| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-AOC 566 PONNIAMMAN KOIL STREET THIRUVENKATAPURAM PONNERI 601204 | PONNERI | TIRUVALLUR | TAMIL NADU | 601204 | L1 | Accepted-AOC Lowest Amount Quoted BY A S BHUVANESH KUMAR (4947920.80) accepted | |
| 2 | L2₹55.5 L+₹6.1 L (12.2%)Rejected-Finance | L2 | Rejected-Finance Above Estimate Rate | |
| 3 | Not Admitted-Fee/PreQual/Technical 16 PERUNAL KOIL STREET VEMBEDU VILLAGE AMBUR POST PIN 635701 THENI TAMIL NADU | TIRUPATHUR | TAMIL NADU | 635701 | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished | |
| 4 | Not Admitted-Fee/PreQual/Technical CHENNAI CIRCLE CHENNAI 6 | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹50.2 L
EMD Value
₹51,000
Closing Date
3 May 2023, 3:00 pmClosed
Additional Collector(D)/Project Officer
Additional Collector(D)/Project Officer DRDA Tiruvallur
1.RENEWAL OF BT ROAD IN RK pet pallipat Road to Venkatapuram colony At Karlambakkam Panchayat In Pallipat Block2.RENEWAL OF BT ROAD IN RK pet pallipat Road to Venkatapuram At Karlambakkam Panchayat In Pallipat Block Pac.16
2023_RDTN_305250_1
DIPR/2142/TENDER/2023
Open Tender
Civil Works - Roads
Item Rate
90 days
Pallipet Block
Class II and above
5 documents required · 5 mandatory
₹0
₹51,000
Yes
DRDA Tiruvallur
13 Jul 2023
24 Apr 2023
3 May 2023
24 Apr 2023
3 May 2023
25 Apr 2023
25 Apr 2023
Amount
1. RENEWAL BT ROAD FROM R K PET PALLIPET ROAD TO VENGATAPURAM COLONY KM 0/0 - 1/050 @ KARLAMBAKKAM PANCHAYAT
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying 50 MM Compacted thick Bituminous macadam using Plastic 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Provision for HM Stone Charges etc,..
Provision for KM Stone Charges etc,..
Provision for Sign Board Charges etc,..
Provision for Name Board Charges etc,..
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Rumble Stripes
Provision for Provision for Road mark / Road Stud with lens Reflector Charges etc,.. Charges etc,..
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
2. RENEWAL BT ROAD FROM R K PET PALLIPET ROAD TO VENGATAPURAM ROAD KM 0/0-1/140 @ KARLAMBAKKM PANCHAYAT PALLIPET Block .
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying 50 MM Compacted thick Bituminous macadam using Plastic 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25% of 12mm, and10% of 6mm IRC metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc. complete. - 75mm uniform thickness
Provision for HM Stone Charges etc,..
Provision for KM Stone Charges etc,..
Provision for Sign Board Charges etc,..
Provision for Name Board Charges etc,..
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Rumble Stripes
Provision for Provision for Road mark / Road Stud with lens Reflector Charges etc,.. Charges etc,..
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/S. Sri Masilamani Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .