from site upto 100mtrs for Write Back to Divisional Store for subsequent 100mts carriage from site
Unloading of write back Material/ other material for maintenance work
Loading of write back Material at site for operation -Maintenance work
Hiring Charges of Tractor with Trolley for shifting of material (including POL and operation charges)
Hiring Charges of Mini Truck/Carrier for shifting of material (including POL and operation charges)
Labour charges for erection of LT Dist. Box including earthing as per departmental standards.
Erection of AB switches: 11 KV AB switch (400Amps)
Erection of 1-Ph 11KV AB Switch, Operating rod
AB Switch OFF & ON Base with Clamp
Earthing of DTR:Running of No 8 G.I wire from Distribution Transformer (3 Phase) AB Switch, HG Fuse Set V’X’ Arm etc running of 14 SWG G.I. Wire including double earthing as per specification for running of total 10 Nos GI wires. (Per Lead Per length)
General Tree/ Branches pruning/cutting per one day - Semi skilled labour
Earthing of DTR:Running of No 8 G.I wire from Distribution Transformer (3 Phase) AB Switch, HG Fuse Set V’X’ Arm etc running of 14 SWG G.I. Wire including double earthing as per specification for running of total 10 Nos GI wires. (Per Lead Per length)
Fixing of Bobin Insulator
Bidder Name
R K ELECTRICALS CONSTRUCTION AND SUPPLIERS
M/S PIONEER ENGINEERS
M/S MENGI CONTRACTOR
M/S CLEAR LINE ENGINEERS CONTRACTOR
SHAKEEL AHMED SHEIKH
R K ELECTRICALS CONSTRUCTION AND SUPPLIERS
MR INFRA ASSOCIATES
M/S SURYA ENTERPRISES
TM GROUP OF COMPANIES
WINCARE
THAPPA ELECTRICAL CONSTRUCTION AND SUPPLIERS
M/s Intel Technocrates
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .