Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.8 LAccepted-AOC KUNJ BHAVAN JARHI BHATGAON COLLIERY BHATGAON SURGUJA CHHATTISGARH 497235 | SURAJPUR | CHHATTISGARH | 497235 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | - | Rejected-Technical Rejected as L-3 | |
| 3 | Rejected-Technical AMLAI COLLIERY ANUPPUR MADHYA PRADESH 484114 | AMLAI | ANUPPUR | MADHYA PRADESH | 484114 | - | Rejected-Technical Rejected as L-2 | |
| 4 | Rejected-Technical GRAM POST KARKATI VIA BURHAR KARKATI SHAHDOL MADHYA PRADESH 484110 | SHAHDOL | MADHYA PRADESH | 484110 | - | Rejected-Technical Rejected as L-4 |
Tender Value
₹31.0 L
EMD Value
₹38,800
Closing Date
13 Feb 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 32 nos RCC Isolation stoppings in proposed. development and depillaring panel of Burhar VI Bottom and V seam at Damini UG Mine of Sohagpur Area
2023_SECL_269745_1
SECL/SGP/ET/2223/604dt02/02/23
Open Tender
Civil Works - Others
Item Rate
365 days
Damini UG Mine
As per NIT
8 documents required · 8 mandatory
₹38,800
9 Mar 2023
2 Feb 2023
15 Feb 2023
2 Feb 2023
13 Feb 2023
3 Feb 2023
2 Feb 2023 - 9 Feb 2023
Amount
Item Description/ Heading Part (A) labour Cost
Cleaning/removal of malma /muck from UG sump and stacking within 50m distance . 32 X 8.00m. X 4.50m. X 0.25m. = 288 .00m3
Groove cutting in soft stone In roof – 32X(5.50m.x0.30m.X0.15 m.) =7.92m3 In floor – 22X(5.50m.x0.30m.X0.15 m.) = 5.44m3 Total = 13.36 m3
Groove cutting in coal/shale - In floor – 10X(5.50m.x0.30m.X0.50 m.) = 8.25m3 In side – 2X32 (2.80m.x0.30m.X0.50 m.)= 26.88m3 Total = 35.13m3
Reinforced cement concrete (1:2:4) in Wall /roof ceiling of air crossing/stopping (any thickness)in u/g(Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials). Wall – 22X 5.50m. X 3.10.m X 0.30m.= 112.53m3 10X 5.50m. X 3.45m. X 0.30m.= 56.92m3 Total = 169.45m3)
Centring, shuttering, finishing and reinforce- Ment including cutting, bending, placing in position and binding and strutting, propping etc complete. Wall – 32X 2.00m. X 4.50m. X 2.80m.= 806.40 m2
Cement concrete/PCC(1:2:4) in foundation /plinth/flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials). In floor- 32X4.50m. X 1.00m.X0.05m.) = 7.20 m3 Water tank- 7X 2.20m. X 0.70m. X0.10m.= 1.08 m3 Total = 8.28 m3
6 mm thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete (exclusive cost of materials) In wall- 32X2 X (4.50m. X 2.80m. ) = 806.40 m2
12mm thick cement plaster (1:6) on brick work up to 5.0m and above in u/g including curing etc Complete (exclusive cost of materials) In sides of galleries-32X2 X (2.80m. X 1.00m. ) = 179.20 m2 In roof- 32X4.50m. X 1.00 m) = 144.00 m2 TOTAL = 323.20 m2
White washing in under ground with white lime to give an even shade on old work/ new work- In wall- 24X (4.50m. X 2.80m. ) = 302.40 m2 In sides of galleries- 24X2 X (2.80m. X 1.00m. ) = 134.40 m2 In roof- 24X4.50m. X 1.00m) = 108 m2 TOTAL = 544.80 m2
Loading of all kind building materials in to tub at Inc. mouth- a) Stone chips - 158.00 m³ b) Sand - 90.00 m³ c) Cement - 41.00 m³ d) Steel rod(12) - 0.87 m³ TOTAL = 289.87 m³
Transportation of all kind of building material from surface to u/g through haulages with tram ing and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface
Unloading of all kind building materials in to tub at destination
Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75m
Pushing of tub for every 30m after free pushing of first 30.00m upto 480m. (480-30=450/30= 15*4.33=64.95/ m3)
Part-B Material Cost supply and stacking of building materials Cement
Stone chips(20mm)
Steel rod( 12mm)
Total impact of GST for the purpose of CTC
UDAY RAJ SINGH
RAVI KUMAR JAISWAL
VIKASH KUMAR VISHWAKARMA
stage.html
html • 0.04 MB
techsummary_279095.pdf
PDF • 0.14 MB
finsummary_279095.pdf
PDF • 0.08 MB
AOC604.pdf
PDF • 1.67 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .