Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
26 Dec 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
TOURISM DEVELOPMENT AUTHORITY SHOPIAN-DUBJAN-PEER-KI-GALI
Construction of Cement Concrete Drain around Eco Log Huts at Bohrihalan Shopian.
2020_Tourm_111584_1
FRESH ENIT 8
Open Tender
Civil Works
Item Rate
20 days
SHOPIAN
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
TOURISM DEVELOPMENT AUTHORITY SHOPIAN
₹10,000
Yes
28 Dec 2020
15 Dec 2020
28 Dec 2020
15 Dec 2020
26 Dec 2020
15 Dec 2020
90 days
Amount
Earth work in excavation by mannual means in foundation of trenches, drains, pipes and cables etc not exceeding 1.5 mts in width, 1.5 mts in depth and10 sqm in plan including dressing of sides and ramming of bottoms, lift upto 1.5 mts including getting out exacavated soil and disposal of excavated soil as to be levelled and neatly dressed within a lead of 50 mts, all kinds of soil complete.
Supplying and filling dry Boulder stone soling tightly packed under foundation and under floors including dressing, all carriages upto the site of work complete.
Providing and laying in position cement concrete 1:4:8 (1 cement: 4 coarse sand:8 crushed stone aggr. 40mm in nominal size) excld. the cost of centering and shuttering, all work up to plinth level including all carriages complete job.
Providing and laying of cement concrete in 1:2:4 (1 cement: 2 coarse sand: 4 graded crushed stone aggr. 20mm n/size) excld. the cost of centering and shuttering including all carriages complete job.
Centering and shuttering incld. strutting ,propping etc. and removal of form work for (12mm thick water proof ply wood) and removal of the same.
Supplying and laying with river sand mixed with boulder in 20 cm layers including watering complete
P/Laying 50mm thick concrete of 1:2:4 flooring including finishing with neat coat of cement slurry including all carriage.
12mm cement plaster on the rough side of single or half brick wall of mix 1:4(1 cement:4 coarse sand) including all carriage/head lodad upt to the site of work complete
M/S AADIL HUSSAIN MIR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .