| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹72.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹74.9 L+₹2.9 L (4.05%)Admitted-Fee/PreQual/Technical/Finance DEPUTY PARA KUTCHERY CHOWK RANCHI GPO LALPUR RANCHI | RANCHI | JHARKHAND | 829205 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹81.0 L+₹9.0 L (12.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹90.0 L
EMD Value
₹1.8 L
Closing Date
21 Sept 2026, 12:00 pmClosed
EXECUTIVE ENGINEER RCD ROAD DIVISION SERAIKELLA
OFFICE OF THE EXECUTIVE ENGINEER RCD ROAD DIVISION SERAIKELLA KHARSAWAN JHARKHAND PIN 833219
Ordinary Repair Work of Rangamati-Tikar Road (Total Length 9.05 Km.) under Non Plan Head for the year 2026-27
2026_CECOM_118173_1
RCD/SERAIKELLA/11
Open Tender
Civil Works - Roads
Percentage
90 days
RANGAMATI-TIKAR ROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.8 L
24 Sept 2026
8 Sept 2026
24 Sept 2026
8 Sept 2026
21 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. (JHRCD SOR 2.03 A) | 0.36 | Hect | 88,499.5 | ₹31,859.82 |
| 2 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (JHRCD SOR 4.14 B) | 56.75 | Cum | 2,659.92 | ₹1,50,950.46 |
| 3 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.Prime Coat over WMM/WBM (JHRCD SOR 5.01Ai) | 283.75 | Sqm | 81.35 | ₹23,083.06 |
| 4 | Tack Coat on granullar surfaces.Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (JHRCD SOR 5.02 ii ) | 897.75 | Sqm | 15.98 | ₹14,346.05 |
| 5 | Tack Coat on Bituminous surfaces.Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (JHRCD SOR 5.02 i ) | 18,317.75 | Sqm | 12.9 | ₹2,36,298.98 |
| 6 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 packed Bitumen.Grading-II(JHRCD SOR 5.04A B) | 44.89 | Cum | 10,473.35 | ₹4,70,148.68 |
| 7 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 packed Bitumen.Grading-II(JHRCD SOR 5.05A B) | 549.53 | Cum | 11,942.06 | ₹65,62,520.23 |
| 8 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications.PCC Grade M30.(JHRCD SOR 14.01Cp) | 2.25 | Cum | 6,158.12 | ₹13,855.77 |
| 9 | (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)(JHRCD SOR 8.08) | 185 | Sqm | 70.03 | ₹12,955.55 |
| 10 | Stone masonry work in 1:3 in substructure complete excluding pointing and plastering, as per drawing and Technical Specifications.(JHRCD SOR 13.04) | 3.6 | Cum | 6,875.53 | ₹24,751.91 |
stage.html
html • 0.02 MB
finance_159802.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
f2docuemtns.pdf
Tender Documents • 0.26 MB
BOQ_159802.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .