| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Awarded as L1 Bidder |
| 2 | L2₹1.2 Cr+₹9.7 L (8.98%)Rejected-AOC SONTOLA P O MIRZA P S PALASBARI DISTRICT KAMRUP R ASSAM | ₹1.2 Cr+₹9.7 L (8.98%) | L2 | Rejected-AOC R |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
10 Jan 2020, 2:00 pmClosed
CE, Officer, Kamrup Zila Parishad
O/O The CE, Officer, Kamrup Zila Parishad
Construction of new ZP office building at Amingaon under 4th ASFC/2011-12
2019_PNRD_15367_1
KZP(D)61/203-14/Pt-I/4107 ZP office
Open Tender
Civil Works - Building
Item Rate
365 days
Amingan
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,000
Chief Executive Officer, Kamrup Zila Parishad
₹2.3 L
Yes
O/O The CE, Officer, Kamrup Zila Parishad
5 Mar 2021
18 Dec 2019
10 Jan 2020
18 Dec 2019
10 Jan 2020
18 Dec 2019
19 Dec 2019
Amount
Providing cast in-situ manually driven reinforced cement concrete piles of using required grade of cement concrete of required bore-diameter, bulb diameter, lengths and with reinforcement as per specifications and drawings. Reinforcement to be measured and paid seperately as per item no. 21.4.1 C) UNIFORM PILE d) Pile Dia 400 mm ii) Above 10 M
Supplying, fitting and fixing in position reinforcement bars conforming to relevent IS code, for reinforced cement concrete works in piles including straightening, cleaning, cutting and bending to proper shapes and length as per specifications and drawings. The rings should be welded with vertical reinforcements as per specified IS codes of practice. (Inclusive of lap length, hook, chair, bend, anchor...etc) B) TMT bar of other ISI marked (From Secondary producer)
Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level. (a) In ordinary soil
Earth/ sand filling in plinth in layers not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified including payment of land compensation, forest royalty, sales tax and other duties and taxes as may be necessary. (a) With river sand or silt ( predominatly non plastic) by truck carriage including loading and unloading
Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) a) From Primary Producer: TATA/SAIL/Esser Steel/Jindal steel/shyam steel/RINL ii) Super Ductile (SD) TMT reinforcement bars
Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1cement: 3 sand :6 coarse aggregate by volume
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) A) In substructurre up to plinth level Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level. N) Without using admixture, plasticiser b) M20 grade concrete or Prop 1:1, 5:3
B) In super structure from plinth level up to 1st floor level ii) Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase (except spiral staircase and landing ) including preparing the top surface and finishing of nosing. N) Without using admixture, plasticiser b) M 20 grade concrete or prop 1:1, 5:3
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc. (a) Using 25 mm thick plank
Sides of tie beams, grade beams etc. at or below ground level. (ii) Using 25 mm thick plank
Columns, Pillars, Posts & Strut (a) Square, Rectangular, polygonal in plan or any shape like Tee/L etc. having plane vertical face (i) Using 25 mm thick plank
Sides and Soffits of Beams, beam haunchings, cantilever girders, bressumers, lintels and horizontal ties. (a) For depth not exceeding 1.0M. (i) Using 25 mm thick plank
Flat Surfaces such as soffits of suspended floors, roofs, landings, cantelever slabs, chajjas, balconies and the like. (a) Floors etc. upto 200mm in thickness. (i) Using 25mm thick plank
Staircase with sloping or stepped soffits indluding risers and stringers but excluding Landing. (Using 38mm thick plank)
Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (a).Brick on flat soling.
Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed. (I) In Sub-structure upto plinth level including dewatering if necessary (a) In proportion 1:4.
JBS CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .