Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-Finance 1 41 1 1A SREE COLONY KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹10.7 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹11.2 LRejected-Finance VILL P O PUINAN DIST HOOGHLY PIN 712305 | PUINAN | HOOGHLY | WEST BENGAL | 712305 | ₹11.2 L | L2 | Rejected-Finance REJECTED |
| 3 | L3₹11.5 LRejected-Finance VILL SHANKARPARA P O BHABTA P S BELDANGA DIST MURSHIDABAD WB 742134 | BHABTA | MURSHIDABAD | WEST BENGAL | 742134 | ₹11.5 L | L3 | Rejected-Finance REJECTED |
| 4 | L4₹12.0 LRejected-Finance NO 1 DIGHIRPAR NEAR GIRLS SCHOOL CANNING TOWN 24 PARGANAS SOUTH PIN 743329 | 24 PARAGANAS SOUTH | WEST BENGAL | 743329 | ₹12.0 L | L4 | Rejected-Finance REJECTED |
| 5 | L5₹13.1 LRejected-Finance | ₹13.1 L | L5 | Rejected-Finance REJECTED |
Tender Value
₹15.0 L
EMD Value
₹29,985
Closing Date
2 Apr 2026, 3:00 pmClosed
Executive Engineer -I Alipore Division PWD
Executive Engineer_I Alipore Division PWD 2nd and 3rd Floor 32_Belvedere Road Alipore Kolkata_700027
Repair renovation and painting of Proposed Guests or visitors room behind the lift room of ground floor Bhabani Bhawan Alipore Kolkata 700027 during the year 2024 2025
2026_WBPWD_1021689_1
WBPWDEEIALI/NIET69CSD/25-26
Open Tender
CIVIL WORKS
60 days
ALIPORE
Please refer Tender documents.
5 documents required · 5 mandatory
₹29,985
Yes
13 May 2026
12 Mar 2026
4 Apr 2026
13 Mar 2026
2 Apr 2026
13 Mar 2026
Stripping off worn out plaster and raking outjoints of walls, celings etc. upto any height and inany floor including removing rubbish within alead of 75m as directed.
Ordinary Cement concrete (mix 1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes(i) Pakur Variety in gr floor
5th Floor
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (iii) 35 mm. thick In ground floor
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of 5th foor) (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
(e) Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m)
Reinforcement for reinforced concrete work in all sorts ofstructures including distribution bars, stirrups, binders etcinitial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gaugeblack annealed wire at every intersection, complete as perdrawing and direction. JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL in 5th floor
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m
Holding down bolt with nut including 100 x 100 x 6 mm plate washer at bottom fitted complete and packing (i) 16 mm dia bolt (a) 300 mm long
Supplying, fitting & fixing of Aluminium fixed partion wall of all aluminium sections viz top, bottom and side member, intermediate member, glazing clip made of Aluminium Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, annodized conforming to IS:1868- 1983, fitted with all other accessories viz. EPDM gusket,cleat, angle screws etc. including labour charges for fitting and fixing of aluminium fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge. (Excluding cost of glass/ panel board, 10-12 Micron thickness Annodizing film. Natural white. b) For unsupported length of vertical member above 1.50m. height of both ends of vertical member restrained but panel above 0.90 sqm (unit wt of Top, bottom & side member @ 1.978; intermediate member @ 2.055; glazing clip @ 0.167 kg/m respectively) in ground floor.
Providing and fixing exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats and strainless Steel screws forming groves at the periphery of ACP panel. Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP) (b) 4mm thick (0.50mm Al.+3.0mm LDPE +0.50mm Al. PVDF coating in ground floor
Supplying, fitting and fixing boiling water proof ply conforming to IS: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to IS: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in-Charge. [excluding the cost of supporting frame work and teak wood batten/Lipping] in 3rd floor (iv) 12mm
4th floor (iv) 12mm
Supplying fitting, fixing decorative lamination conforming to IS: 2046 : 1995 as per approved make, brand, finish and thickness with fitting, fixing the same on Particle/MDF / Ply Boards with recommended / approved adhesive with proper clipping the sides for better attachment as per direction of Engineer-incharge. The rate includes the cost of labour, adhesive and all incidental charges thereof.In 1st floor Glossy/Matt/Suede excluding surface texture or metallic lustre. (i) Thickness of laminate 1.5mm
4th floor
M.F. suspended ceiling made with 12.5 mm thick Gypsum plaster board including G.I. perimeter channel of 0.55 mm flush (having two flanges 20 mm and 30 mm respectively and web 27 mm ) along with perimeter of ceiling with G.I. intermediate channel of 0.9 mm thick size 45 mmx15mm placed at 750 mm c/c with G.I. ceiling angle of size 25 mmx10mmx0.55 mm thick fixed to the ceiling with G.I. Cleat and steel expansion fastener ceiling section 0.55 mm thick of size 51.50 mmx26mm fixed to the intermediate channels with the help of connecting clip and in the direction of perpendicular to the intermediate channel of 300 mm c/c 12.5 mm thick Gypsum plastered board are to be fixed under ceiling section as above by machine screws. The boards are to be joined and finished with jointing compound, paper tape and application of top coat etc. as per the direction of Engineer-in-charge. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, scaffolding and labour charges etc. complete) lift lobby
Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)
Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (a) One Coat ii) Solvent based interior grade Acrylic Primer
Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) : (Two coats) i) Standard Quality
Supplying and laying true to line and level vitrified tiles of approved brand (size not less than 600 mm X 600 mm X 10 mm thick) in floor, skirting etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry back side of tiles using cement @ 2.91Kg./sqM or using polymerised adhesive (6 mm thick layer applied directly over finished artificial stone floor/Mosaic etc without any backing course) laid after application slurry using 1.75 Kg of cement per sqM below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles / epoxy grout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the manufacturer's specification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contrr]e)I (I) With application slurry @1.75 kg/ Sq.m, 20 mm sand cement mortar (1:4) & 2 mm thick cement slurry at back side of tiles, 0.2 kg/ Sq.m white cement for joint filling with pigment. (A) Deep Colour & White in Gr floor
Applying 2 coats of bonding agent with synthetic multifunctional rubber emulsion having adhesive and water proofingproperties by mixing with water in proportion (1 bonding agent: 4 water : 6 cement) as per Manufacturer's pecification[Cement to be supplied by the Department]
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar A) In Ground floor (c) 15 mm thick plaster Ground floor
1st floor
2nd floor
3rd floor
4th floor
Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white)
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 0.33 MB
BOQ_2511245.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid