Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
12 Jun 2026, 3:00 pm6d left
SC Division-Replacement of earthing arrangements and improvements to PSI Equipment at various SSP/SP/TSS in view of reliability Over SC division
C-E29-TRD-03-2026-27
C-E29-TRD-03-2026-27
Open
180 Days
Unknown (Unspecified Location)
₹0
₹3.9 L
14 May 2026
14 May 2026
29 May 2026
1-SW I: Upgradation of Earth mat at TSS 14633423.80 Below/P
2-SCHEDULE A2: FOUNDATION ITEMS (incl. Supply & Erection) 1326104.00 Below/P
4-SW-II: Buried Rail arrangements at SP/SP/TSS 1564884.00 Below/P
5-SW-III Ballast, Painting , Muffing 1571660.00 Below/P
Item Breakup - 1-SW I: Upgradation of Earth mat at TSS
Square Labour/Erection Foot Total 508400.00 Item- 2 3(a)Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 6930.00 Item- 3 3(b)Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 18320.40 Item- 4 17(a) Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 340060.00 Item- 5 17(c) Supply and Erection of Single Earth Electrode TSS/SP/SSP/AT S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 1596408.00 Item- 6 17(d) Supply and Erection of Copper Strips (25 mm x 3 mm) for Equipment Earthing S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 313200.00 Item- 7 17(e) Supply and Erection of Earth leads 75 mm x 8 mm mild steel laid in the ground. SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 578400.00 Item- 8 17(f) Supply and Erection of Earth leads 75 mm x 8 mm mild steel laid exposed S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 27300.00 Item- 9 17(g) Supply and Erection of Earth leads 50 mm x 6 mm mild steel laid in the ground. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 26000.00 Item- 10 17(h) Supply and Erection of Earth leads 50 mm x 6 mm mild steel laid exposed S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 1992000.00 Item- 11 17(i) Supply and Erection of Mild steel rod 32 mm dia for Earth Mat S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 5850000.00 Item- 12 17(j) Supply and Erection of 8 SWG G.I wire for earthing S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 11600.00 Item- 13 30(a)(i) Supply and Erection of Fencing Panel at SP/SSP/TSS S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 318240.00 Item- 14 30(a)(ii) Supply and Erection of Fencing Upright at SP/SSP/TSS S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 71925.00 Item- 15 30(a)(iii) Supply and Erection of Gates S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 22624.00 Item- 16 30(b)(i) Supply and Erection of Anti-climbing device at TSS/SP/SSP S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 87400.00 Item- 17 30(b)(ii) Supply and Erection of Anti-climbing device for Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 26136.00 Item- 18 34(f)Exacavation of Earth, filling including compaction in all kinds of soil S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 774800.00 Item- 19 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 1838400.00 Item- 20 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 47920.00 Item- 21 41(b) Supply and Erection of Enamel type Public Caution board S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 28140.00 Item- 22 41(c) Supply and Erection of Enamel type Staff Caution board S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 18756.00 41(h) Supply and Erection of Vitreous Enameled 25 kV Danger Board with skull & bones for Overline Item- 23 Structure (OLS) and Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 12744.00 Item- 24 41(i) Supply and Erection of Enamel Protected Area Board S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 26464.00 Item- 25 41(k) Supply and Erection of Vitreous Enameled TSS/SP/SSP Name Board S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 34602.00 Item- 26 41(l) Supply and Erection of set of Isolator operation OPEN/CLOSE boards S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Labour/Erection Total 6876.00 Item- 27 42 Supply and Erection of Shock Treatment Chart S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase
Labour/Erection Total 24528.00 Item- 28 32/3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 6930.00 Item- 29 32/3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 18320.40
Item Breakup - 2-SCHEDULE A2: FOUNDATION ITEMS (incl. Supply & Erection)
Supply and Erection Total 147680.00 Item- 31 2(c)(i)Reinforced Concrete for foundation, plinth and trench S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 407160.00 Item- 32 2(c)(ii)Reinforced Concrete for Cable Trench covers S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 347160.00 Item- 33 2(d)(i)Reinforcement of Brick Work S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 380160.00 Item- 34 2(d)(ii)Plastering of Brick Work S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 8520.00 Item- 35 2(i)Breaking of foundation up to 200 mm below track formation and drain / PF surface etc S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 35424.00
Item Breakup - 3-SCHEDULE B1: STEEL SUPPLY
Supply / Purchase Total 264348.00 3(cs)Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 37 Portals. SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 176707.20
Item Breakup - 4-SW-II: Buried Rail arrangements at SP/SP/TSS
Labour/Erection Total 19200.00 Item- 39 16(aa)Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 27392.00 17(z)(i)Transportation & Erection of 13 m long 52/60 KG Released Rail from nominated place to Item- 40 work site S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 167968.00 Item- 41 17(z)(ii)Supply & Erection of Galvanised Iron Flat 75 x 8 mm S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 609280.00 17(z)(iii)Supply & Erection of High Productivity Fasteners (Rail Contact System) for fixing of Traction Item- 42 Bonds at Buried Rail Earthing Station. One Set comprises of M-12/20 Stainless Steel Nuts, Bolts & Washers etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 174208.00 Item- 43 17(z)(iv)Excavation & Refilling of Soil for Buried Rail S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 453168.00 18(z)(i)Supply of Paint and Stenciling/Painting of mast location, RL, MRL, EC socket symbols and Item- 44 implantations on OHE masts/portals S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 34080.00 18(z)(ii)Supply of Paint and Painting of ATD Counter Weight including Temperature Marking of 'Y' Item- 45 value for 15°C, 35°C & 45°C S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 3248.00 Item- 46 18(z)(iii)Supply of Paint and Painting of any type of Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 13440.00 Item- 47 18(z)(iv)White Washing for copping of mast/portal foundations S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 15000.00 Item- 48 18(z)(v)Supply of Paint and Painting of Fencing Panels S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 18900.00 Item- 49 18(z)(vi)Supply of Paint and Painting of PSI Equipments S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 18800.00 19(z)Trimming/Cutting of Tree Branches including disposal of branches/Bushes outside yard (Note: Item- 50 Girth of more than 20 cm will only be considered as tree branch) S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 10200.00
Item Breakup - 5-SW-III Ballast, Painting , Muffing
Labour/Erection Total 189000.00 Item- 52 Cleaning the vegetation and ramming of ground. S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 40500.00 Item- 53 Spreading of 20/25 mm ballast/Gravel upto a depth of 10 cm in the switchyard S No. Item Description of Item Unit Qty Rate Amount No
Labour/Erection Total 189000.00 Muffing for all types of OHE Structures incl Masts, Portals, Anchor Blocks with Concrete grade of M- Item- 54 15 using graded coarse aggregate of 20mm. Normal size of raising muff to OHE structures. S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 140000.00 Supply of 250LPH Portable Transformer oil Filteration Plant as per the enclosed specification Item- 55 ATTACHED SEPARATE SHEET S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 200600.00 Supply of SILICA GEL BREATHER OF POLY CARBONATE CLEAR TYPE (500GM) FOR 10 kVA, 25 kA Item- 56 AUXILIARY TRANSFORMER. AS PER RDSO SPEC. ETI/PSI/15 (08/2003).MAKE: RDSO APPROVED MANUFACTURER OF 10kVA, 25kVA AT. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 438960.00 Supply of 01 Amp. Nichrome fuse element for 25 KV DO fuse switch assembly As per DRG No. Item- 57 ETI/PSI/032 and RDSO S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 232000.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Supply of Oil testing kit (BDV machine) 0-100KV motorized with manual option as per attached Item- 58 specification. Make: Metravi, Meco, Rishabh or similar. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Purchase Total 141600.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Technicalspecificationandstandarddrawings.pdf Technical spec and Drawings
ATTACHMENT
SpecialconditionsofContract.pdf
ATTACHMENT
FinalExplanatorynotes.pdf
ATTACHMENT
MasterTenderDocument.pdf
ATTACHMENT
StandardGeneralConditionsofcontract2.pdf
ATTACHMENT
Mergedcorrectionslips1-11.pdf
ATTACHMENT
Instructionstothetenderer03202627.pdf
ATTACHMENT
IRSGCCApril2022.pdf
ATTACHMENT
Technicalspecificationandstandarddrawings.pdf
ATTACHMENT
Download all tender documents and submit your bid