| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51.5 CrAdmitted-Finance H NO 04 GURHA BAKSHI NAGAR JAMMU | JAMMU | JAMMU | JAMMU AND KASHMIR | L1 | Admitted-Finance | ||
| 2 | L2₹52.2 Cr+₹67.1 L (1.30%)Admitted-Finance LANE NO 3 UMERABAD NEAR CITY HOSPITAL BATHINDI JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L2 | Admitted-Finance | ||
| 3 | L3₹59.3 Cr+₹7.8 Cr (15.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | - | Rejected-Technical Not Responsive | ||
| 5 | Rejected-Technical CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | - | Rejected-Technical Not Responsive |
Tender Value
₹51.6 Cr
EMD Value
₹1.2 Cr
Closing Date
25 Jun 2025, 2:00 pmClosed
Executive Engineer PWD RnB Nubra.
Executive Engineer PWD RnB Nubra.
Construction of Motorable Bridge from Burma to Sumoor Sand Dune. (including road work) (Under SDP)
2025_PWD_16368_1
16 of PWD RnB Nubra 2025-26
Open Tender
Civil Works - Bridges
Percentage
1080 days
Nubra
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
Executive Engineer PWD Nubra
₹1.2 Cr
28 Jul 2025
21 May 2025
27 Jun 2025
22 May 2025
25 Jun 2025
22 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site analysis, topographical survey, geotechnical survey, designing.supplying,fabricting and launching of 380 mtr span Intermediate Lane motorable steel girder bridge with class AA Loading between Burma to Sumoor Sand Dune Nobra i,e construction of abutments,Well/ Pile, fabrication and launching of bridge superstructure, providing and fixing of suitable bridge bearing, expension joints painting of all steel superstructure including laying of Deck slab, approach slab etc ( as Per Scope of work in NIT) | 380 | Rm | 9,74,500 | ₹37,03,10,000 |
| 2 | ROAD WORK Earth work in excavation by machenical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : including carriage | 7,928 | Cum | 278.09 | ₹22,04,697.52 |
| 3 | Dry stone pitching (any thickness) excluding cost of stones. On Horizont | 1,012.33 | Cum | 537.71 | ₹5,44,339.96 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) from natural source crushed aggregate. | 630 | Cum | 5,725.33 | ₹36,06,957.9 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2,818.3 | Cum | 9,557.34 | ₹2,69,35,451.32 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 973.93 | Cum | 6,606.08 | ₹64,33,859.49 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs havingslope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level,excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | 39.56 | Cum | 11,551.66 | ₹4,56,983.67 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,42,943.2 | Cum | 109.33 | ₹3,74,93,980.06 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for : foundation,bases of column,footing etc | 1,641.37 | Sqm | 306.15 | ₹5,02,505.43 |
| 10 | Suspended floors, roofs, landings, balconies and access platform | 105 | Sqm | 738.64 | ₹77,557.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
drawingBridge.pdf
Other Document • 2.50 MB
BOQ_40238.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .