| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAdmitted-Finance 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹39.5 L | L1 | Admitted-Finance |
| 2 | L2₹40.5 L+₹1.0 L (2.53%)Admitted-Finance 3 165 1A KAMARAJ NAGAR KANGAYAMPALAYAM SULUR COIMBATORE TAMIL NADU 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | ₹40.5 L+₹1.0 L (2.53%) | L2 | Admitted-Finance |
| 3 | L3₹42.0 L+₹2.5 L (6.25%)Admitted-Finance | ₹42.0 L+₹2.5 L (6.25%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M S ENGINEERS L1 | Vishnu Infrastructures L2 | MJ Infrastructures L3 |
|---|---|---|---|---|---|---|
| 1.00 | Type A - Bituminous Road ( Inclusive of GST 18% ) | 2,050 | M2 | 300 ₹6,15,000 Lowest | 310 ₹6,35,500 | 322.46 ₹6,61,052.22 |
| 1.01Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | ||||||
| 1.02Providing and laying Premix Carpet with Seal Coat Type - A to 20 mm thick using 0.18 cum of 13.20 mm, 0.09 cum of 12.00 mm and 0.09 cum of 6.70 mm with 24.40 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per Morth rev 5. | ||||||
| 2.00 | Type B - Bituminous Road ( Inclusive of GST 18% ) | 1,600 | M2 | 520 ₹8,32,000 Lowest | 570 ₹9,12,000 | 592.45 ₹9,47,920 |
| 2.01Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | ||||||
| 2.02Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which should consist of construction in a single course base/binder course confirming to the specification on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) | ||||||
| 2.03Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00–9.50 mm graded metal and 0.17 cum of 9.50–2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03 Kg of Plastic waste (Total - 50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20–30t C M P with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications. | ||||||
| 3.00 | Type C - Bituminous Road ( Inclusive of GST 18% ) | 1,450 | M2 | 680.3 ₹9,86,435 | 680 ₹9,86,000 Lowest | 705.25 ₹10,22,605.25 |
| 3.01Earth Work Excavation Complete direction as per the dept officers (100mm) | ||||||
| 3.02Conveyance of Excavated earth Complete Direction as per the Dept officers (5 KM) (40% of earth work qty) | ||||||
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
21 Jul 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing BT patches and CC patches for Damaged roads in West Zone 16, 17, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 71, 72, 73, 74 and 75 Ward areas.
2026_MAWS_684849_4
E39/2026-Two cover
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
As per Tender Document
5 documents required · 5 mandatory
₹0
₹50,000
11 Aug 2026
10 Jul 2026
22 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Type A - Bituminous Road ( Inclusive of GST 18% ) | 2,050 | M2 | - | - |
| 1.01 | Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | - | - | - | - |
| 1.02 | Providing and laying Premix Carpet with Seal Coat Type - A to 20 mm thick using 0.18 cum of 13.20 mm, 0.09 cum of 12.00 mm and 0.09 cum of 6.70 mm with 24.40 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/ pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per Morth rev 5. | - | - | - | - |
| 2 | Type B - Bituminous Road ( Inclusive of GST 18% ) | 1,600 | M2 | - | - |
| 2.01 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | - | - | - | - |
| 2.02 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which should consist of construction in a single course base/binder course confirming to the specification on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) | - | - | - | - |
| 2.03 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00–9.50 mm graded metal and 0.17 cum of 9.50–2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03 Kg of Plastic waste (Total - 50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20–30t C M P with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications. | - | - | - | - |
| 3 | Type C - Bituminous Road ( Inclusive of GST 18% ) | 1,450 | M2 | - | - |
| 3.01 | Earth Work Excavation Complete direction as per the dept officers (100mm) | - | - | - | - |
| 3.02 | Conveyance of Excavated earth Complete Direction as per the Dept officers (5 KM) (40% of earth work qty) | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_823341.xls
BOQ • 0.30 MB
Road2Cover.pdf
Tender Documents • 1.17 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .