Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC BANKOLA AREA BANKOLA AREA OFFICE P O UKHRA DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713363 | UKHRA | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.6 L+₹4,071 (1.57%)Rejected-Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
13 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Shifting of Two nos of HT Pump motor set along with electrical at 32L Main Sump at RVII seam at Shyamsundarpur Colliery under Bankola Area .
2023_ECL_290001_1
ECL/GM/BA/E TENDER/23-24/EnM/101 Dt. 28.09.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹3,300
23 Dec 2023
29 Sept 2023
14 Oct 2023
29 Sept 2023
13 Oct 2023
29 Sept 2023
29 Sept 2023 - 3 Oct 2023
Amount
Item Description/ Heading
Diasmantling of HT pum-p Motor at 31L/3ED and loading over trolleys and manually pulling them over floor from 31L/3ED to 30L/3ED and then pulling them manually over trackline to 33L/3ED
Laying of 6 inch dia MS pipes for delivery pipe line extension and then fitting them with rubber washer and dismantling of extension suction pipe with footvalve and transporting them to site and then laying and fitting of suction pipe with foot valve
Assembling of HT pump and motor overbase plate at 33L/3ED along with alignment and connection of suction and delivery line with NRV and sluice Valve and shifting of HT starter and cable laying from starter to motor .
Commissioning of pump at 33L/3ED and rectification of leakages .
Dismantling of HT pump motor set at 30L/4ED and loading over trolleys and then manually pulling them over trackline from 30L/4ED to 32L/4ED
Laying of 6 inch dia MS pipe for delivery pipeline extension and then fitting with rubber washer and dismantling of existing suction pipe with footvalve and transporting them to site and then laying and fitting of suction pipe with foot valve
Assembling of HT pump and motor overbase plate at 32L/4ED along with allignment connection of suction and delivery line with NRV and sluice valve and shifting of HT starter and cable laying from starter to motor .
Commissioning of pump at 32L/4ED and rectification of leakages .
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .