Tender Value
₹6.7 L
EMD Value
₹14,000
Closing Date
26 Apr 2022, 6:00 pmClosed
SE EDC Chitrakoot
SE EDC CHITRAKOOT
Work Of Bundelkhand Expressway line shifting from Bharatkup to Chitrakoot under EDD Chitrakoot
2022_DVVNL_691240_1
05/SE/EDCCkt/2022-23
Open Tender
Electrical Works
Piece-work
90 days
CHITRAKOOT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹14,000
28 Apr 2022
21 Apr 2022
27 Apr 2022
21 Apr 2022
26 Apr 2022
21 Apr 2022
Amount
Cartage of Pole & material from store centre from any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.
G.I pipe 6 mm Dia
11 Mtr. STP
11 KV XLPE 3X300 sqmm Cable
Erection of 11 Mtr. Single ST Pole including complete. 33 KV Line as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of 11 Mtr. Single ST Pole & Fixing of Stone Pad 300x300x75 mm. as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of 11 Mtr. ST Pole for DP Structure including complete. 33 KV Line fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of DP 11 Mtr. ST Pole as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of 11 Mtr. ST Pole for Tri Pole Structure including complete. 33 KV Line fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Tri Pole 11 Mtr. ST Pole as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of 11 Mtr. ST Pole for Four Pole Structure including complete. 33 KV Line fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Four Pole 11 Mtr. ST Pole as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of PG Clamps
Fixing & Commisioning of 33 KV Top/T-off/Drapper Channel as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Commisioning of 33 KV Bracing Angle as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying of GI Pipe through boaring Matherd as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying of 11 KV XLPE 3x300 sqmm cable as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Hosting of 11 KV XLPE 3x300 sqmm cable at Mounted DP as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Supply & Fixing of 11 KV XLPE 3x300 sqmm O/D Terminal Jointing Kit as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Supply & Fixing of 11 KV XLPE 3x300 sqmm Straight Through Terminal Jointing Kit as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
RE-work of Cable Laying
Shifting of Transformer
M/S KAMDGIRI CONSTRUCTION
JAY SHREE ENTERPRISES
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .