Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical BHAWANIPATANA KALAHANDI PIN 766001 | KALAHANDI | ODISHA | 766001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹54,620
Closing Date
18 Sept 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, KALAHANDI
Construction of New Subcentre building at Lanjigarh
2026_CERWI_139538_1
SERWBPT/ONLINE-06/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Kalahandi
2 documents required · 2 mandatory
₹10,000
₹54,620
Yes
19 Sept 2026
28 Aug 2026
19 Sept 2026
28 Aug 2026
18 Sept 2026
28 Aug 2026
28 Aug 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P,royalty etc. complete and as directed by the EIC. | 75.99 | cum | 282.9 | ₹21,497.57 |
| 2 | Filling in foundation & plinth with sand in 22.5cm(9") thick layers including watering and ramming with all cost conveyance royalty, taxes of the materials and labour with T&P required for the work etc. complete or as directed by the EIC. | 125.99 | cum | 1,166.5 | ₹1,46,967.34 |
| 3 | Plain Cement concrete (1:3:6) with 4cm size C.B, h.g metal of approved quality and from approved quary including hoisting,lowering, and laying in layers to 10cm(4") thick to required level, ramming,watering including all cost & conveyance of all materials and labour with T&P required for the work with all taxes and royalities complete in all respects and as directed by the EIC. | 27.22 | cum | 6,431.2 | ₹1,75,069.48 |
| 4 | Fly ash brick masonary in cement mortar(1:6) for superstructure after immersing bricks for six hours in water before use work of size (23 x 11 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing et complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the EIC | 21.04 | cum | 5,811.5 | ₹1,22,287.33 |
| 5 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying.
Column footings | 9.33 | cum | 6,871.8 | ₹64,113.89 |
| 6 | plinth beam | 5.74 | cum | 7,746.2 | ₹44,463.19 |
| 7 | Column beam
Ground Floor | 11.65 | cum | 18,694.1 | ₹2,17,786.26 |
| 8 | First Floor | 9.61 | cum | 21,258.3 | ₹2,04,292.26 |
| 9 | 2nd floor | 1.98 | cum | 24,329.1 | ₹48,195.95 |
| 10 | Lintel
Ground Floor | 3.01 | cum | 14,585.6 | ₹43,914.32 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.06 MB
BOQ_607139.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .