Tender Value
₹68.9 L
EMD Value
₹1.4 L
Closing Date
29 Jun 2026, 3:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
O/o Executive Engineer, PWD Division M-413, Under Ring Road Bypass Flyover, Opp. IGI Stadium Gate No. 9, New Delhi-110002
Desilting of drain from Amrit vihar to Shalimar Palace on Main Burari Road and Swaroop Nagar road due to sand deposition into PWD drain by DJB. (3rd Call)
2026_PWD_293990_1
31/EE/C and ND-R/PWD/2026-27
Open Tender
Civil Works
60 days
Sub. Division-1
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹1.4 L
20 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 90 | Cum | 2,434.25 | ₹2,19,082.5 |
| 0.0 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
| 0.0 | All works upto plinth level
Concrete of M25 grade with minimum cement content of 300 kg /cum | 204.75 | Cum | 9,439.05 | ₹19,32,645.49 |
| 0.0 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
| 0.0 | All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 83.25 | Cum | 9,504.75 | ₹7,91,270.44 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | - | - | - | - |
| 0.9 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 9,990 | Kg | 107.85 | ₹10,77,421.5 |
| 0.0 | Less on 0.027 after Using Correction Factor on DSR 2023 on Account of GST @ 0.973 | 1 | Each | 1,08,551 | ₹1,08,551 |
| 0.0 | Add cost index @ 4.03% | 1 | Each | 1,57,648 | ₹1,57,648 |
| 0.0 | Initial Desilting of PWD's open / covered / pipe / RCC box / brick drains and culverts etc. by deploying labour / supersucker / pumps / jetting machines / any other suitable mechanical means including taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge
The rates includes all above operations including taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. ( The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid separately under agreement item. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.16 MB
NIT.pdf
Tender Documents • 5.14 MB
BOQ_390835.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid