Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.0 LAccepted-AOC HOUSE NO 115 GALI NO 3 ADC COLONY SIRSA 125055 | SIRSA | SIRSA | HARYANA | 125055 | 1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | Krishan Kumar Aggarwal Contractor L1 |
|---|---|---|---|---|
| 1.00N.S. Item | ||||
| 1.01 | Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (upto 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 55 BHP x 24 Month = Total 1320 BHP | 1,320 | No. job | 116.5 ₹1,53,780 Lowest |
| 2.00 | Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (more than 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 880 BHP x 24 Month = Total 21120 BHP. | 21,120 | No. job | 116.5 ₹24,60,480 Lowest |
| 3.00 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (more then 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 355 BHP x 24 Month = Total 8520 BHP. | 8,520 | No. job | 127 ₹10,82,040 Lowest |
| 4.00 | Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (upto 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 100 BHP x 24 Month = Total 2400 BHP. | 2,400 | No. job | 127 ₹3,04,800 Lowest |
Tender Value
₹35.1 L
EMD Value
₹70,200
Closing Date
9 Mar 2026, 11:00 amClosed
BALVINDER NAIN
Fatehabad PHED
Maintenance/ Repair of Horizontal Split Casing pumping sets for Clear Water, Submersible pumping sets in Various Boosting Station and ,Tubewells etc. complete in all respect. (For 43 months w.e.f. Date of commencement)
2026_HRY_505529_1
20262E004CE1 F94B 470F 8BE7 A5149B25B034584PUH
Open Tender
Civil Works
Works
730 days
Fatehabad
2 documents required · 2 mandatory
₹5,000
Yes
₹70,200
Yes
10 May 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
N.S. Item
Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (upto 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 55 BHP x 24 Month = Total 1320 BHP
Maintenance/ Rewinding / Repair of Horizontal centrifugal pumps consisting of motor, pump, starter, cable, panel board (more than 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 880 BHP x 24 Month = Total 21120 BHP.
Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (more then 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 355 BHP x 24 Month = Total 8520 BHP.
Maintenance/ Rewinding/ Repair of Submersible motor, pumps consisting mainly including of motor, pump, starter, cable, panel board (upto 20 HP) for 12 month (From the date of commencement) and all other works mentioned in Scope of Work. 100 BHP x 24 Month = Total 2400 BHP.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_584251.xls
BOQ • 0.23 MB
PE4BVEZ139061.pdf
Additional Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .