| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.2 LAdmitted-Finance 5 361 AWAS VIKAS MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | -25.95% | ₹30.2 L | L1 | Admitted-Finance |
| 2 | L2₹34.3 L+₹4.1 L (13.6%)Admitted-Finance UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | -15.86% | ₹34.3 L+₹4.1 L (13.6%) | L2 | Admitted-Finance |
| 3 | L3₹38.8 L+₹8.5 L (28.3%)Admitted-Finance | -5.00% | ₹38.8 L+₹8.5 L (28.3%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical AS PER DOCS |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical AS PER DOCS |
Tender Value
₹40.8 L
EMD Value
₹81,611
Closing Date
16 Apr 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-03 me Lakshmi Talkies Chauraha se Vikas Bhawan hote hue Kachahi Chauraha tak nala nirmaan evam side patri ka saundaryikaran karya.
2026_NNAMC_1132638_1
16.04.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,838
AS PER DOCS
₹81,611
20 May 2026
3 Apr 2026
16 Apr 2026
3 Apr 2026
16 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30Mtr. Including filling watering and ramming of excavated earth into the treches of into the space between the building and the sides of foundation treches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. Excluding GST(S.I. No. 251) | - | cum | - | - |
| 2 | Earth work in filling or in embankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20") in depth and earth work in embankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m (100) distance as directed by the E/L. Excluding Cost of Royalty. (S.I. No. 253) | - | Sqm | - | - |
| 3 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 FM. and cement in proportion of 12:6:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Excluding GST (S.I. No. 273) | - | Sqm | - | - |
| 4 | Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement: 3 coarse sand). | - | cum | - | - |
| 5 | Construction of Granular sub base (G.S.B.) by providing closed graded material mising by mix I place method including water and compacting with vibratory rollers as per MORT & H specification 401 | - | cum | - | - |
| 6 | M-150 Brick work in 1:4 (one cement & four fine sand) of F.M. 1.25 morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST (S.L. No. 305) | - | cum | - | - |
| 7 | 12mm thick cement plaster in(1:4) cement fine sand mortar 7 including supply of all material, labour, T&P ete required for proper completion of work(S.I. No.-13.11C) | - | cum | - | - |
| 8 | R.C.C. work with cement approved coarse sand and 2cm. Gauge approved stone grit in proportions of 1:1.5:3) in slab excluding supply of reinforcement and its bending but including its fixing 8 and Binding wire and including necessary all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making a drip coarse which shall be paid as directed by E/L.(S.I. No. 284A) | - | Cum | - | - |
| 9 | M.S. (tor steel or plain) in plain work such as R.C.C. or R.B work including bending for peoper shape and including supply of 9 steel and its wastage bend, hooks and autorised overlapping shall be measured and including cost of binding wire. Excloding GST(S.1. No. 504) | - | Cum | - | - |
| 10 | Cement concrete with 20mm gauge approved stone ballast, coarse sand and cement in proportion of 1:1.5:3 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Excluding GST (S.I. No. 2798) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2114015.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .