Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M MAHESHKANNAN L1 | B BHAVANI L2 |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation for foundation in Hard stiffclay, stiff black cotton, hardre dearth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20 Band Sand, silt or other loose soil, wets and, or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete10cum | 46 | m3 | 289.9 ₹13,335.40 | 303.2 ₹13,947.20 |
| 2.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not morethan15cm.thick well rammed watered and compactedetc.,complete complying with standard specification. | 4 | m3 | 675.1 ₹2,700.40 | 706.2 ₹2,824.80 |
| 3.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 4 | m3 | 6,488.2 ₹25,952.80 | 6,786.7 ₹27,146.80 |
| 4.01 | Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height (the retrived materials) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid ( vertical portion ) 10m2 | 67 | m2 | 1,180.2 ₹79,073.40 | 1,234.5 ₹82,711.50 |
| 5.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 1,280 | Kg | 95.3 ₹1.2 L | 99.7 ₹1.3 L |
| 6.01 | Reinforced Cement Concrete 1:11/2:3 using 20mm hard broken gauge granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc. complete (FF) | 16 | m3 | 9,963.5 ₹1.6 L | 10,421.8 ₹1.7 L |
| 7.01 | Add GST 18% | 1 | GST | 72,449.1 ₹72,449.10 | 75,781.8 ₹75,781.80 |
Tender Value
₹4.8 L
EMD Value
₹4,754
Closing Date
23 Jan 2026, 10:00 amClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Construction of Storm Water Drain Culvert at Fathima Nagar in Ward No.63.
2026_MAWS_640708_1
Z2 / E1 / EST.526 / 2025-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,754
18 Feb 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
Earthwork excavation for foundation in Hard stiffclay, stiff black cotton, hardre dearth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20 Band Sand, silt or other loose soil, wets and, or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete10cum
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not morethan15cm.thick well rammed watered and compactedetc.,complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height (the retrived materials) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid ( vertical portion ) 10m2
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforced Cement Concrete 1:11/2:3 using 20mm hard broken gauge granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc. complete (FF)
Add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
1.pdf
Tender Documents • 0.84 MB
BOQ_767265.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid