Tender Value
₹5.9 L
EMD Value
₹29,700
Closing Date
30 Sept 2026, 6:55 pm3d left
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CO drain from LO Rashid Dar to onwards (dal kul) at Charipora and Upgradation of dal road from LO to Nazir Ahmad Dar to onwards at Charipora
2026_RDPR_324690_31
NIT_72_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
PAKHERPORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
EXECUTIVE ENGINEER REW BUDGAM
₹29,700
Yes
15 Sept 2026
15 Sept 2026
1 Oct 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 M² on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 28.25 | Cum | 479.3 | ₹13,540.23 |
| 2 | Providing and laying of dry stone soling hand packed, plum including spreading , levelling and all carriages. | 26.6 | cum | 1,222 | ₹32,505.2 |
| 3 | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate (including carriage of all materials) | 48.97 | cum | 6,310 | ₹3,09,000.7 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 216.31 | Sqm | 286.35 | ₹61,940.37 |
| 5 | 6mm thick cement plaster of mix 1:3 (1 cement: 3 fine sand) including all carriages | 417.17 | Sqm | 240 | ₹1,00,120.8 |
| 6 | S/S and laying of GSB/Khakh Bajri filling at site of required size including compaction with PRR 8-10t, leads and lifts complete job | 47.66 | cum | 1,222 | ₹58,240.52 |
| 7 | Providing and laying reinforced cement concrete pipe (non pressure) for pipe culverts/crossings in single/double row in proper gradient as directed by EIC including jointing, trench excavation by mechanical means and backfilling the excavated earth and disposal of surplus excavated earth as directed (complete job) | 9.76 | m | 1,800 | ₹17,568 |
| 8 | Add provisions for signboard, Photographs and other unforseen items. | 1 | No | 1,100 | ₹1,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_1095455.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .