| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC Rate is in Estimate value |
| 2 | L2₹2.5 LRejected-AOC | ₹2.5 L | L2 | Rejected-AOC Rate is too high |
| Sl No | Description | Qty | Unit | SOMU CONSTRUCTIONS L1 | KAVYA BUILDERS& CO L2 |
|---|---|---|---|---|---|
| 1.00 | Plastering with Cement Mortar 1:3 (One cement and Three crushed stone sand), 12mm thick mixed with water proofing compound conformaing to BIS at 2% by weight of cement used including finishing, curing, etc. complete in all floors complying with standard specification and as directed by the University Engineer. | 78 | m² | 320 ₹24,960 | 335 ₹26,130 |
| 2.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid) | 34 | m² | 1,375 ₹46,750 | 1,450 ₹49,300 |
| 3.00Cement Concrete 1:1-1/2:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and three crused stone sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the University Engineer. | |||||
| 3.01 | a) For foundation and basement | 7 | m³ | 9,750 ₹68,250 | 10,500 ₹73,500 |
| 4.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 6 | Qtl | 9,400 ₹56,400 | 9,600 ₹57,600 |
| 5.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding cahrges etc., complete complying with standard specification and as directed by the University Engineer. | 25 | m² | 40 ₹1,000 | 48 ₹1,200 |
| 6.00 | GST @ 18% | 1 | GST Amount (in Rupees) | 35,525 ₹35,525 | 37,391 ₹37,391 |
Tender Value
₹2.3 L
Closing Date
26 Nov 2025, 3:00 pmClosed
REGISTRAR
The Registrar Bharathiar University coimbatore
Strengthening underground water storage sump in Elango Hostel in Barathiar University
2025_HE_623191_1
BU/UE/AEE/13D/D-916/2025-2026
Limited
Civil Works
Coimbatore
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
12 May 2026
13 Nov 2025
27 Nov 2025
13 Nov 2025
26 Nov 2025
13 Nov 2025
Amount
Plastering with Cement Mortar 1:3 (One cement and Three crushed stone sand), 12mm thick mixed with water proofing compound conformaing to BIS at 2% by weight of cement used including finishing, curing, etc. complete in all floors complying with standard specification and as directed by the University Engineer.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:1-1/2:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and three crused stone sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the University Engineer.
a) For foundation and basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding cahrges etc., complete complying with standard specification and as directed by the University Engineer.
KAVYA BUILDERS& CO (BID ID -1518758)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_745183.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid