Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.7 CrQualified 118 SHANTA INDUSTRIAL ESTATE I B PATEL ROAD GORGEOAN EAST MUMBAI CITY MAHARASHTRA 400063 | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | ₹54.7 Cr | L1 | Qualified |
| 2 | L3₹60.8 CrQualified 3 C 301 320 SOLARIS 1 SAKI VIHAR ANDHERI POWAI MAHARASHTRA 400072 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹60.8 Cr | L3 | Qualified |
| 3 | L4₹63.0 CrQualified 40 F 4TH FLOOR CYBER TOWER VIBHUTI KAHND GOMTI NAGAR LUCKNOW UTTAR PRADESH 226010 | LUCKNOW | UTTAR PRADESH | 226010 | ₹63.0 Cr | L4 | Qualified |
| 4 | Qualified 40 F 4TH FLOOR CYBER TOWER VIBHUTI KAHND GOMTI NAGAR LUCKNOW UTTAR PRADESH 226010 | LUCKNOW | UTTAR PRADESH | 226010 | - | - | Qualified |
Tender Value
Refer Docs
EMD Value
₹49.9 L
Closing Date
30 May 2022, 2:00 pmClosed
Augmentation of IT Infrastructure
3380079
GEM/2022/B/2157671
Augmentation of IT Infrastructure,Augmentation of IT Infrastructure,Augmentation of IT Infrastructu
Unknown (Unspecified Location)
Total value wise evaluation
BOQ
6 documents required · 6 mandatory
3 yrs
₹15 Cr
₹25.0 Cr
10%
₹49.9 L
30 May 2022
6 May 2022
30 May 2022
| Item No | Item Title | Description | Qty | Unit | Consignee |
|---|---|---|---|---|---|
| 1 | Augmentation of IT Infrastructure | SD WAN Equipments in HA with five years support along with all the Active Networking compnents with five years support along with Broadband connectivity/Internet Lease Line from two different service providers. | 1 | No | gss@bestmmd |
| 2 | Augmentation of IT Infrastructure | Supply of Passive Components like Fiber components, Coper components, HDPE pipes, conduits etc. and the labour cost like Digging & refilling Termination etc. | 1 | No | gss@bestmmd |
| 3 | Augmentation of IT Infrastructure | Commissioning and Implementation of Active Directory & Domain Environment Importance which includes supply of servers and Other Software Licenses for around 2800 users along with Centralized Anti virus and Hardware | 1 | No | gss@bestmmd |
| 4 | Augmentation of IT Infrastructure | Project management & documentation | 1 | No | gss@bestmmd |
| 5 | Augmentation of IT Infrastructure | Cost of Four Engineers for a support for Five Years | 1 | No | gss@bestmmd |
| 6 | Augmentation of IT Infrastructure | AMC Cost (Hardware) of SDWAN Equipments at all Locations. (Hardware cost per annum) | 1 | No | gss@bestmmd |
| 7 | Augmentation of IT Infrastructure | Subscription cost (Software) of SDWAN Equipments at all locations.(Subscription cost per annum) | 1 | No | gss@bestmmd |
| 8 | Augmentation of IT Infrastructure | Broadband Cost / ILL Cost from two service providers at all locations.(Cost of two links for 107 locations per annum) | 1 | No | gss@bestmmd |
| 9 | Augmentation of IT Infrastructure | AMC Cost (Hardware) of Networking Equipments at all Locations. (Hardware cost per annum) | 1 | No | gss@bestmmd |
| 10 | Augmentation of IT Infrastructure | AMC Cost (Hardware) of Servers that has hosted AV applications, Domain etc. (AMC cost for all servers per annum) | 1 | No | gss@bestmmd |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3380079.pdf
GEM_BID
request-for-proposal-bes-t_2022-05-06-16-16-56_797fcddd891d609c2477a502c7c7c11f.pdf
BOQ
boq-xls_2022-05-06-16-16-56_1d5cd6431aec2b76b8014e00d4e6053a.csv
BOQ
termsCondition.pdf
OTHER
Download all tender documents and submit your bid