Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.6 LAdmitted-Fee/PreQual/Technical/Finance | -34.75% | ₹17.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.5 L+₹95,695.63 (5.44%)Admitted-Fee/PreQual/Technical/Finance AT HARIPUR PO KHADIANGA P S BADACHANA DIST JAJPUR | JAJPUR | ODISHA | -31.20% | ₹18.5 L+₹95,695.63 (5.44%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.1 L+₹1.5 L (8.81%)Admitted-Fee/PreQual/Technical/Finance | -29.00% | ₹19.1 L+₹1.5 L (8.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹20.2 L+₹2.6 L (14.9%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹20.2 L+₹2.6 L (14.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹21.0 L+₹3.4 L (19.5%)Admitted-Fee/PreQual/Technical/Finance | -22.00% | ₹21.0 L+₹3.4 L (19.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.0 L
EMD Value
₹27,000
Closing Date
3 Sept 2026, 5:30 pmClosed
SUPERINTENDING ENGINEER, MND-I, JAGATPUR
SUPERINTENDING ENGINEER, MND-I, JAGATPUR
Improvement to Disty-1A of H.L.C Range-l inbetween RD 0.250 Km to 1.00 Km Near village Napanga for the year 2026-27
2026_CELBB_139492_16
MND-03 OF 2026-27
National Competitive Bid
Civil Works - Others
Percentage
120 days
NURTANGA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹27,000
Yes
8 Sept 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
25 Aug 2026 - 31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in all kind of soil with all leads, lifts, & delifts including dressing & leveling the bed and depositing the excavated materials away from worksite with all leads lifts and delifts etc complete as per direction of the Engineer-in-charge. | 347.4 | 100 Cum | 21,052 | ₹73,13,464.8 |
| 2 | Filling foundation & Plinth with sand including watering & rammed with all labour, T&P, taxes and cess etc. complete as directed by the Engineer-in-Charge. | 32.4 | One Cum | 541.4 | ₹17,541.36 |
| 3 | Rigid and smooth centring and shuttering for R.C.C. works including false work and dismantling the same after casting including cost and carriage of all labour etc complete in as per direction of the Engineer-in-charge.
a) Walls and fins | 481 | One Sqm | 1,088.7 | ₹5,23,664.7 |
| 4 | b) Foundation & Plinth | 72.9 | One Sqm | 250.2 | ₹18,239.58 |
| 5 | Cement Concrete (1:3:6) grade with 40mm and downgraded black hard granite (crusher broken) stone chips including hoisting and laying etc with all labour, material, T&P, royalty, DMF, EMF, Addl. Charges, taxes and CESS etc. complete as per specification and direction of the Engineer-in-charge. | 32.4 | One Cum | 6,662.9 | ₹2,15,877.96 |
| 6 | R.C.C work of M-20 grade with 20mm size hard granite (Crusher broken) stone chips including hoisting and laying including cost, carriage, royality, DMF, EMF, Addl. Charges,and taxes of all materials etc complete as per direction of the Engineer-in-charge. | 114 | One Cum | 6,966.2 | ₹7,94,146.8 |
| 7 | Supplying, fitting, fixing and placing uncoated HYSD bar reinforcement including 5 percent wastage including cost, carriage, all other taxes of HYSD bar binding wire etc. complete as per drawing specification and direction of the Engineer-in-charge. | 115.31 | One Qntl | 8,898.8 | ₹10,26,120.63 |
| 8 | Filling foundation & Plinth with excavated materials including watering & rammed with all labour, T&P, taxes and cess etc. complete as directed by the Engineer-in-Charge. | 115.8 | 100 Cum | 11,695.5 | ₹13,54,338.9 |
| 9 | Puddle filling with good clay with initial lead and initial lift etc complete as per direction of the Engineer-in-Charge. | 19.65 | One Cum | 509.9 | ₹10,019.53 |
| 10 | Providing weep holes in brick masonry/ plain/reinforced concrete abutments, wing walls/return walls with 100mm dia A.C pipe etc. with all labour, materials, T&P, royality with EMF, DMF, Additional Charges , taxes and cess etc. complete as per specification and direction of the Engineer- in-Charge. | 30 | One Rm | 112.1 | ₹3,363 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
16.pdf
Tender Documents • 3.89 MB
BOQ_607200.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .