Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
9 Oct 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Satish Kumar Singh
Power Grid Corporation of India Limited,
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1
NR3/NT/W-AIS/DOM/K00/23/08177 RFx: 5002002924
Open
Civil - All
Works
Orai
Yes
₹12,500
₹5.8 L
11 Sept 2023
11 Sept 2023
8 Oct 2023
11 Sept 2023
8 Oct 2023
11 Sept 2023
Attachment-3 (QR)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1
Specification No.: NR3/NT/W-AIS/DOM/K00/23/08177 RFx: 5002002924
(Qualifying Requirement Data)
Bidders’s Name & Address: Contract Services
Name: Power Grid Corporation of India Ltd.,
Address: "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & Additional Information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details along with other information, as follows herewith our stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail).
* We have submitted bid as individual firm.
* We have submitted bid as joint venture of following firms :
(* Strike-off whichever is not applicable)
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Bidder/Lead Partner In case of Joint Venture
For Other Partner(s) For Other Partner(s)
1 Name of the Firm
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
1.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
TECHNICAL EXPERIENCE
1.1 Route-1: 1.1 The Bidder must have designed, manufactured, type tested (as per IEC or equivalent standard), supplied and supervised erection & commissioning of at least two (2) nos. Gas Insulated Switchgear (GIS) circuit breaker bays@ of 110KV or above voltage class in one (1) Substation or Switchyard during the last seven (7) years and these bays must be in satisfactory operation# for at least two (2) years as on the originally scheduled date of bid opening i.e.29.07.2022.
2.1.1 In case the Bidder is a Foreign Entity, following requirements shall be complied:
i (i) If the bidder is submitting its bid as an Individual Firm or in a Joint Venture without any Indian Entity as a Partner, the bidder must, in its bid, propose an Indian Associate for executing the On-Shore Supply and On-Shore Services Contract, as per the provisions of bidding documents. The proposed Indian Associate must have erected, tested and commissioned at least two (2) nos. GIS/AIS Circuit Breaker equipped bays of 110KV or above voltage level in one (1) substation or switchyard during the last seven (7) years and these bays must be in satisfactory operation# as on the originally scheduled date of bid opening mentioned above For executing on-shore supply contract, the bidder in its bid, may alternatively propose its Indian Subsidiary or Group or Joint Venture Company as Indian Associate provided that the proposed Indian Associate has been registered in India (as per Companies Act 1956 or 2013 of India) for establishing manufacturing and testing facilities for 765kV GIS or above voltage level as on the date of bid opening mentioned above.
ii A) The Subsidiary or Group Company or a Joint Venture Company (JVC) of the bidder shall have manufacturing & testing facilities for 110kV or above voltage level GIS in India as on the originally scheduled date of bid opening mentioned above. OR The bidder must have incorporated a Subsidiary or Group Company or a Joint Venture Company (JVC) as per Companies Act 1956 or 2013 of India, to manufacture 765kV or above voltage level GIS in India and it must have commenced the construction activities for establishment of 765kV or above voltage level GIS manufacturing and testing facilities in India as on the originally scheduled date of bid opening mentioned above. B) The bidder must supply at least one (1) no. 765kV GIS Circuit breaker bay* manufactured in the said facilities in India, for which Bidder shall furnish an undertaking (as per enclosed format in Volume-III of Bidding Document) along with the bid. C) Bidder can offer to supply more than one 765kV GIS circuit breaker bay* from Indian works of its Subsidiary or Group Company or a Joint Venture Company (JVC) provided the Subsidiary/JVC/Group Company must have manufactured at least one (1) number 765kV or above voltage level GIS Circuit Breaker bay* and this bay should have been either supplied or type tested (as per IEC or equivalent standard) as on the originally scheduled date of bid opening mentioned above.
1.2 Route-2: The Bidder, who has established manufacturing & testing facility in India for 110kV or above voltage level GIS but not meeting the requirement stipulated in Para 1.1 above, shall also be considered provided that- a)The Bidder must have manufactured, at least one (1) no. 110kV or above voltage class GIS circuit breaker bays@ based on technological support of the collaborator(s), provided that the collaborator(s) meets the requirement stipulated in para 1.1 above. Further bidder must have either supplied or type tested above CB bay (as per IEC or equivalent standard) as on the originally scheduled date of bid opening mentioned above. b) Further, the bidder shall also submit the following along with the bid: i. A legally enforceable undertaking (jointly with the Collaborator(s) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s). ii. A confirmation letter from the Collaborator(s) stating that the Collaborator(s) shall furnish performance guarantee for an amount of 3 % of the ex-works cost of such equipment(s). This performance guarantee shall be in addition to Contract Performance Guarantee to be submitted by the bidder. iii. A valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110kV or above voltage level GIS equipment in India.
1.3 Route-3: 1.3 The Bidder, who has established manufacturing & testing facility in India for 110kV or above voltage level GIS as Subsidiary/JVC/Group company by its parent/principal but not meeting the requirement stipulated in para 1.1 above, shall also be considered provided that- a) The Bidder must have manufactured, at least one (1) no. 110kV or above voltage class GIS circuit breaker bays@ based on technological support of the parent/principal, provided that the parent/principal meets the requirement stipulated in para 1.1 above. Further bidder must have either supplied or type tested above CB bay (as per IEC or equivalent standard) as on the originally scheduled date of bid opening mentioned above. b) Further, the bidder shall also submit the following along with the bid: i. A legally enforceable undertaking (jointly with the parent/principal company) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s). ii. A confirmation letter from the parent/principal company stating that the parent/principal company shall furnish performance guarantee for an amount of 3 % of the ex-works cost of such equipment(s). This performance guarantee shall be in addition to Contract Performance Guarantee to be submitted by the bidder. iii. A valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110kV or above voltage level GIS equipment in India.
1.4 Route-4 1.4 In case, the bidder is not a GIS manufacturer, he shall also be considered provided: i. The bidder must have erected and commissioned at least two (02) nos. GIS circuit breaker bays of 110kV or above voltage class in one (01) new GIS substation or switchyard during last seven (07) years and these bays must be in satisfactory operation# for at least two (02) years as on the originally scheduled date of bid opening mentioned above. ii. The GIS must be offered from Indian manufacturer, who meets the requirement mentioned at Route-1 or Route-2 or Route-3 above. iii. A legally enforceable undertaking (jointly with the GIS Manufacturer) (as per enclosed format in Section-VI, Vol-I of bidding document) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s) is submitted along with the bid stating that GIS Manufacturer shall furnish performance guarantee for an amount of two (2) % of the total contract price. This performance guarantee shall be in addition to the Contract Performance security to be submitted by the Bidder.
Note :- 1. (#)Satisfactory operation means certificate issued by the Employer certifying the operation without any adverse remark. 2. (*) For the purpose of qualifying requirement, one no. of circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs / Bushing CTs. 3. In case bidder is a holding company, the technical experience referred to in Route-1, 2, 3 & 4 above as the case may be shall be of that holding company only (i.e. excluding its subsidiary/group companies). In case bidder is a subsidiary of a holding company, the technical experience referred to in Route-1, 2, 3 & 4 above as the case may be shall be of that subsidiary company only (i.e. excluding its holding company). 4. In case bidder is qualifying through Route-1, type test reports of Collaborator/ Parent Company/Subsidiary Company/ Group Company shall also be acceptable, for which a confirmation shall be furnished along with the bid as per format attached in the bidding documents.
Using the following format, each Bidder (individual firms or partners of a joint venture) is requested to list the experience as detailed above, on the basis of which the Bidder wishes to qualify. The information is to be summarised using following format for each experience of the Bidder or of each Partner of a Joint Venture.
(The bidder shall attach documentary evidence, such as copies of utility certificates for completed contracts and copies of award letters etc. for ongoing contracts in support of his experience as listed in the following proforma for each Contract with the help of "Attach" Buttons provided in table given below).
Format for the Bidder/Collaborator/ Parent/Principal/Partner of JV in case of Joint Venture/Indian GIS Mnaufacturer in support of meeting the requirement of para 1.1, Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of Bidder/Collaborator/ Parent/Principal/Partner of a JV/Indian GIS Manufacturer #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
4(a)(i) Voltage Level of GIS Substation commissioned under the Contract
No. of GIS Circuit Breaker equipped bays under the above contract
Name of the substation or switchyard
(a)(ii) No. of years, the above Substation have been in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
NOTE: type test reports of Collaborator/ Parent Company/ Subsidiary Company/ Group Company shall also be acceptable, for which a confirmation shall be furnished along with the bid as per format attached in the bidding documents (Attachment-25 in Volume-III)
of Gas Insulated Switchgear (GIS) circuit breaker bays. of Gas Insulated Switchgear (GIS) circuit breaker bays.
In case of foreign entity, whether bidder have established/ commence the establishment of facility as Indian Subsidiary/ Group Company/ Joint Venture Company for manufacturing & testing of 765kV or above voltage level GIS in India (as per Companies Act 1956 or 2013 of India)
Whether bidder want to propose its above subsidiary/ Group Company/ Joint Venture Company as its associate for executing On-Shore Supply Contract
Foreign Bidder can offer to supply more than one 110kV GIS circuit breaker bay* from India provided his Subsidiary or Group Company or a Joint Venture Company (JVC) must have manufactured at least one (1) number 765kV or above voltage level GIS Circuit Breaker bay* and this bay either should have been supplied or should have been type tested ( as per IEC or equivalent standard) as on the originally scheduled date of bid opening as mentioned above
Whether Undertaking (as per enclosed format in Section-VI, Sample Forms and Procedures of bidding document) for above is enclosed with the bid
Details of documents uploaded in support of the above stated experience
Format for the Indian Associate executing the On-Shore Supply and On-Shore Services Contract for a Foreign Entity submitting its bid as an Individual Firm or in a Joint Venture without any Indian Entity as a Partner, in support of meeting the requirement of para 1.1.1(i) of Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Indian Associate executing the On-Shore Supply and On-Shore Services Contract
1 Name of Contract Undertaken
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the Bidder
4 No. of GIS/AIS Circuit Breaker equipped bays under the contract
(Indicate nos. of Circuit Breaker equipped bays of 220 kV or above voltage level where one no. of circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs / Bushing CTs)
Name of the substation or switchyard
No. of years, the above CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
Details of documents uploaded in support of the above stated experience
Format-B (Route-2):
Format in support of meeting the requirement of para 1.2 Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
1 Name of the Collaborator
2 Whether bidder have established manufacturing and testing facilities in India for 110KV or above voltage level Gas Insulated Switchgear (GIS)
3 Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bay manufactured by bidder based on technological support of the collaborator have been supplied or Type tested
A if Type tested details of Type test Report
B Details of GIS supplied by them
i Name of Contract Undertaken for manufacturing 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bays
ii Contract Reference No. & Date of Award
iii Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
iv No. of 110KV Gas Insulated Switchgear (GIS) Circuit Breaker bays manufactured under the contract (Indicate nos. of Gas Insulated Switchgear (GIS) Circuit Breaker equipped bays of 110KV or above voltage level, where circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs/Bushing CTs. GIS means SF6 Gas insulated Switchgear.)
Name of the substation or switchyard
Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit breaker bays, as mentioned above, has been manufactured based on technological support of the Collaborator under the Contract.
Scope of work involved under the Contract
Details of documents uploaded in support of the above stated experience
Format in support of meeting the requirement of para 1.2 (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Collaborator (refer para 1.2), if applicable : #REF!
Name of the 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufacturer (refer para 1.2), if applicable : #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
4(a)(i) No. of Circuit Breaker bays under the contract
(Indicate nos. of Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Circuit Breaker bays of 110KV or above)
Name of the substation or switchyard
(a)(ii) No. of years, the above Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract as per IEC
(Tick whichever is/are applicable)
Whether Collaborator(s) meets the technical experience criteria stipulated at 1.1 above, and the details of which is mentioned at Format-A above. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Whether legally enforceable undertaking jointly by Bidder/Manufacturer and the Collaborator(s) (as per enclosed format in Section-VI: Sample Forms and Procedures of bidding document) is furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Confirmation letter from the Collaborator(s) along with the bid stating that Collaborator(s) shall furnish performance guarantee, in addition to contract performance guarantee to be submitted by the bidder, for an amount of 3% of the cost of equipment(s) to be manufactured and supplied from the works in India. (Applicable for the Bidder/Manufacturer wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Whether valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110KV or above voltage level GIS equipment in India furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Details of documents uploaded in support of the above stated experience
Format-C: (Route-3)
Format in support of meeting the requirement of para 1.3 Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
1 Name of the Bidder established as Subsidiary/JVC/Group company by its parent/principal Company
2 Name of the parent/principal Company
3 Whether bidder have established manufacturing and testing facilities in India for 110KV or above voltage level Gas Insulated Switchgear (GIS)
4 Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bay manufactured by bidder have been supplied or Type tested based on Technological support of their Parent/ Principal Company
A if Type tested details of Type test Report
B Details of Gas Insulated Switchgear (GIS) Circuit Breaker Bays supplied by them
i Name of Contract Undertaken for manufacturing 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bays
ii Contract Reference No. & Date of Award
iii Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
iv No. of 110KV Gas Insulated Switchgear (GIS) Circuit Breaker bays manufactured under the contract
Name of the substation or switchyard
Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit breaker bays, as mentioned above, has been manufactured based on technological support of the Parent/Principal Company under the Contract.
Scope of work involved under the Contract
Details of documents uploaded in support of the above stated experience
Format in support of meeting the requirement of para 1.2 (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Collaborator (refer para 1.2), if applicable : #REF!
Name of the 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufacturer (refer para 1.2), if applicable : #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
4(a)(i) No. of Circuit Breaker bays under the contract
(Indicate nos. of Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Circuit Breaker bays of 110KV or above)
Name of the substation or switchyard
(a)(ii) No. of years, the above Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract as per IEC
(Tick whichever is/are applicable)
Whether Parent/Principal Company meets the technical experience criteria stipulated at 1.1 above, and the details of which is mentioned at Format-A above. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Whether legally enforceable undertaking jointly by Bidder/Manufacturer and the Parent/Principal Company (as per enclosed format in Section-VI: Sample Forms and Procedures of bidding document) is furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Confirmation letter from the parent/principal company along with the bid stating that parent/principal company shall furnish performance guarantee, in addition to contract performance guarantee to be submitted by the bidder, for an amount of 3% of the cost of equipment(s) to be manufactured and supplied from the works in India. (Applicable for the Bidder/Manufacturer wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Whether valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110KV or above voltage level GIS equipment in India furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Name of the substation or switchyard
Whether 110KV or above voltage level Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Circuit breaker bays, as mentioned above, has been manufactured based on technological support of the Parent/ Principal Company under the Contract.
If Yes, indicate the Name of Parent/ Principal Company(s)
No. of years, the above AIS/GIS Subatation(s) are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract for the above 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS bay as per IEC as on the originally scheduled date of bid opening
(Tick whichever is/are applicable)
Details of documents uploaded in support of the above stated experience
Format in support of meeting the requirement of para 1.3 (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Parent Company/ Principal (refer para 1.3), if applicable: #REF!
Name of the 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufacturer (refer para 1.3), if applicable : 0 #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
4(a)(i) No. of Circuit Breaker bays under the contract
(Indicate nos. of Circuit Breaker bays of 110KV or above)
Name of the substation or switchyard
(a)(ii) No. of years, the above Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract as per IEC
(Tick whichever is/are applicable)
Whether Joint Deed of Undertaking executed between The Bidder and 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufaturer has been enclosed with bid ? (in line with para 1.3 (b)(i) of Annexure-A (BDS)
Whether confirmation letter from the parent/principal company stating that the parent/principal company shall furnish performance guarantee for an amount of 10% of the ex-works cost of such equipment(s) has been enclosed with bid? (in line with para 1.3(b)(ii) of Annexure-A (BDS)
Whether valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS equipment in India has been enclosed with bid ? (in line with para 1.3(b)(iii) of Annexure-A (BDS)
Details of documents uploaded in support of the above stated experience
Format-D: (Route-4)
Format in support of meeting the requirement of para 1.4(Route-4) (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Bidder’s Name :
1 Name of Contract Undertaken
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm
4(a)(i) Voltage Level of GIS Substation commissioned under the Contract (Indicate 110KV or above class only)
No. of GIS Circuit Breaker equipped bays under the above contract (Indicate nos. of Gas Insulated Switchgear (GIS) Circuit Breaker equipped bays of 110KV or above voltage level, where circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs/Bushing CTs. GIS means SF6 Gas insulated Switchgear.)
Name of the New substation or switchyard
Scope of work involved under the Contract (Tick whichever is/are applicable)
No. of years, the above GIS Circuit Breaker equipped bays have been in operation as on the originally scheduled date of bid opening.
Details of documents uploaded in support of the above stated experience
Name of the Proposed Indian GIS Manufacturer (as per the Route-4 of Annexure-A(BDS)
Whether above Indian GIS Manufacturer meets the requirement mentioned at Route-1 or Route-2 or Route-3 above. (If Yes, Please mentioned the details in the Format-A/Format-B/Format-C above)
Whether Undertaking (Jointly with the GIS Manufacturer) (as per enclosed format in Section-VI, Vol-I of bidding document) for above is enclosed with the bid
Details of documents uploaded in support of the above stated experience
2.0 FINANCIAL REQUIREMENTS :
Financial Position {Reference para 2.0 of Annexure-A (BDS)} For the purpose of this particular bid, bidders shall meet the following minimum criteria:
a) Net Worth for last 3 financial years should be positive
b) Minimum Average Annual Turnover^(MAAT) of the bidder for best three years i.e. 36 months out of last five financial years of the bidder should be Rs. 954.78 Lakh.
^Note- “Annual gross revenue from operations/gross operating income as incorporated in the profit & loss account excluding other operative income / other income”.
For Bidders to qualify for more than one package, their financial position shall not be less than the sum of the requirement for the packages they propose to qualify for ( strike through if only one package)
c) Bidder shall have Liquid Assets (LA) and/or evidence of access to or availability of credit facilities of not less than Rs. 159.13 Lakh.
Note: (i) In case bidder is a holding company, the Financial Position criteria referred to in para 2.0 above shall be that of holding company only (i.e. excluding its subsidiary / group companies). In case bidder is a subsidiary of a holding company, the Financial Position criteria referred to in para 2.0 above shall be that of subsidiary company only (i.e. excluding its holding company). (ii) In case bidder has established manufacturing facility in India and yet to complete three (3) financial years, the Net Worth and average of the turnover as per financial statement for completed financial years shall be considered for the purpose of compliance to the specified Net Worth and MAAT requirements. (iii) In case of bidder qualifying through Route-3 but not meeting the Financial Position requirement as per note (i) read along with note (ii) above, the following shall be applicable: In case bidder is yet to complete five (5) years from the date of commercial production of such equipment(s) as on the originally scheduled date of bid opening as above, the financial position requirement as per para 2.0 (b) & (c) of parent/principal company providing collaboration for technological support shall be considered. However, once he completes five (5) years from the date of commercial production of such equipment (s) in India as on the originally scheduled date of bid opening as above, the financial position requirements as specified at 2.0 (b) and (c) above shall also be required to be met by such bidder on their own as per note (i) above and not based on their parent/principal company. Further, in case the bidder is yet to complete one (1) financial year, the Net worth requirement as per para 2.0 (a) above of parent/principal shall be considered. (iv) Relaxation for Start-Ups^/ MSEs Start-Ups^/ MSEs, meeting the specified requirements at Para 2.0 (a) above in Financial Position shall also be considered qualified if they meet Eighty (80) % of the requirement specified at Para 2.0 (b) & 2.0 (c) above in Financial Position. (v) ^ Start-Ups as defined by DIPP, applicable as on the originally scheduled date of bid opening.
{In support of its ‘Financial Position’, in line with the above, the Bidder (in case of bidding by single firm ) or each of the Partners of a Joint Venture (in case of bidding by a Joint Venture) or Company/Constituents must provide the relevant information in support of the same, along with documentary evidence, in the following format}
2.1 Financial Qualification Data: 2 or more
Name of the Bidder
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2020-21 No
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Lakh)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Name of Other Partner-1 of JV
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
C Liquid Assets
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Name of Other Partner-2 of JV
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Lakh)
Sl No Financial year
Do you have audited results for FY 2020-21
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Lakh)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
3.0 Joint Venture (JV) Firms {Reference para 3.0 of Annexure-A (BDS)}
a) In case a bid is submitted by a Joint Venture (JV) of two or more firms as partners, all the partners of Joint Venture shall meet collectively the complete requirements stipulated at para 1.0 and 2.0 (b) & (c) above. Further, the partner(s) of JV must also meet the following minimum criteria: i. All the partners of the JV shall meet individually the Financial Position criteria given at 2.0 (a) above. ii. The Lead Partner shall meet, not less than 40% of the minimum Financial Position criteria given at para 2.0 (b) & (c) iii. Each of the other partner(s) individually shall meet not less than 25% of the minimum Financial Position criteria given at para 2.0 (b) & (c) above The figure of average annual turnover and liquid assets/credit facilities for each of the partners of the JV shall be added together to determine the JV’s compliance with the minimum qualifying criteria set out in Para 2.0 (b) & (c) above.
b) However, for a JV to be qualified, the partners of JV must also meet the following minimum criteria: i. One of the partner(s) of JV must meet the Technical Experience criteria and the requirements stipulated under Route-1 or Route-2 or Route-3 as per para 1.0 above ii. The remaining partner(s) of JV must have erected, tested and commissioned at least two (2) nos. GIS/AIS Circuit Breaker equipped bays@ of 110KV or above voltage level in one (1) substation or switchyard during the last seven (7) years in India and these bays@ must be in satisfactory operation# as on the originally scheduled date of bid opening mentioned above. Note : (#) Satisfactory operation means certificate issued by the Employer certifying the operation without any adverse remark.
In case of Joint venture, the following conditions shall also apply:
(a) the bid, and in case of successful bid, the specified Form of Agreement shall be signed so as to be legally binding on all partners (as per enclosed format in Section-VI, Vol.-I of bidding document).
(b) one of the partners shall be nominated as Lead Partner, and the Lead Partner shall be authorized to incur liabilities and receive instructions for and on behalf of any and all partners of the Joint Venture, and the entire execution of the Contract shall be done with the Lead Partner and payment under the contract shall be received by the Lead Partner on behalf of the Joint Venture as per power conferred to him in the Power of Attorney. The authorization shall be evidenced by submitting a Power of Attorney signed by legally authorized signatory of all the partners as per Performa in in Section-VI, Vol.-I of bidding documents. The payment under the Contract can also be received by other partner(s) based on authorization of Lead Partner.
(c) All partners of the joint venture shall be liable jointly and severally for the execution of the Contract in accordance with the Contract terms and a statement to this effect shall be included in the authorisation mentioned under (b) above as well as in the Bid Form and in the Contract Form (in case of a successful bid);
(d) Agreement entered into by the Joint Venture partners shall be submitted with the bid.
4 The bidder shall furnish documentary evidence in support of the qualifying requirement stipulated as above
4.1 In accordance with the above, in case of JV bidders, it should be ensured that necessary details including those pertaining to each JV partner are furnished and the documents are submitted alongwith the bid. Further, the JV bidders should also ensure that other requirements are complied with. The lists of documents furnished are to be indicated below :
A For Name of the Bidder
B For Name of Other Partner-1 of JV
C For Name of Other Partner-2 of JV
Audited balance sheet and income statements for the last five years as per the following:
For Name of Other Partner-1 of JV For Name of Other Partner-2 of JV
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed
1st Year Yes Yes
2nd Year Yes Yes
3rd Year Yes Yes
4th Year Yes Yes
5th Year Yes Yes
Date : Printed Name :
Place : Designation :
Name of Package : Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Package No : RFx: 5002002307
Specification No. : NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924
Completion Period 9 Months
: Attachments : General guidelines for filling up the Attachments : TW01RFx: 5002002307 :
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Specification No.: NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR), Attach QR, 4, 4(A), 4(B), 5, 6, 7, 9, 10, 11, 12, 13, 15, 16, 17 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as perproforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] No 0
Specify type of Bidder [Select from drop down menu] 1
Name of Lead Partner
Address of Lead Partner
Other Partner …… ……. …….. …… ……. ……..
Address of other Partner …… ……. …….. …… ……. ……..
Name of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-3(JV) 0 RFx: 5002002307
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services & …… ……. …….. …… ……. ……..
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 9
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-3(QR)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Qualifying Requirement Data)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
For our Qualifying Requirements Data, please refer Schedule-QR of this volume.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-4
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-4(A)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-4(B)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-5
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 ATTACHMENT-5A
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. 2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-6
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-7
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Details of Alternative Bid)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-9
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Work Completion Schedule)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1. for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in weeks from the effective date of contract
1 Finalization of L2 Network
2 Site Mobilization
3 Source approval, store constrction, statuary complianc such as Labour license, WCP, EAR policy etc.
4 Approval of Vendors
5 Engineering Activities
6 Supply of Items at site (Including vendor finalization, Inspection, testing, delivery at site)
7 Erection activities including civil works
8 Commissioning
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-10
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Guarantee Declaration)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that the equipments offered shall have minimum (or a muximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-11
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-11
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Other Partner Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-11
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-12
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Price Adjustment Data)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the subject package. The necessary documentary evidence is enclosed.
Sl. No. Name of Materials/Labour Value of co-efficient Name of the published index Value of index as on thirty (30) days prior to date of opening in line with Appendix-2, Section-VI, Volume-I
A) For Ex-Works Price Component of AIS Equipment
I Capacitive VoltageTransformer
a) Raw Material
b) Labour l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
a) Raw Material
b) Labour I= l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
III Surge Arrester
a) Raw Material
b) Labour I= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
III PVC/XLPE Insulated Power and Control Cable
a) a=PVC Compound 0.15
b) Published Price of Metal IEEMA
i) Aluminium per MT IEEMA
ii) Copper per MT IEEMA
c) Weight in MT of Metal per kM (Size wise)
IV Sub Station Structures (including Bolts & Nuts)
i) Lattice Steel Structures & Pipe Structures (including bolts & nuts, washers & foundation bolts)
a) Raw Materials
i) a=Structural steel a= 0.58 JPC Market Price (Retail) for average Price of Steel Angles of size 50 x 50 x 6 mm of all cities in Rs./MT as published by Joint Plant Committee(JPC).
ii) b=Electrolytic Zinc b= 0.16 IEEMA
b) Labour l= 0.11 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
VIII. Series Reactor [ 420 kV, 12 ohm, 2500A, 1-ph air core dry type Series Reactor]
a) Raw Material Copper(a)
i) Aluminium(a) Aluminium(a)
b) Labour I= 0.85 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The value of coefficient for raw materials: a=0.65 to 0.73 and value of coefficient for labour shall be between 0.12 and 0.20, so that sum of all the coefficients including labour shall be a+l=0.85
B. For Installation (including Civil Works) Price Component
I Installation price component (including Civil works but excluding ‘supply & placement of reinforcement steel’ and ‘concreting’)
i) Labour I= l= 0.80 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
II Supply & Placement of Reinforcement Steel
i) HSD a= 0.10 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= l= 0.05 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
iii) Manufacture of Basic Metals b= 0.65 Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
III For Concereting
i) HSD a= 0.20 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= l= 0.10 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
iii) Manufacture of cement, lime and plaster b= 0.30 Wholesale Price Index Number for `Manufacture of cement, lime and plaster’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in)
iv) Cutting, shaping and finishing of stone c= 0.20 Wholesale Price Index Number for `Cutting, shaping and finishing of stone’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-13
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-14
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Integrity Pact is annexed herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-15
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) No 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No) No
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-16
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Additional Information)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of Bidder (Lead Partner)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 OTHER INFORMATION
3.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
3.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-17
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-17
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-17
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-18
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-18
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-19
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5*. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
S N FY Value of Total Sales (including Taxes and Duties)(T)
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
S N Value of Balance Works (B1) against the Contracts awarded by Employer Value of Balance Works (B2) against the Contracts awarded by Utilities other than Employer Total value of Balance Works (B){B=B1+B2}
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is 15th June 2016, the Balance bid capacity as on 01st April 2016 is to be declared)] *(Applicable only in case of package for which the stipulated Qualification Requirements in respect of Technical experience pertains primarily to erection, testing and commissioning/civil works viz. transmission Line tower packages/Substation package/civil works package etc.)
6***. Our/Our proposed manufacturer’s annual manufacturing capacity as certified by a Chartered Engineer or similar Professional/ Professional body/Govt Agencies is:
MT/annum (for tower/tower parts)
[Certificate from Chartered Engineer or similar Professional/ Professional body/Govt Agencies in the country of the bidder/proposed manufacturer is to be enclosed along with this Attachment. Annual manufacturing capacity of all the manufacturers to be furnished separately] ***(Applicable only in case of Tower packages with scope for tower supply)
7. Notwithstanding above, we also understand that the Bid Capacity/Manufacturing Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Date : Printed Name :
Place : Designation :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Before filling up the Bid Form, the Bidder is required to fill up the details as under :
1 Tick whichever is applicable:
Indicate the name of Associate here, if applicable. 1 USD
1 Enter Details of Amendments: INR
Amendments to Bidding Documents issued:
2 Bid Security Bank Guarantee
3 Currency INR Amount
4 Validity in months
NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Bid Form 1 st 1 January 1 one
2 nd 2 February 2 two
BID FORM 3 rd 3 March 3 three
4 th 4 April 4 four
Bid Proposal Ref. No. 5 th 5 May 5 five
Date : 0-Jan-00 7 th 0 6 June 7 seven
8 th 1 7 July 8 eight
To: 9 th January 8 August 9 nine
Contracts & Materials Deptt 10 th 1900 9 September 10 ten
Power Grid Corporation of India Ltd., 11 th 10 October 11 eleven
3rd Floor 12 th 11 November 12 twelve
12 Rana Pratap Marg 13 th 12 December 13 thirteen
Lucknow-226001 (UP) 14 th Zero 14 fourteen
15 th () 15 fifteen
Name of Contract : Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1. the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently).0 16 th 16 sixteen
Dear Ladies and/or Gentlemen, 17 th 17 seventeen
Having examined the Bidding Documents, including Amendment Nos. dated 00/01/1900, the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 0 18 th 18 eighteen
We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2.
Our Bid, as said above have been submitted as per the followings: 19 th 19 nineteen
A Attachments to the Bid Form (First Envelope) 20 th 20 twenty
1.1 In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments to the Bid Form : 21 st
(a) Attachment 1: Bid Security,in separate envelope, in the form of Bank Draft/Pay Order/Bank's certified cheque/ Bank Guarantee, OR, Online Payment Acknowledgment towards Bid Security OR, documentary evidence in support of exemption of Bid Security in accordance with clause 13.1 of ITB, Section-II, Vol-I of Bidding Document Bank Draft 22 th
(b) Attachment 2: A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Pay Order 23 th
(c) Attachment 3: The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3(c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents [Attachment – 3(QR)]. Banks certified Cheque 24 th
(d) Attachment 4: The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facility offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4 . Moreover, a list of Special Tools & Tackles to be furnished by us, the cost of which is included in our Bid Price, is also enclosed as per your format as Attachment- 4A. 25 th
(e) Attachment 5: The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 6: The variation and deviations from the requirements of the Conditions of Contract, Bid Data Sheet and other commercial conditions, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter-alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(g) Attachment 7: The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. [NOT APPLICABLE] 28 th
(h) Attachment 8: Manufacturer’s Authorisation Forms 29 th
(i) Attachment 9: Work Completion Schedule
(j) Attachment 11: Information regarding ex-employees of Employer in our firm
(k) Attachment 12: Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents
(l) Attachment 13: Declaration regarding Social Accountability
(m) Attachment 14: Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(n) Attachment 15: Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises.
(o) Attachment 16: Additional information
(p) Attachment 17: Declaration for tax exemptions, reductions, allowances or benefits
(q) Attachment 18: Safety Pact
(r) Attachment 19: Declaration regarding Price bid.
(s) Attachment 20: Declaration of Key Managerial Person and Power of Attorney holder
(t) Attachment 21: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order and MoP Order, if applicable
(u) Attachment 22: Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1 (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture)
(v) Attachment 23: Certification by the Bidder per DoE Order in line with ITB Clause 2.1
(vi) Attachment 24: Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
(vii) Attachment 25: Confirmation in regard to Type Test (to be furnished in case bidder is proposing to qualify through Note-4 under Route-1 of QR).
(viii) Attachment 26: Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron & Steel Products
(ix) Attachment 27: Affidavit of Self certification regarding Domestic Value Addition in Iron & Steel Products (submission of Hard Copy in ‘Original’)
1.2 [*Applicable only in case of MSE bidders].We are a Micro and Small Enterprise (MSE) registered with , a Designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01.06.2020 read in conjunction with related notification issued from time to time for such enterprises
1.3 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
B. Second Envelope
1.1 In continuation of First Envelope of our Bid, we have submited the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents for the sum specified in our Second Envelope Bid, in accordance with the terms & conditions of the Bidding Documents. We hereby confirm that the total amout of our bid is in accordance with the prices quoted by us under different Heads, as detailed below:
i. Ex-works Price of Plant and Equipment (including mandatory Spares) to be supplied;
ii. Local Transportation, In-transit Insurance and Loading & Unloading for supply of Plant & Equipment;
iii. Installation Charges (including civil works);
iv. Taxes and Duties amount
1.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
3.2 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
D. Construction of the Contract
5.1* We declare that we have studied GCC Sub-Clause 2.1 relating to mode of contracting for Foreign Bidders and we are making this proposal with a stipulation that you shall award us three separate Contracts viz ‘First Contract’ for all works to be performed in countries outside India covering, inter-alia, the Off-Shore Supply of equipment & materials including mandatory spares (CIF Supply), testing to be conducted aborad and training to be imparted abroad; ‘Second Contract’ for Supply of equipment & materials including mandatory spares (Ex-works Supply) and testing to be conducted within India; and ‘Third Contract’ for providing all services i.e. port handling and custom clearance of the imported goods; further loading and inland transportation for delivery at site, unloading, storage, handling at site, installation, testing and commissioning including Trial Operation in respect of all equipment & materials supplied under both ‘First Contract’ and ‘Second Contract’ and any other services specified in the Bidding Documents.
We declare that the award of three contracts, will not, in any way, dilute our responsibility for successful operation of Plant/Equipment and fulfillment of all obligations as per Bidding Documents and that all the three Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the remaining contracts which will confer on you the right to terminate the other contracts at our risk and cost and/or recover damages under any or all the Contracts.
# Further, M/s. Indicate the name of Associate here, if applicable., whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts. , whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts.
The above-mentioned proposed Associate(s) shall directly enter into the ‘Second Contract’ and/ or ‘Third Contract’ with you and all the three contracts shall contain the aforesaid cross-fall breach clause. It is expressly understood that in case of breach of the Second and/or Third Contract by the Associate(s), we shall be liable for all the consequences of breach thereof notwithstanding that the Contract is awarded to the Associate(s). In case the Associate(s), despite his written consent fails to enter into the ‘Second Contract’ and/or ‘Third Contract’ with you, or if the Employer in his judgment does not find acceptance of the proposed Associate(s) as its Contractor, then we undertake to enter into and execute all the Contracts, inter alia, containing the aforesaid cross-fall breach clause. In such an event, the over-all financial liability of the Employer, under the Contract shall, however, not exceed that envisaged in our this bid. (# Applicable only in case assignment is permitted by the Employer.)
1.0 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, In-transit insurance, unloading, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents.
We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
2.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c ) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e ) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
3.0 We undertake, if our bid is accepted, to commence the work on Facilities immediately upon your Notification of Award to us, and to achieve Completion within the time stated in the Bidding Documents.
4.0 If our bid is accepted, we undertake to provide a Performance Security(ies) in the form and amounts, and within the times specified in the Bidding Documents.
5.0 We agree to abide by this bid for a period of 180 (one hundred and eighty) days after the date of opening of Techno - Commercial Part i.e. First Envelope as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
6.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
7.0 We understand that you are not bound to accept the lowest or any bid you may receive.
*12.0 (for Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
8.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain
Yours faithfully,
For and on behalf of : 1
Date : 00 January 1900 Printed Name: 0
Place : Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
(State/Province to be indicated)
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for:
(a) Attachment 2: Power of Attorney.
(b) Attachment 7: The details of Alternative Bid
(For Attachments 2 and 7, Bidders may use their own proforma for furnishing the required information with the bid).
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract Services 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
"Saudamini", Plot No. 2, Sector 29 11 eleven 11 th 11 November
Gurgaon (Haryana) - 122001 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1. 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
Or Online Payment Acknowledgement towards Bid Security for a sum of ................................................ (name of currency and amount in words and figures)
Or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II Please note that if bid validity is less than 250(Two Hundred and Fifty) days from the date set for opening of bids, your bid may be rejected
(b) Attachment 2(RFx: 5002002307) : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3(RFx: 5002002307) : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). 0 Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 1 Not Applicable 24 th
(d) Attachment 4(RFx: 5002002307) : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5(RFx: 5002002307) : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A(RFx: 5002002307) : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6(RFx: 5002002307) : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7(RFx: 5002002307) : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8(RFx: 5002002307) : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9(RFx: 5002002307) : Work Completion Schedule. 31 st
(k) Attachment 10(RFx: 5002002307) : Guarantee Declaration.
(l) Attachment 11(RFx: 5002002307) : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12(RFx: 5002002307) : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13(RFx: 5002002307) : Declaration regarding Social Accountability.
(o) Attachment 14(RFx: 5002002307) : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15(RFx: 5002002307) : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16(RFx: 5002002307) : Additional Information.
(r) Attachment 17(RFx: 5002002307) : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18(RFx: 5002002307) : Safety Pact
(t) Attachment 19 (RFx: 5002002307) : Declaration.
(u) Attachment 20 (RFx: 5002002307) : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 (RFx: 5002002307) : Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron &Steel Products
(w) Attachment 22 (RFx: 5002002307) : Self Certification regarding Domestic Value Addition in Iron & Steel Products
(x) Attachment 23 (RFx: 5002002307) : Self certification regarding Minimum Local Content in line with PPP-MII order, 2017 if applicable
(y) Attachment 24 (RFx: 5002002307) : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
(y) Attachment 25 (RFx: 5002002307) : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c) GCC 5.7 Contractors Responsibility
(d) GCC 8 Terms of Payment
(e) GCC 9.3 Performance Security
(f) GCC 10 Taxes and Duties
(g) GCC 21.2 Completion Time Guarantee
(h) GCC 22 Defect Liability
(i) GCC 23 Functional Guarantee
(j) GCC 25 Patent Indemnity
(k) GCC 26 Limitation of Liability
(l) GCC 38 Settlement of Disputes
(m) GCC 39 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and address of agent Amount and Currency Purpose of Commission or gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(RFx: 5002002307) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(RFx: 5002002307) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
1 CRB plinth area assumed as 750 sqm, as per input by Engg-S/s.
2 As per input by Engg-S/s, the fault level of the 400 kV tower/ equipment is 63 kA and that for 220 kV tower/ equipment is 40 kA.
3 As intimated by Engg-S/s, WT equipment shall be mounted in two phases, however foundation shall be cast for all three phases, hence for 3 circuit, a total of 3×3 = 9 foundations shall be cast.
4 As per discusison with Engg-S/s, for SF6/ Air bushing, scope of support structure is combined with that of GIS, hence no separate structural quantity is considered for it's support structure.
5 As per input by Engg-S/s, LM Iis of 50 m height.
6 For SF6/ Air bushing, foundation quantities are taken same as that of respective level LA support structure.
7 As per discussion with Engg-S/s, for 400 kV busduct support structure, it is assumed that, three bus ducts are mounted one support strucutre, running lenth of these support structures is provided in the input.
8 Plot area considered is 1,97,537 sqm (data from site selection committee) and area to be levelled as 1,50,000 sqm (input by Enggg-S/s).
9 Earthwork for cutting and filling has been taken as: (1/2 of levelling area) × 0.5m = 75,000×0.5 = 37,500 cum.
10 Supply of earth has been taken as: (1/2 of levelling area) × 1.0m = 75,000 × 1.0 = 75,000 cum.
11 No road with paver block is considered, not even for road between main gate and CRB. All roads considered in the S/s are concrete roads. The roads in switchyard shall have PCC shoulder.
12 1000 m road is given as input, 2,000m of drain considered. 60% (A-A), 15% (B-B), 15% (C-C), 10% (D-D)
13 An approach road (concrete, 5.5 m wide), 800 m long from highway to S/s main gate is considered; input-based on site selection committee's visit. No PCC shoulder and drains considered for this road.
14 As such no quantities for diversion of an existing throughfare (crossing our plot) is considered.
15 As such no separate foudnation quantities for CMB for Transformer & Reactor is assumed.
16 As such no quantities/ line item is considered for 'buried cable trenches for auxiliary power arrangement'
17 2 nos of Rain Water Harvesting unit is considered.
18 RCC hume pipes NP-3 (250/300/450 mm) have been considered for crossings of cable trench & road. No of crossings considered are 1no./50 running meter of trench, except for Sec4-4.
19 Rampur lies in UP, basic wind speed: 47 m/s (IS 875: Part 3), basic wind speed: 50 m/s (NBC 2016)
20 Structure quantities for tower, equipment, RCC & reinforcement steel quantities have been calculated on the basis of standard drawings based on 47 m/s as basic wind speed (COST PLUS model). Further as a general pracice, these quantities are reduced by 15% to fit into the TBCB model. However the location of the S/s lies in 50 m/s basic wind speed zone as per NBC 2016, hence this 15% reduction in quantities is not considered in this BOQ.
21 Scope of diversion of an existing nallah (which crosses our plot), shall be deemed to be inclued in the levelling works itself. The same needs to be incorporated in the Section-Project.
22 Total quantitiy calcultated for lattice structure has been split into 90% (MS) & 10% (HT). This is done to keep the scope for optimization in steel structures open.
23 PCC (1:4:8) has been assumed under Water Tank for FFPH instead of PCC (1:3:6).
24 1 no of 5 HP dewatering pump is considered for cable trench sump pit and 2 nos of dewatering pump for 400/20 kV Transformers
25 No separate structure quantities for 1 no of double pole structue considered. Lattice (MS) structure qunatity can take care of it.
26 Section-Project: The scope of work shall include but shall not be limited to the following based on Contractor supplied drawings
i Foundations for 400 kV & 220 kV bus duct supporting structures and 400 kV and 220 kV GIS bushing (SF6/Air bushing).
ii All civil works including foundations associated with erection of SF6 gas insulated metal enclosed switchgear along with its SF6 ducts.
iii Foundation for lighting poles/panels, bay marshalling boxes, Control cubicles etc.
iv Preparation of storm water drainage layout using POWERGRID standard sections.
v Stone spreading and anti weed treatment including PCC in the switchyard. A layout for the same shall be develeoped by the contractor.
vi Structure and foundation of all equipment and towers for all voltage level.
vii Foundation along with road cum rail tracks, jacking pads unloading platforms, pulling blocks, Gratings, oil pit, firewalls etc. for 02 units of 400/220kV, 3-Phase Transformers.
viii Cable trenches including cable trenches in Transformer area along with covers including road/rail crossing, sump pits, culverts etc. The cable trench layout including invert levels shall be developed by the contractor.
ix All roads as per the layout. Road layout shall be developed by the contractor.
x Fire Fighting Pump House (FFPH) and Water Tank, Control Room Building (CRB), 400 kV GIS Hall, 220 kV GIS Hall, Transit Camp cum Field Hostel as per specification, complete in all respect. Reference concept drawings for FFPH, Water tank, CRB, Tranit Camp cum Field Hostel shall be made available in the tender documents.
xi The roofing of the AHU Room and Panel Rooms (along with bith the GIS Halls) shall be of puff sandwhich panels same as that for GIS Halls.
xii For RCC frame structure buildings and Pre-engineered buildings, the complete civil works including internal and external finishing, stone soling for flooring, plinth protection, drain along plinth protection, electrical conduit and junction boxes, fan boxes, cable transit system etc. required to complete the building in all respect as per the draing shall be payable in the plinth area rate. However teh quantity of the earthowrk (excavation, backfilling, disposal etc.), concrete (all types), reinforcement steel shall be measured and paid under respective items under BPS.
xiii PEB closed store for GIS spares as per specification, complete in all respect. Reference concept drawings for the same shall be made available in the tender documents.
xiv Permanent water supply for control room cum administrative building, Fire fighting pump house building, fire fighting system and transit system.
xv Laying of plumbing and external sewerage system for control room builing, transit camp and security hut.
xvi Foundation for Auxiliary LT transformers & DG set.
xvii Septic tank and Soak pit for control room building (20 no of users), transit camp (20 no of users).
xviii Soil investigation and measurement of earth resistivity as per technical specifications.
xiv Contouring and leveling of the plot and the area for approach road including supply of borrowed earth and filling if any. Proposal of FGL (Finished Ground level) for finalization by the employer based on HFL data etc.
27 Section-Project: The scope of work shall include but shall not be limited to the following based on Owner supplied drawings
i Construction of boundary wall, main gate and security hut as per specification and drawings, including septic tank and soak pit for security hut (05 no of users).
ii Switchyard fencing and switychyard gate.
iii Switchyard cable trench sections.
iv Roads sections.
v Approach road section.
vi Drain sections.
vii Rain water harvesting drawings.
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
SAP Material No Sl. No. Item Description Unit Quantity
SAP Activity No
1000012040 1 HVW Spray system, Hydrent system and complete U/G and O/G piping and accessories etc. outside the pumphouse for 110 MVAR 765KV/ ᷇3 single phase Bus Reactor Nos. 3.0
1000011349 2 ERECTION H/W-765KV BUS REACTOR BAY SET 1.0
1000012373 3 Foundation bolts including nuts, checknuts and washer for lattice/pipe structures MT 2.3
1000030433 4 Color IP Camera With pan, Tilt and Zoom facilities along with all required items, accessories line interface units and fiber cable etc. and including integration in existing Hardware and software for augumention of visual monitoring system SET 1.0
1000014535 5 Lighting fixture type-SF1 as per Technical Specification EA 4.0
1000014536 6 Lighting fixture type-SF2 as per Technical specification EA 4.0
1000014547 7 Lightening Panel Type -ACP-2 as per Technical Specification EA 2.0
1000014548 8 Lightening Panel Type -ACP-3 as per Technical Specification EA 1.0
1000020262 9 Sub-Lighting Panel (Outdoor)type SLP switchyard and street lighting EA 2.0
1000004302 10 40 MM MS ROD FOR MAIN EARTH MAT M 100.0
Note: OWNER SUPPLIED MATERIAL
1000005791 1 765KV, 1PH BUS POST INSULATOR (BPI) EA 3
1000031964 2 1.1KV 3CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000031987 3 1.1KV 5CX2.5SQMM PVC CONTROL CABLE(KM) KM 2
1000031993 4 1.1KV 7CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000031887 5 1.1KV 10CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000031904 6 1.1KV 14CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000032049 7 4 PAIR, 0.5 SQMM SCREENED CABLE(KM) KM 1
1000031957 8 1.1KV 3.5CX70SQMM PVC POWER CABLE(KM) KM 0
1000031943 9 1.1KV 2CX6SQMM PVC POWER CABLE(KM) KM 0
1000031985 10 1.1KV 4CX6SQMM PVC POWER CABLE(KM) KM 2
1000056264 11 1.1KV 19CX1.5SQMM PVC CONTROL CABLE(KM) KM 1
1000056265 12 1.1KV 27CX1.5SQMM PVC CONTROL CABLE(KM) KM 1
1000015954 13 Fabrication, supply and galvanising of Lattice structures (MS Steel) MT 15.3 MT
1000011713 14 Fabrication, supply and galvanising of Fasteners, Nuts, Bolts and Washers includes 3 nos. 765 kV BPI & 1 no. LM
1000015927 3 NEUTRAL FORM-110MVAR 765KV REACTOR 1BANK LOT 0.0 Existing Line reactor Neutral Bus will be reused
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
(Installation Part)
SAP Activity No Sl. No. Item Description Unit Quantity
SAP Activity No
100002911 1 Excavation in all kind of soil including rock for all leads and lifts, backfilling, disposal of surplus earth within a lead up to2Km as per technical specification. The surplus earth shall be roughly graded . M3 1,999.10
100001325 2 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) M3 103.87
100001326 3 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) M3 6.04
100001327 4 Providing and laying of Reinforced Cement Concrete M25 mix including pre cast, shuttering, Grouting of pockets & underpinning but excluding steel reinforcement. M3 656.57
100001329 5 STEEL REINFORCEMENT MT 52.53
100001331 6 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc. but excluding the reinforcement MT 19.88
100003692 7 STONE FILLING (40MM) M3 42.00
100001458 8 Construction of rail cum road as per drawing including all item such as excavation,compactions, rolling watering, WBM etc. but excluding concrete reinforcement and structural steel-Section having two rails for Reactor. Sq.m. 189.00
100001328 9 PLAIN CEMENT CONCRETE (PCC-1:5:10) M3 50.63
100001714 10 STONE SPREADING IN SWITCHYARD EXCLUDING PCC Sq. m. 675.00
100001713 11 ANTIWEED TREATMENT Sq.m. 675.00
100001412 12 DRAIN SECTION A-A RM 15.00
100001413 13 DRAIN SECTION B-B RM 15.00
130000761 14 14.4.2 Providing, laying and fixing following dia RCC pipe NP2 class (light duty) in ground complete with RCC collars, jointingwith cement mortar 1:2 (1 cement : 2 fine sand) including trenching (75 cm deep) and refilling etc as required. : 150 mm dia RM 30.00
130000762 15 14.4.3 Providing, laying and fixing following dia RCC pipe NP2 class (light duty) in ground complete with RCC collars, jointingwith cement mortar 1:2 (1 cement : 2 fine sand) including trenching (75 cm deep) and refilling etc as required. : 250 mm dia RM 394.00
100003114 16 External finishing / painting of fire wall (water proofing cement paint) (DSR 13.44.1) Sq.m. 478.08
100007701 17 Supplying and erecting dewatering pumps- 2 HP Nos. 3.00
100001454 18 DEMOLISHING RCC WORK INCLUDING STACKING OF STEEL BAR SAND DISPOSAL OF UNSERVICEABLE MATERIAL M3 10.00
100001542 19 DISMANTLING AND RE-ERCTION OF EXISITNG FENCE RM 15.00
100001442 20 DISMANTLING OF EXISITNG BRICK DRAIN RM 50.00
100001712 21 Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm 50.00
100001712 22 Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm 50.00
100001735 23 RCC culverts and cable trench crossings including supplying and laying hume pipe 250mm dia of grade (NP-3) excluding concrete RM 10.00
A. TOTAL OF CIVIL WORKS (In Rs.)
B. Dismantling /Erection
- 24 Dismantling of Support structure MT 6.92
100001210 25 Erection of Lattice Structures (MS Steel), for towers, beams and equipment support structure including pack plates / packwashers and gusset plates excluding fasteners and foundation bolts MT 22.53
100001680 26 Erection of fasteners ( nuts, bolts and washers ) including step bolts for lattice and pipe structures to be designed during detailed engineering MT 0.76
100001681 27 Erection of foundation bolts including nuts, checknut and washers for lattice and pipe structures to be designed during detailed engineering MT 2.28
B. TOTAL OF Dismantling/Erection of Structure (In Rs.)
C. Electrical Erection works
100000183 28 ERECTION- SURGE ARRESTER,1-PH,624KV No 3.00
100000194 29 ERECTION-765kV BPI SET 6.00
100001008 30 HVW SPRAY SYSTEM, HYDRENT SYSTEM AND COMPLETE U/G AND O/G PIPING AND ACCESSORIES ETC. OUTSIDE THE PUMPHOUSE FOR 110 MVAR 765KV/ ᷇3 SINGLE PHASE BUS REACTOR No 1.00
100000724 31 765KV REACTOR PROTECTION PANEL-SAS Mandays 4.00
100002068 32 765KV S/S AUTOMATION SYSTEM-MAIN BAY-AUG Mandays 4.00
100016786 33 FIRE PROTECTION-765 KV 1PH REACTOR SET 3.00
100002181 34 1.1KV PVC POWER CABLE LS 1.00
100002182 35 1.1KV PVC CONTROL CABLE LS 1.00
100000186 36 ERECTION H/W-765KV BUS REACTOR BAY SET 1.00
100003034 37 4 PAIR, 0.5 SQMM SCREENED CABLE (KM) KM 0.50
100002500 38 Color IP Camera With pan, Tilt and Zoom facilities along with all required items, accessories line interface units and fiber cable etc. and including integration in existing Hardware and software for augumention of visual monitoring system SET 1.00
100001041 39 Lighting fixture type-SF1 as per Technical Specification EA 4.0
100001042 40 Lighting fixture type-SF2 as per Technical specification EA 4.0
1000001021 41 Lightening Panel Type -ACP-2 as per Technical Specification EA 2.0
1000001022 42 Lightening Panel Type -ACP-3 as per Technical Specification EA 1.0
1000001024 43 Sub-Lighting Panel (Outdoor)type SLP switchyard and street lighting EA 2.0
100001148 44 40 MM MS ROD FOR MAIN EARTH MAT M 100.0
C. TOTAL OF Electrical erection works (In Rs.)
(A+B+C) Total for Installation (In Rs.)
QTY. ESTIMATE FOR 400 kV BAY AT SUBSTATION
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10 F/W painting/ unit F/W painting PCC/UNIT PCC 1:3:6
A 765 kV Gantry
B 400 KV TOWERS 0 0
C 220 KV TOWERS 0 0
400 KV TOWERS (FIROZABAD) 0 0 0 0 0 0
220 KV TOWERS (FIROZABAD) 0 0 0 0 0 0
C.1 145 KV TOWERS 0 0
D 765 Kv EQUIPMENTS 0 0
E.1 400 KV EQUIPMENTS (63 kA fault level) 0 0
7 WT 3.744 0 0.588 0 22.62 0 157.404 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments 0 0
E.2 400 KV EQUIPMENTS (upto 50 kA fault level) 0 0
7 WT 3.12 0 0.49 0 18.85 0 131.17 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments 0 0
F 220 KV EQUIPMENTS 0 0
G 132 KV EQUIPMENTS 0 0
H Cable Trench 0 0
I Road with PCC Shoulder 0 0
J Road with Paver Block 0 0
Rail Cum Road 0 0
2 4 rail (already included in trf/rtr quant) 0 0
K TRANSFORMER 0 0
Common Oil Pit for 765 kV Reactor 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0 0 0
M rainwater harvesting 3.38 0 0 0 0 0 152 0 0 0 0 0 0 0 0 0
V PCC FOR RCC PIPE TO COMMON OIL PIT 50 0 0 0.25 12.5 0.3 15 0 0 0 0 0.12 6 0 0 0 0
X PCCFOR STONE SPREADING 675 50.625 0 0
CONTROL ROOM 750 AREA 900 0 40 0 750 0 63000 0 0 0
Insulator Guy Wire Arrangement 1.175 0 0.2 0 5.98 0 41.1 0 0 0
Outdoor Hybrid GIS (8m×5m×.75m plinth ht) 50 0 3.1 0 56.4 0 2000 0 0 0
Outdoor Hybrid GIS (8m×4m×.75m plinth ht) 40 0 2.5 0 46.9 0 1600 0 0 0
PEB Store_GIS Spare_400kV (15m×20m×6m) 260 0 60 0 840 0 21000 0
PEB Store_GIS Spare_765kV (15m×30m×6m) 350 0 75 0 1080 0 27000 0
quantity due to pile 627 0 82.00 0.00 1414 0 31000 0 0 0
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
in MT below 220 kV 220 kV 400 kV 765 kV Total Reduction by 0% Actual qty considered
below 220 kV Equipment
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
220kV TOWERS AND BEAMS
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
220kV EQUIPMENT SUPPORT STRUCTURES
400kV TOWERS AND BEAMS
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners Total excluding fateners No. of Foundation Bolts Dia. of Foundation Bolts (mm) unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. X unit wt excluding fdn bolt Fasteners MS foundation bolts
400kV EQUIPMENT SUPPORT STRUCTURES
765kV TOWERS AND BEAMS
Sl. No. Structure Structure Steel MS Structure Steel HT Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
765kV EQUIPMENT SUPPORT STRUCTURES 0 0
Note: 1 7CC portal has 2 nos of 7CC tower, 1 no of BE,1 no of BF, 1 no of GWCC.
Supply required for structures
Nos Unit weight total
Cable Breakup- Supply
SI. No. SAP Activity No Item Description Unit Qty Unit Rate Amount (Rs) Unit Rate Amount (Rs) Unit Rate Amount (Rs) Remarks/ Reference
Supply F&I Erection
K 1.1kV Grade Power & Control Cables alongwith clamps, lugs, glands, straight through joints etc.
K1 Power Cables
K2 Control cable
Cable Trench Crossing
NP-3 Hume Pipe Dia (mm) Wall Thk (mm)
QTY1 QTY2 250 30
Width of road (m) 3.75 Width of road (m) 3.75 Width of road (m) 5.5
Lenth of hume pipe to be taken (m) 6 Lenth of hume pipe to be taken (m) 6 Lenth of hume pipe to be taken (m) 7.5
Section 2-2 Crossing Road Section 2-2 Crossing Road Section 2-2 Crossing Road PCC (1:2:4) 0.225 m
No of xsings 0 No of xsings 0 No of xsings 0
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum 1.63 m
RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos Sec 2-2
RCC Hume Pipe 300 mm 1 Nos RCC Hume Pipe 300 mm 1 Nos RCC Hume Pipe 300 mm 1 Nos
RCC Hume Pipe 450 mm 1 Nos RCC Hume Pipe 450 mm 1 Nos RCC Hume Pipe 450 mm 1 Nos
Section 3-3 Crossing Road Section 3-3 Crossing Road Section 3-3 Crossing Road
No of xsings 0 No of xsings 0 No of xsings 0 PCC (1:2:4)
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum
RCC Hume Pipe 250 mm 2 Nos RCC Hume Pipe 250 mm 2 Nos RCC Hume Pipe 250 mm 2 Nos PCC (1:2:4)
RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos
RCC Hume Pipe 450 mm 0 Nos RCC Hume Pipe 450 mm 0 Nos RCC Hume Pipe 450 mm 0 Nos
Section 1-1 & 2A-2A Crossing Road Section 1-1 & 2A-2A Crossing Road Section 1-1 & 2A-2A Crossing Road
No of xsings 0 No of xsings 0 No of xsings 0
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum 2.7 m
RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos
RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos
RCC Hume Pipe 450 mm 4 Nos RCC Hume Pipe 450 mm 4 Nos RCC Hume Pipe 450 mm 4 Nos
Total PCC (1:2:4) 0 cum Total PCC (1:2:4) 0 cum Total PCC (1:2:4) 0 cum
Total PCC (1:4:8) 0 cum Total PCC (1:4:8) 0 cum Total PCC (1:4:8) 0 cum
RCC Hume Pipe 250 mm 0 RM RCC Hume Pipe 250 mm 0 RM RCC Hume Pipe 250 mm 0 RM PCC (1:2:4) 0.21875 m
RCC Hume Pipe 300 mm 0 RM RCC Hume Pipe 300 mm 0 RM RCC Hume Pipe 300 mm 0 RM
RCC Hume Pipe 450 mm 0 RM RCC Hume Pipe 450 mm 0 RM RCC Hume Pipe 450 mm 0 RM
Transit Camp- New Dwg no: C/ENGG/STD/TBCB/TCFH/ARCH/04
GROUND FLOOR 1 490.84 1 0.2 98
FIRST FLOOR 1 411.76 1 0.2 82
SECOND FLOOR 1 411.76 1 0.2 82
THIRD FLOOR 1 226.97 1 0.2 45
GROUND FLOOR-PLINTH 1 220 0.23 0.6 30
FIRST FLOOR 1 176 0.3 0.75 40
SECOND FLOOR 1 176 0.3 0.75 40
THIRD FLOOR 1 176 0.3 0.75 40
THIRD FLOOR ROOF 1 128 0.3 0.75 29
Foundation 46 3 0.6 0.6 50
GROUND FLOOR 46 3 0.6 0.6 50
FIRST FLOOR 46 3 0.6 0.6 50
SECOND FLOOR 46 3 0.6 0.6 50
THIRD FLOOR 46 3 0.6 0.6 50
Foundation pad 46 2.5 2.5 0.3 86
TOTAL CONCRETE 821
EXCAVATION 46 3 3 3 1242
STEEL 80000 say
0 YYYY 220/132 kV Bhatapara GSS
NOS OF TOWER TOTAL BOLTS nos of tower total bolts nos of tower total bolts
a) 765 kV Lattice Structure DIA NOS
b) 400 kV Lattice Structure 0
c) 220kV Lattice Structure 0
c.1) 145kV Lattice Structure
d) 765kV Equipment support structure
ISO(Set of six structures) 32 12 0.0 0 0 0 0 0
WT(set of three structures) 32 16 0.0 0 0 0 0 0
e) 400KvEquipment support structure (Pipe)
ISO(Set of six structures) 28 4 0.0 0 0 0 0 0
WT(set of three structures) 28 4 0.0 0 0 0 0 0
f) 220kV Equipment support structure (Pipe) 20MM DIA 24MM DIA 28MM DIA 32MM DIA 40MM DIA 56MM DIA 63MM DIA 80MM DIA
ISO(Set of six structures) 28 24 0.0 0 TOTAL 0 0 0 0
WT(set of three structures) 28 12 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) 132kV Equipment support structure (Pipe)
WT(set of three structures) 24 0.0 0 0 0 0 0
g) 72.5kV Equipment support structure (Pipe)
ISO ( SET OF 3 STRUCTURE ) 28 24 0.0 0 0 0 0 0
h) double pole str 28 12 0.0 0 0 0 0 0
i) 33 kV Equipment support structure (Lattice) 0 0 0
QTY. ESTIMATE FOR 765/400/220kV SUBSTATION AT YYYY
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10
A 765 kV Gantry
B 400 KV TOWERS
C 220 KV TOWERS
C.1 145 KV TOWERS
D 765 Kv EQUIPMENTS
E 400 KV EQUIPMENTS
7 WT 0 3.12 0 0.49 0 18.85 0 131.17 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments
F 220 KV EQUIPMENTS
G 132 KV EQUIPMENTS
I Road with PCC Shoulder
J Road with Paver Block
Common Oil Pit for 765 kV Trans. 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
Common Oil Pit for 765 kV Reactor 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
6 Fire wall for Reactor 765kV 0 45 0 2.4 0 80 0 4500 0 0 0 0 0 0 0
M rainwater harvesting 0 3.38 0 0 0 0 0 152 0 0 0 0 0 0 0
X PCCFOR STONE SPREADING 0 0
W Double Pole 0 12 0 2 0 52 0 800 0
CONTROL ROOM 750 AREA 0 900 0 40 0 300 0 63000 0
Z LT TRANSFORMER 0 7.5 0 0.4 0 16 0 95 0
QTY. ESTIMATE FOR 765/400/220kV SUBSTATION AT ZZZ
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10
A 765 kV Gantry
B 400 KV TOWERS
C 220 KV TOWERS
D 765 Kv EQUIPMENTS
E 400 KV EQUIPMENTS
7 WT 0 3.12 0 0.49 0 18.85 0 131.17 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments
F 220 KV EQUIPMENTS
G 132 KV EQUIPMENTS
I Road with PCC Shoulder
J Road with Paver Block
Common Oil Pit for 765 kV Trans. 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
Common Oil Pit for 765 kV Reactor 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
6 Fire wall for Reactor 765kV 0 45 0 2.4 0 80 0 4500 0 0 0 0 0 0 0
M rainwater harvesting 0 3.38 0 0 0 0 0 152 0 0 0 0 0 0 0
X PCCFOR STONE SPREADING 0 0
W Double Pole 0 12 0 2 0 52 0 800 0
CONTROL ROOM 750 AREA 0 900 0 40 0 300 0 63000 0
Z LT TRANSFORMER 0 7.5 0 0.4 0 16 0 95 0
Attachment-3 (QR)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1
Specification No.: NR3/NT/W-AIS/DOM/K00/23/08177 RFx: 5002002924
(Qualifying Requirement Data)
Bidders’s Name & Address: Contract Services
Name: Power Grid Corporation of India Ltd.,
Address: "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & Additional Information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details along with other information, as follows herewith our stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail).
* We have submitted bid as individual firm.
* We have submitted bid as joint venture of following firms :
(* Strike-off whichever is not applicable)
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Bidder/Lead Partner In case of Joint Venture
For Other Partner(s) For Other Partner(s)
1 Name of the Firm
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
1.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
TECHNICAL EXPERIENCE
1.1 Route-1: 1.1 The Bidder must have designed, manufactured, type tested (as per IEC or equivalent standard), supplied and supervised erection & commissioning of at least two (2) nos. Gas Insulated Switchgear (GIS) circuit breaker bays@ of 110KV or above voltage class in one (1) Substation or Switchyard during the last seven (7) years and these bays must be in satisfactory operation# for at least two (2) years as on the originally scheduled date of bid opening i.e.29.07.2022.
2.1.1 In case the Bidder is a Foreign Entity, following requirements shall be complied:
i (i) If the bidder is submitting its bid as an Individual Firm or in a Joint Venture without any Indian Entity as a Partner, the bidder must, in its bid, propose an Indian Associate for executing the On-Shore Supply and On-Shore Services Contract, as per the provisions of bidding documents. The proposed Indian Associate must have erected, tested and commissioned at least two (2) nos. GIS/AIS Circuit Breaker equipped bays of 110KV or above voltage level in one (1) substation or switchyard during the last seven (7) years and these bays must be in satisfactory operation# as on the originally scheduled date of bid opening mentioned above For executing on-shore supply contract, the bidder in its bid, may alternatively propose its Indian Subsidiary or Group or Joint Venture Company as Indian Associate provided that the proposed Indian Associate has been registered in India (as per Companies Act 1956 or 2013 of India) for establishing manufacturing and testing facilities for 765kV GIS or above voltage level as on the date of bid opening mentioned above.
ii A) The Subsidiary or Group Company or a Joint Venture Company (JVC) of the bidder shall have manufacturing & testing facilities for 110kV or above voltage level GIS in India as on the originally scheduled date of bid opening mentioned above. OR The bidder must have incorporated a Subsidiary or Group Company or a Joint Venture Company (JVC) as per Companies Act 1956 or 2013 of India, to manufacture 765kV or above voltage level GIS in India and it must have commenced the construction activities for establishment of 765kV or above voltage level GIS manufacturing and testing facilities in India as on the originally scheduled date of bid opening mentioned above. B) The bidder must supply at least one (1) no. 765kV GIS Circuit breaker bay* manufactured in the said facilities in India, for which Bidder shall furnish an undertaking (as per enclosed format in Volume-III of Bidding Document) along with the bid. C) Bidder can offer to supply more than one 765kV GIS circuit breaker bay* from Indian works of its Subsidiary or Group Company or a Joint Venture Company (JVC) provided the Subsidiary/JVC/Group Company must have manufactured at least one (1) number 765kV or above voltage level GIS Circuit Breaker bay* and this bay should have been either supplied or type tested (as per IEC or equivalent standard) as on the originally scheduled date of bid opening mentioned above.
1.2 Route-2: The Bidder, who has established manufacturing & testing facility in India for 110kV or above voltage level GIS but not meeting the requirement stipulated in Para 1.1 above, shall also be considered provided that- a)The Bidder must have manufactured, at least one (1) no. 110kV or above voltage class GIS circuit breaker bays@ based on technological support of the collaborator(s), provided that the collaborator(s) meets the requirement stipulated in para 1.1 above. Further bidder must have either supplied or type tested above CB bay (as per IEC or equivalent standard) as on the originally scheduled date of bid opening mentioned above. b) Further, the bidder shall also submit the following along with the bid: i. A legally enforceable undertaking (jointly with the Collaborator(s) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s). ii. A confirmation letter from the Collaborator(s) stating that the Collaborator(s) shall furnish performance guarantee for an amount of 3 % of the ex-works cost of such equipment(s). This performance guarantee shall be in addition to Contract Performance Guarantee to be submitted by the bidder. iii. A valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110kV or above voltage level GIS equipment in India.
1.3 Route-3: 1.3 The Bidder, who has established manufacturing & testing facility in India for 110kV or above voltage level GIS as Subsidiary/JVC/Group company by its parent/principal but not meeting the requirement stipulated in para 1.1 above, shall also be considered provided that- a) The Bidder must have manufactured, at least one (1) no. 110kV or above voltage class GIS circuit breaker bays@ based on technological support of the parent/principal, provided that the parent/principal meets the requirement stipulated in para 1.1 above. Further bidder must have either supplied or type tested above CB bay (as per IEC or equivalent standard) as on the originally scheduled date of bid opening mentioned above. b) Further, the bidder shall also submit the following along with the bid: i. A legally enforceable undertaking (jointly with the parent/principal company) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s). ii. A confirmation letter from the parent/principal company stating that the parent/principal company shall furnish performance guarantee for an amount of 3 % of the ex-works cost of such equipment(s). This performance guarantee shall be in addition to Contract Performance Guarantee to be submitted by the bidder. iii. A valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110kV or above voltage level GIS equipment in India.
1.4 Route-4 1.4 In case, the bidder is not a GIS manufacturer, he shall also be considered provided: i. The bidder must have erected and commissioned at least two (02) nos. GIS circuit breaker bays of 110kV or above voltage class in one (01) new GIS substation or switchyard during last seven (07) years and these bays must be in satisfactory operation# for at least two (02) years as on the originally scheduled date of bid opening mentioned above. ii. The GIS must be offered from Indian manufacturer, who meets the requirement mentioned at Route-1 or Route-2 or Route-3 above. iii. A legally enforceable undertaking (jointly with the GIS Manufacturer) (as per enclosed format in Section-VI, Vol-I of bidding document) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s) is submitted along with the bid stating that GIS Manufacturer shall furnish performance guarantee for an amount of two (2) % of the total contract price. This performance guarantee shall be in addition to the Contract Performance security to be submitted by the Bidder.
Note :- 1. (#)Satisfactory operation means certificate issued by the Employer certifying the operation without any adverse remark. 2. (*) For the purpose of qualifying requirement, one no. of circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs / Bushing CTs. 3. In case bidder is a holding company, the technical experience referred to in Route-1, 2, 3 & 4 above as the case may be shall be of that holding company only (i.e. excluding its subsidiary/group companies). In case bidder is a subsidiary of a holding company, the technical experience referred to in Route-1, 2, 3 & 4 above as the case may be shall be of that subsidiary company only (i.e. excluding its holding company). 4. In case bidder is qualifying through Route-1, type test reports of Collaborator/ Parent Company/Subsidiary Company/ Group Company shall also be acceptable, for which a confirmation shall be furnished along with the bid as per format attached in the bidding documents.
Using the following format, each Bidder (individual firms or partners of a joint venture) is requested to list the experience as detailed above, on the basis of which the Bidder wishes to qualify. The information is to be summarised using following format for each experience of the Bidder or of each Partner of a Joint Venture.
(The bidder shall attach documentary evidence, such as copies of utility certificates for completed contracts and copies of award letters etc. for ongoing contracts in support of his experience as listed in the following proforma for each Contract with the help of "Attach" Buttons provided in table given below).
Format for the Bidder/Collaborator/ Parent/Principal/Partner of JV in case of Joint Venture/Indian GIS Mnaufacturer in support of meeting the requirement of para 1.1, Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of Bidder/Collaborator/ Parent/Principal/Partner of a JV/Indian GIS Manufacturer #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
4(a)(i) Voltage Level of GIS Substation commissioned under the Contract
No. of GIS Circuit Breaker equipped bays under the above contract
Name of the substation or switchyard
(a)(ii) No. of years, the above Substation have been in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
NOTE: type test reports of Collaborator/ Parent Company/ Subsidiary Company/ Group Company shall also be acceptable, for which a confirmation shall be furnished along with the bid as per format attached in the bidding documents (Attachment-25 in Volume-III)
of Gas Insulated Switchgear (GIS) circuit breaker bays. of Gas Insulated Switchgear (GIS) circuit breaker bays.
In case of foreign entity, whether bidder have established/ commence the establishment of facility as Indian Subsidiary/ Group Company/ Joint Venture Company for manufacturing & testing of 765kV or above voltage level GIS in India (as per Companies Act 1956 or 2013 of India)
Whether bidder want to propose its above subsidiary/ Group Company/ Joint Venture Company as its associate for executing On-Shore Supply Contract
Foreign Bidder can offer to supply more than one 110kV GIS circuit breaker bay* from India provided his Subsidiary or Group Company or a Joint Venture Company (JVC) must have manufactured at least one (1) number 765kV or above voltage level GIS Circuit Breaker bay* and this bay either should have been supplied or should have been type tested ( as per IEC or equivalent standard) as on the originally scheduled date of bid opening as mentioned above
Whether Undertaking (as per enclosed format in Section-VI, Sample Forms and Procedures of bidding document) for above is enclosed with the bid
Details of documents uploaded in support of the above stated experience
Format for the Indian Associate executing the On-Shore Supply and On-Shore Services Contract for a Foreign Entity submitting its bid as an Individual Firm or in a Joint Venture without any Indian Entity as a Partner, in support of meeting the requirement of para 1.1.1(i) of Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Indian Associate executing the On-Shore Supply and On-Shore Services Contract
1 Name of Contract Undertaken
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the Bidder
4 No. of GIS/AIS Circuit Breaker equipped bays under the contract
(Indicate nos. of Circuit Breaker equipped bays of 220 kV or above voltage level where one no. of circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs / Bushing CTs)
Name of the substation or switchyard
No. of years, the above CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
Details of documents uploaded in support of the above stated experience
Format-B (Route-2):
Format in support of meeting the requirement of para 1.2 Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
1 Name of the Collaborator
2 Whether bidder have established manufacturing and testing facilities in India for 110KV or above voltage level Gas Insulated Switchgear (GIS)
3 Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bay manufactured by bidder based on technological support of the collaborator have been supplied or Type tested
A if Type tested details of Type test Report
B Details of GIS supplied by them
i Name of Contract Undertaken for manufacturing 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bays
ii Contract Reference No. & Date of Award
iii Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
iv No. of 110KV Gas Insulated Switchgear (GIS) Circuit Breaker bays manufactured under the contract (Indicate nos. of Gas Insulated Switchgear (GIS) Circuit Breaker equipped bays of 110KV or above voltage level, where circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs/Bushing CTs. GIS means SF6 Gas insulated Switchgear.)
Name of the substation or switchyard
Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit breaker bays, as mentioned above, has been manufactured based on technological support of the Collaborator under the Contract.
Scope of work involved under the Contract
Details of documents uploaded in support of the above stated experience
Format in support of meeting the requirement of para 1.2 (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Collaborator (refer para 1.2), if applicable : #REF!
Name of the 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufacturer (refer para 1.2), if applicable : #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
4(a)(i) No. of Circuit Breaker bays under the contract
(Indicate nos. of Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Circuit Breaker bays of 110KV or above)
Name of the substation or switchyard
(a)(ii) No. of years, the above Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract as per IEC
(Tick whichever is/are applicable)
Whether Collaborator(s) meets the technical experience criteria stipulated at 1.1 above, and the details of which is mentioned at Format-A above. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Whether legally enforceable undertaking jointly by Bidder/Manufacturer and the Collaborator(s) (as per enclosed format in Section-VI: Sample Forms and Procedures of bidding document) is furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Confirmation letter from the Collaborator(s) along with the bid stating that Collaborator(s) shall furnish performance guarantee, in addition to contract performance guarantee to be submitted by the bidder, for an amount of 3% of the cost of equipment(s) to be manufactured and supplied from the works in India. (Applicable for the Bidder/Manufacturer wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Whether valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110KV or above voltage level GIS equipment in India furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-2 of Annexure-A(BDS))
Details of documents uploaded in support of the above stated experience
Format-C: (Route-3)
Format in support of meeting the requirement of para 1.3 Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
1 Name of the Bidder established as Subsidiary/JVC/Group company by its parent/principal Company
2 Name of the parent/principal Company
3 Whether bidder have established manufacturing and testing facilities in India for 110KV or above voltage level Gas Insulated Switchgear (GIS)
4 Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bay manufactured by bidder have been supplied or Type tested based on Technological support of their Parent/ Principal Company
A if Type tested details of Type test Report
B Details of Gas Insulated Switchgear (GIS) Circuit Breaker Bays supplied by them
i Name of Contract Undertaken for manufacturing 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit Breaker bays
ii Contract Reference No. & Date of Award
iii Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
iv No. of 110KV Gas Insulated Switchgear (GIS) Circuit Breaker bays manufactured under the contract
Name of the substation or switchyard
Whether 110KV or above voltage level Gas Insulated Switchgear (GIS) Circuit breaker bays, as mentioned above, has been manufactured based on technological support of the Parent/Principal Company under the Contract.
Scope of work involved under the Contract
Details of documents uploaded in support of the above stated experience
Format in support of meeting the requirement of para 1.2 (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Collaborator (refer para 1.2), if applicable : #REF!
Name of the 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufacturer (refer para 1.2), if applicable : #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
4(a)(i) No. of Circuit Breaker bays under the contract
(Indicate nos. of Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Circuit Breaker bays of 110KV or above)
Name of the substation or switchyard
(a)(ii) No. of years, the above Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract as per IEC
(Tick whichever is/are applicable)
Whether Parent/Principal Company meets the technical experience criteria stipulated at 1.1 above, and the details of which is mentioned at Format-A above. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Whether legally enforceable undertaking jointly by Bidder/Manufacturer and the Parent/Principal Company (as per enclosed format in Section-VI: Sample Forms and Procedures of bidding document) is furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Confirmation letter from the parent/principal company along with the bid stating that parent/principal company shall furnish performance guarantee, in addition to contract performance guarantee to be submitted by the bidder, for an amount of 3% of the cost of equipment(s) to be manufactured and supplied from the works in India. (Applicable for the Bidder/Manufacturer wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Whether valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110KV or above voltage level GIS equipment in India furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
Name of the substation or switchyard
Whether 110KV or above voltage level Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Circuit breaker bays, as mentioned above, has been manufactured based on technological support of the Parent/ Principal Company under the Contract.
If Yes, indicate the Name of Parent/ Principal Company(s)
No. of years, the above AIS/GIS Subatation(s) are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract for the above 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS bay as per IEC as on the originally scheduled date of bid opening
(Tick whichever is/are applicable)
Details of documents uploaded in support of the above stated experience
Format in support of meeting the requirement of para 1.3 (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Parent Company/ Principal (refer para 1.3), if applicable: #REF!
Name of the 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufacturer (refer para 1.3), if applicable : 0 #REF!
1 Name of Contract Undertaken #REF!
2 Contract Reference No. & Date of Award
4(a)(i) No. of Circuit Breaker bays under the contract
(Indicate nos. of Circuit Breaker bays of 110KV or above)
Name of the substation or switchyard
(a)(ii) No. of years, the above Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS CB bays are in operation as on the originally scheduled date of bid opening.
Scope of work involved under the Contract as per IEC
(Tick whichever is/are applicable)
Whether Joint Deed of Undertaking executed between The Bidder and 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS Equipment Manufaturer has been enclosed with bid ? (in line with para 1.3 (b)(i) of Annexure-A (BDS)
Whether confirmation letter from the parent/principal company stating that the parent/principal company shall furnish performance guarantee for an amount of 10% of the ex-works cost of such equipment(s) has been enclosed with bid? (in line with para 1.3(b)(ii) of Annexure-A (BDS)
Whether valid collaboration agreement for technology transfer / license to design, manufacture, test and supply 110KV Gas Insulated Switchgear (GIS)/ Hybrid GIS /MTS equipment in India has been enclosed with bid ? (in line with para 1.3(b)(iii) of Annexure-A (BDS)
Details of documents uploaded in support of the above stated experience
Format-D: (Route-4)
Format in support of meeting the requirement of para 1.4(Route-4) (as applicable) Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Bidder’s Name :
1 Name of Contract Undertaken
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm
4(a)(i) Voltage Level of GIS Substation commissioned under the Contract (Indicate 110KV or above class only)
No. of GIS Circuit Breaker equipped bays under the above contract (Indicate nos. of Gas Insulated Switchgear (GIS) Circuit Breaker equipped bays of 110KV or above voltage level, where circuit breaker bay shall be considered as a bay used for controlling a line or a transformer or a reactor or a bus section or a bus coupler and comprising of at least one circuit breaker, one disconnector and three nos. of single phase CTs/Bushing CTs. GIS means SF6 Gas insulated Switchgear.)
Name of the New substation or switchyard
Scope of work involved under the Contract (Tick whichever is/are applicable)
No. of years, the above GIS Circuit Breaker equipped bays have been in operation as on the originally scheduled date of bid opening.
Details of documents uploaded in support of the above stated experience
Name of the Proposed Indian GIS Manufacturer (as per the Route-4 of Annexure-A(BDS)
Whether above Indian GIS Manufacturer meets the requirement mentioned at Route-1 or Route-2 or Route-3 above. (If Yes, Please mentioned the details in the Format-A/Format-B/Format-C above)
Whether Undertaking (Jointly with the GIS Manufacturer) (as per enclosed format in Section-VI, Vol-I of bidding document) for above is enclosed with the bid
Details of documents uploaded in support of the above stated experience
2.0 FINANCIAL REQUIREMENTS :
Financial Position {Reference para 2.0 of Annexure-A (BDS)} For the purpose of this particular bid, bidders shall meet the following minimum criteria:
a) Net Worth for last 3 financial years should be positive
b) Minimum Average Annual Turnover^(MAAT) of the bidder for best three years i.e. 36 months out of last five financial years of the bidder should be Rs. 954.78 Lakh.
^Note- “Annual gross revenue from operations/gross operating income as incorporated in the profit & loss account excluding other operative income / other income”.
For Bidders to qualify for more than one package, their financial position shall not be less than the sum of the requirement for the packages they propose to qualify for ( strike through if only one package)
c) Bidder shall have Liquid Assets (LA) and/or evidence of access to or availability of credit facilities of not less than Rs. 159.13 Lakh.
Note: (i) In case bidder is a holding company, the Financial Position criteria referred to in para 2.0 above shall be that of holding company only (i.e. excluding its subsidiary / group companies). In case bidder is a subsidiary of a holding company, the Financial Position criteria referred to in para 2.0 above shall be that of subsidiary company only (i.e. excluding its holding company). (ii) In case bidder has established manufacturing facility in India and yet to complete three (3) financial years, the Net Worth and average of the turnover as per financial statement for completed financial years shall be considered for the purpose of compliance to the specified Net Worth and MAAT requirements. (iii) In case of bidder qualifying through Route-3 but not meeting the Financial Position requirement as per note (i) read along with note (ii) above, the following shall be applicable: In case bidder is yet to complete five (5) years from the date of commercial production of such equipment(s) as on the originally scheduled date of bid opening as above, the financial position requirement as per para 2.0 (b) & (c) of parent/principal company providing collaboration for technological support shall be considered. However, once he completes five (5) years from the date of commercial production of such equipment (s) in India as on the originally scheduled date of bid opening as above, the financial position requirements as specified at 2.0 (b) and (c) above shall also be required to be met by such bidder on their own as per note (i) above and not based on their parent/principal company. Further, in case the bidder is yet to complete one (1) financial year, the Net worth requirement as per para 2.0 (a) above of parent/principal shall be considered. (iv) Relaxation for Start-Ups^/ MSEs Start-Ups^/ MSEs, meeting the specified requirements at Para 2.0 (a) above in Financial Position shall also be considered qualified if they meet Eighty (80) % of the requirement specified at Para 2.0 (b) & 2.0 (c) above in Financial Position. (v) ^ Start-Ups as defined by DIPP, applicable as on the originally scheduled date of bid opening.
{In support of its ‘Financial Position’, in line with the above, the Bidder (in case of bidding by single firm ) or each of the Partners of a Joint Venture (in case of bidding by a Joint Venture) or Company/Constituents must provide the relevant information in support of the same, along with documentary evidence, in the following format}
2.1 Financial Qualification Data: 2 or more
Name of the Bidder
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2020-21 No
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Lakh)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Name of Other Partner-1 of JV
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
C Liquid Assets
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Name of Other Partner-2 of JV
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Lakh)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Do you have audited results for FY 2020-21
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Lakh)
Sl No Financial year
Do you have audited results for FY 2020-21
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Lakh)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
3.0 Joint Venture (JV) Firms {Reference para 3.0 of Annexure-A (BDS)}
a) In case a bid is submitted by a Joint Venture (JV) of two or more firms as partners, all the partners of Joint Venture shall meet collectively the complete requirements stipulated at para 1.0 and 2.0 (b) & (c) above. Further, the partner(s) of JV must also meet the following minimum criteria: i. All the partners of the JV shall meet individually the Financial Position criteria given at 2.0 (a) above. ii. The Lead Partner shall meet, not less than 40% of the minimum Financial Position criteria given at para 2.0 (b) & (c) iii. Each of the other partner(s) individually shall meet not less than 25% of the minimum Financial Position criteria given at para 2.0 (b) & (c) above The figure of average annual turnover and liquid assets/credit facilities for each of the partners of the JV shall be added together to determine the JV’s compliance with the minimum qualifying criteria set out in Para 2.0 (b) & (c) above.
b) However, for a JV to be qualified, the partners of JV must also meet the following minimum criteria: i. One of the partner(s) of JV must meet the Technical Experience criteria and the requirements stipulated under Route-1 or Route-2 or Route-3 as per para 1.0 above ii. The remaining partner(s) of JV must have erected, tested and commissioned at least two (2) nos. GIS/AIS Circuit Breaker equipped bays@ of 110KV or above voltage level in one (1) substation or switchyard during the last seven (7) years in India and these bays@ must be in satisfactory operation# as on the originally scheduled date of bid opening mentioned above. Note : (#) Satisfactory operation means certificate issued by the Employer certifying the operation without any adverse remark.
In case of Joint venture, the following conditions shall also apply:
(a) the bid, and in case of successful bid, the specified Form of Agreement shall be signed so as to be legally binding on all partners (as per enclosed format in Section-VI, Vol.-I of bidding document).
(b) one of the partners shall be nominated as Lead Partner, and the Lead Partner shall be authorized to incur liabilities and receive instructions for and on behalf of any and all partners of the Joint Venture, and the entire execution of the Contract shall be done with the Lead Partner and payment under the contract shall be received by the Lead Partner on behalf of the Joint Venture as per power conferred to him in the Power of Attorney. The authorization shall be evidenced by submitting a Power of Attorney signed by legally authorized signatory of all the partners as per Performa in in Section-VI, Vol.-I of bidding documents. The payment under the Contract can also be received by other partner(s) based on authorization of Lead Partner.
(c) All partners of the joint venture shall be liable jointly and severally for the execution of the Contract in accordance with the Contract terms and a statement to this effect shall be included in the authorisation mentioned under (b) above as well as in the Bid Form and in the Contract Form (in case of a successful bid);
(d) Agreement entered into by the Joint Venture partners shall be submitted with the bid.
4 The bidder shall furnish documentary evidence in support of the qualifying requirement stipulated as above
4.1 In accordance with the above, in case of JV bidders, it should be ensured that necessary details including those pertaining to each JV partner are furnished and the documents are submitted alongwith the bid. Further, the JV bidders should also ensure that other requirements are complied with. The lists of documents furnished are to be indicated below :
A For Name of the Bidder
B For Name of Other Partner-1 of JV
C For Name of Other Partner-2 of JV
Audited balance sheet and income statements for the last five years as per the following:
For Name of Other Partner-1 of JV For Name of Other Partner-2 of JV
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed
1st Year Yes Yes
2nd Year Yes Yes
3rd Year Yes Yes
4th Year Yes Yes
5th Year Yes Yes
Date : Printed Name :
Place : Designation :
Name of Package : Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Package No : RFx: 5002002307
Specification No. : NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924
Completion Period 9 Months
: Attachments : General guidelines for filling up the Attachments : TW01RFx: 5002002307 :
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Specification No.: NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR), Attach QR, 4, 4(A), 4(B), 5, 6, 7, 9, 10, 11, 12, 13, 15, 16, 17 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as perproforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] No 0
Specify type of Bidder [Select from drop down menu] 1
Name of Lead Partner
Address of Lead Partner
Other Partner …… ……. …….. …… ……. ……..
Address of other Partner …… ……. …….. …… ……. ……..
Name of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-3(JV) 0 RFx: 5002002307
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services & …… ……. …….. …… ……. ……..
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 9
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-3(QR)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Qualifying Requirement Data)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
For our Qualifying Requirements Data, please refer Schedule-QR of this volume.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-4
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-4(A)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-4(B)
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-5
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 ATTACHMENT-5A
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. 2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-6
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-7
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Details of Alternative Bid)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-9
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Work Completion Schedule)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1. for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in weeks from the effective date of contract
1 Finalization of L2 Network
2 Site Mobilization
3 Source approval, store constrction, statuary complianc such as Labour license, WCP, EAR policy etc.
4 Approval of Vendors
5 Engineering Activities
6 Supply of Items at site (Including vendor finalization, Inspection, testing, delivery at site)
7 Erection activities including civil works
8 Commissioning
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-10
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Guarantee Declaration)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that the equipments offered shall have minimum (or a muximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-11
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-11
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Other Partner Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-11
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-12
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Price Adjustment Data)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the subject package. The necessary documentary evidence is enclosed.
Sl. No. Name of Materials/Labour Value of co-efficient Name of the published index Value of index as on thirty (30) days prior to date of opening in line with Appendix-2, Section-VI, Volume-I
A) For Ex-Works Price Component of AIS Equipment
I Capacitive VoltageTransformer
a) Raw Material
b) Labour l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
a) Raw Material
b) Labour I= l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
III Surge Arrester
a) Raw Material
b) Labour I= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
III PVC/XLPE Insulated Power and Control Cable
a) a=PVC Compound 0.15
b) Published Price of Metal IEEMA
i) Aluminium per MT IEEMA
ii) Copper per MT IEEMA
c) Weight in MT of Metal per kM (Size wise)
IV Sub Station Structures (including Bolts & Nuts)
i) Lattice Steel Structures & Pipe Structures (including bolts & nuts, washers & foundation bolts)
a) Raw Materials
i) a=Structural steel a= 0.58 JPC Market Price (Retail) for average Price of Steel Angles of size 50 x 50 x 6 mm of all cities in Rs./MT as published by Joint Plant Committee(JPC).
ii) b=Electrolytic Zinc b= 0.16 IEEMA
b) Labour l= 0.11 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
VIII. Series Reactor [ 420 kV, 12 ohm, 2500A, 1-ph air core dry type Series Reactor]
a) Raw Material Copper(a)
i) Aluminium(a) Aluminium(a)
b) Labour I= 0.85 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The value of coefficient for raw materials: a=0.65 to 0.73 and value of coefficient for labour shall be between 0.12 and 0.20, so that sum of all the coefficients including labour shall be a+l=0.85
B. For Installation (including Civil Works) Price Component
I Installation price component (including Civil works but excluding ‘supply & placement of reinforcement steel’ and ‘concreting’)
i) Labour I= l= 0.80 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
II Supply & Placement of Reinforcement Steel
i) HSD a= 0.10 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= l= 0.05 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
iii) Manufacture of Basic Metals b= 0.65 Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
III For Concereting
i) HSD a= 0.20 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= l= 0.10 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
iii) Manufacture of cement, lime and plaster b= 0.30 Wholesale Price Index Number for `Manufacture of cement, lime and plaster’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in)
iv) Cutting, shaping and finishing of stone c= 0.20 Wholesale Price Index Number for `Cutting, shaping and finishing of stone’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-13
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-14
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Integrity Pact is annexed herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-15
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) No 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No) No
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-16
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Additional Information)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of Bidder (Lead Partner)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 OTHER INFORMATION
3.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
3.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-17
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-17
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-17
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-18
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-18
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Attachment-19
Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1.
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5*. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
S N FY Value of Total Sales (including Taxes and Duties)(T)
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
S N Value of Balance Works (B1) against the Contracts awarded by Employer Value of Balance Works (B2) against the Contracts awarded by Utilities other than Employer Total value of Balance Works (B){B=B1+B2}
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is 15th June 2016, the Balance bid capacity as on 01st April 2016 is to be declared)] *(Applicable only in case of package for which the stipulated Qualification Requirements in respect of Technical experience pertains primarily to erection, testing and commissioning/civil works viz. transmission Line tower packages/Substation package/civil works package etc.)
6***. Our/Our proposed manufacturer’s annual manufacturing capacity as certified by a Chartered Engineer or similar Professional/ Professional body/Govt Agencies is:
MT/annum (for tower/tower parts)
[Certificate from Chartered Engineer or similar Professional/ Professional body/Govt Agencies in the country of the bidder/proposed manufacturer is to be enclosed along with this Attachment. Annual manufacturing capacity of all the manufacturers to be furnished separately] ***(Applicable only in case of Tower packages with scope for tower supply)
7. Notwithstanding above, we also understand that the Bid Capacity/Manufacturing Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Date : Printed Name :
Place : Designation :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Before filling up the Bid Form, the Bidder is required to fill up the details as under :
1 Tick whichever is applicable:
Indicate the name of Associate here, if applicable. 1 USD
1 Enter Details of Amendments: INR
Amendments to Bidding Documents issued:
2 Bid Security Bank Guarantee
3 Currency INR Amount
4 Validity in months
NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Bid Form 1 st 1 January 1 one
2 nd 2 February 2 two
BID FORM 3 rd 3 March 3 three
4 th 4 April 4 four
Bid Proposal Ref. No. 5 th 5 May 5 five
Date : 0-Jan-00 7 th 0 6 June 7 seven
8 th 1 7 July 8 eight
To: 9 th January 8 August 9 nine
Contracts & Materials Deptt 10 th 1900 9 September 10 ten
Power Grid Corporation of India Ltd., 11 th 10 October 11 eleven
3rd Floor 12 th 11 November 12 twelve
12 Rana Pratap Marg 13 th 12 December 13 thirteen
Lucknow-226001 (UP) 14 th Zero 14 fourteen
15 th () 15 fifteen
Name of Contract : Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1. the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently).0 16 th 16 sixteen
Dear Ladies and/or Gentlemen, 17 th 17 seventeen
Having examined the Bidding Documents, including Amendment Nos. dated 00/01/1900, the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). the receipt of which is hereby acknowledged, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 0 18 th 18 eighteen
We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2.
Our Bid, as said above have been submitted as per the followings: 19 th 19 nineteen
A Attachments to the Bid Form (First Envelope) 20 th 20 twenty
1.1 In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments to the Bid Form : 21 st
(a) Attachment 1: Bid Security,in separate envelope, in the form of Bank Draft/Pay Order/Bank's certified cheque/ Bank Guarantee, OR, Online Payment Acknowledgment towards Bid Security OR, documentary evidence in support of exemption of Bid Security in accordance with clause 13.1 of ITB, Section-II, Vol-I of Bidding Document Bank Draft 22 th
(b) Attachment 2: A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Pay Order 23 th
(c) Attachment 3: The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3(c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents [Attachment – 3(QR)]. Banks certified Cheque 24 th
(d) Attachment 4: The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facility offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4 . Moreover, a list of Special Tools & Tackles to be furnished by us, the cost of which is included in our Bid Price, is also enclosed as per your format as Attachment- 4A. 25 th
(e) Attachment 5: The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 6: The variation and deviations from the requirements of the Conditions of Contract, Bid Data Sheet and other commercial conditions, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter-alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(g) Attachment 7: The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. [NOT APPLICABLE] 28 th
(h) Attachment 8: Manufacturer’s Authorisation Forms 29 th
(i) Attachment 9: Work Completion Schedule
(j) Attachment 11: Information regarding ex-employees of Employer in our firm
(k) Attachment 12: Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents
(l) Attachment 13: Declaration regarding Social Accountability
(m) Attachment 14: Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(n) Attachment 15: Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises.
(o) Attachment 16: Additional information
(p) Attachment 17: Declaration for tax exemptions, reductions, allowances or benefits
(q) Attachment 18: Safety Pact
(r) Attachment 19: Declaration regarding Price bid.
(s) Attachment 20: Declaration of Key Managerial Person and Power of Attorney holder
(t) Attachment 21: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order and MoP Order, if applicable
(u) Attachment 22: Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1 (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture)
(v) Attachment 23: Certification by the Bidder per DoE Order in line with ITB Clause 2.1
(vi) Attachment 24: Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
(vii) Attachment 25: Confirmation in regard to Type Test (to be furnished in case bidder is proposing to qualify through Note-4 under Route-1 of QR).
(viii) Attachment 26: Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron & Steel Products
(ix) Attachment 27: Affidavit of Self certification regarding Domestic Value Addition in Iron & Steel Products (submission of Hard Copy in ‘Original’)
1.2 [*Applicable only in case of MSE bidders].We are a Micro and Small Enterprise (MSE) registered with , a Designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01.06.2020 read in conjunction with related notification issued from time to time for such enterprises
1.3 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
B. Second Envelope
1.1 In continuation of First Envelope of our Bid, we have submited the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to Supply (including Packing & Forwarding), Transit Insurance, Transportation, Unloading, Delivery on F.O.R destination basis, Installation, Testing & Commissioning of the Facilities under the above-named package in full conformity with the said Bidding Documents for the sum specified in our Second Envelope Bid, in accordance with the terms & conditions of the Bidding Documents. We hereby confirm that the total amout of our bid is in accordance with the prices quoted by us under different Heads, as detailed below:
i. Ex-works Price of Plant and Equipment (including mandatory Spares) to be supplied;
ii. Local Transportation, In-transit Insurance and Loading & Unloading for supply of Plant & Equipment;
iii. Installation Charges (including civil works);
iv. Taxes and Duties amount
1.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
3.2 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
D. Construction of the Contract
5.1* We declare that we have studied GCC Sub-Clause 2.1 relating to mode of contracting for Foreign Bidders and we are making this proposal with a stipulation that you shall award us three separate Contracts viz ‘First Contract’ for all works to be performed in countries outside India covering, inter-alia, the Off-Shore Supply of equipment & materials including mandatory spares (CIF Supply), testing to be conducted aborad and training to be imparted abroad; ‘Second Contract’ for Supply of equipment & materials including mandatory spares (Ex-works Supply) and testing to be conducted within India; and ‘Third Contract’ for providing all services i.e. port handling and custom clearance of the imported goods; further loading and inland transportation for delivery at site, unloading, storage, handling at site, installation, testing and commissioning including Trial Operation in respect of all equipment & materials supplied under both ‘First Contract’ and ‘Second Contract’ and any other services specified in the Bidding Documents.
We declare that the award of three contracts, will not, in any way, dilute our responsibility for successful operation of Plant/Equipment and fulfillment of all obligations as per Bidding Documents and that all the three Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the remaining contracts which will confer on you the right to terminate the other contracts at our risk and cost and/or recover damages under any or all the Contracts.
# Further, M/s. Indicate the name of Associate here, if applicable., whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts. , whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts.
The above-mentioned proposed Associate(s) shall directly enter into the ‘Second Contract’ and/ or ‘Third Contract’ with you and all the three contracts shall contain the aforesaid cross-fall breach clause. It is expressly understood that in case of breach of the Second and/or Third Contract by the Associate(s), we shall be liable for all the consequences of breach thereof notwithstanding that the Contract is awarded to the Associate(s). In case the Associate(s), despite his written consent fails to enter into the ‘Second Contract’ and/or ‘Third Contract’ with you, or if the Employer in his judgment does not find acceptance of the proposed Associate(s) as its Contractor, then we undertake to enter into and execute all the Contracts, inter alia, containing the aforesaid cross-fall breach clause. In such an event, the over-all financial liability of the Employer, under the Contract shall, however, not exceed that envisaged in our this bid. (# Applicable only in case assignment is permitted by the Employer.)
1.0 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, In-transit insurance, unloading, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents.
We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
2.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c ) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e ) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
3.0 We undertake, if our bid is accepted, to commence the work on Facilities immediately upon your Notification of Award to us, and to achieve Completion within the time stated in the Bidding Documents.
4.0 If our bid is accepted, we undertake to provide a Performance Security(ies) in the form and amounts, and within the times specified in the Bidding Documents.
5.0 We agree to abide by this bid for a period of 180 (one hundred and eighty) days after the date of opening of Techno - Commercial Part i.e. First Envelope as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
6.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
7.0 We understand that you are not bound to accept the lowest or any bid you may receive.
*12.0 (for Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
8.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain
Yours faithfully,
For and on behalf of : 1
Date : 00 January 1900 Printed Name: 0
Place : Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
(State/Province to be indicated)
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for:
(a) Attachment 2: Power of Attorney.
(b) Attachment 7: The details of Alternative Bid
(For Attachments 2 and 7, Bidders may use their own proforma for furnishing the required information with the bid).
Specification No. :NR3/NT/W-AIS/DOM/K00/23/08177 , RFx: 5002002924 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract Services 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
"Saudamini", Plot No. 2, Sector 29 11 eleven 11 th 11 November
Gurgaon (Haryana) - 122001 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Package -A for Extension of 765 kV Orai Sub-station (Shifting & conversion of 765 kV fixed line reactor to bus reactor) under Western Region Expansion Scheme-XXXIII; Part C1. 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
Or Online Payment Acknowledgement towards Bid Security for a sum of ................................................ (name of currency and amount in words and figures)
Or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II Please note that if bid validity is less than 250(Two Hundred and Fifty) days from the date set for opening of bids, your bid may be rejected
(b) Attachment 2(RFx: 5002002307) : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3(RFx: 5002002307) : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). 0 Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 1 Not Applicable 24 th
(d) Attachment 4(RFx: 5002002307) : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5(RFx: 5002002307) : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A(RFx: 5002002307) : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6(RFx: 5002002307) : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7(RFx: 5002002307) : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8(RFx: 5002002307) : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9(RFx: 5002002307) : Work Completion Schedule. 31 st
(k) Attachment 10(RFx: 5002002307) : Guarantee Declaration.
(l) Attachment 11(RFx: 5002002307) : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12(RFx: 5002002307) : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13(RFx: 5002002307) : Declaration regarding Social Accountability.
(o) Attachment 14(RFx: 5002002307) : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15(RFx: 5002002307) : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16(RFx: 5002002307) : Additional Information.
(r) Attachment 17(RFx: 5002002307) : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18(RFx: 5002002307) : Safety Pact
(t) Attachment 19 (RFx: 5002002307) : Declaration.
(u) Attachment 20 (RFx: 5002002307) : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 (RFx: 5002002307) : Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron &Steel Products
(w) Attachment 22 (RFx: 5002002307) : Self Certification regarding Domestic Value Addition in Iron & Steel Products
(x) Attachment 23 (RFx: 5002002307) : Self certification regarding Minimum Local Content in line with PPP-MII order, 2017 if applicable
(y) Attachment 24 (RFx: 5002002307) : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
(y) Attachment 25 (RFx: 5002002307) : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c) GCC 5.7 Contractors Responsibility
(d) GCC 8 Terms of Payment
(e) GCC 9.3 Performance Security
(f) GCC 10 Taxes and Duties
(g) GCC 21.2 Completion Time Guarantee
(h) GCC 22 Defect Liability
(i) GCC 23 Functional Guarantee
(j) GCC 25 Patent Indemnity
(k) GCC 26 Limitation of Liability
(l) GCC 38 Settlement of Disputes
(m) GCC 39 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and address of agent Amount and Currency Purpose of Commission or gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(RFx: 5002002307) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(RFx: 5002002307) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
1 CRB plinth area assumed as 750 sqm, as per input by Engg-S/s.
2 As per input by Engg-S/s, the fault level of the 400 kV tower/ equipment is 63 kA and that for 220 kV tower/ equipment is 40 kA.
3 As intimated by Engg-S/s, WT equipment shall be mounted in two phases, however foundation shall be cast for all three phases, hence for 3 circuit, a total of 3×3 = 9 foundations shall be cast.
4 As per discusison with Engg-S/s, for SF6/ Air bushing, scope of support structure is combined with that of GIS, hence no separate structural quantity is considered for it's support structure.
5 As per input by Engg-S/s, LM Iis of 50 m height.
6 For SF6/ Air bushing, foundation quantities are taken same as that of respective level LA support structure.
7 As per discussion with Engg-S/s, for 400 kV busduct support structure, it is assumed that, three bus ducts are mounted one support strucutre, running lenth of these support structures is provided in the input.
8 Plot area considered is 1,97,537 sqm (data from site selection committee) and area to be levelled as 1,50,000 sqm (input by Enggg-S/s).
9 Earthwork for cutting and filling has been taken as: (1/2 of levelling area) × 0.5m = 75,000×0.5 = 37,500 cum.
10 Supply of earth has been taken as: (1/2 of levelling area) × 1.0m = 75,000 × 1.0 = 75,000 cum.
11 No road with paver block is considered, not even for road between main gate and CRB. All roads considered in the S/s are concrete roads. The roads in switchyard shall have PCC shoulder.
12 1000 m road is given as input, 2,000m of drain considered. 60% (A-A), 15% (B-B), 15% (C-C), 10% (D-D)
13 An approach road (concrete, 5.5 m wide), 800 m long from highway to S/s main gate is considered; input-based on site selection committee's visit. No PCC shoulder and drains considered for this road.
14 As such no quantities for diversion of an existing throughfare (crossing our plot) is considered.
15 As such no separate foudnation quantities for CMB for Transformer & Reactor is assumed.
16 As such no quantities/ line item is considered for 'buried cable trenches for auxiliary power arrangement'
17 2 nos of Rain Water Harvesting unit is considered.
18 RCC hume pipes NP-3 (250/300/450 mm) have been considered for crossings of cable trench & road. No of crossings considered are 1no./50 running meter of trench, except for Sec4-4.
19 Rampur lies in UP, basic wind speed: 47 m/s (IS 875: Part 3), basic wind speed: 50 m/s (NBC 2016)
20 Structure quantities for tower, equipment, RCC & reinforcement steel quantities have been calculated on the basis of standard drawings based on 47 m/s as basic wind speed (COST PLUS model). Further as a general pracice, these quantities are reduced by 15% to fit into the TBCB model. However the location of the S/s lies in 50 m/s basic wind speed zone as per NBC 2016, hence this 15% reduction in quantities is not considered in this BOQ.
21 Scope of diversion of an existing nallah (which crosses our plot), shall be deemed to be inclued in the levelling works itself. The same needs to be incorporated in the Section-Project.
22 Total quantitiy calcultated for lattice structure has been split into 90% (MS) & 10% (HT). This is done to keep the scope for optimization in steel structures open.
23 PCC (1:4:8) has been assumed under Water Tank for FFPH instead of PCC (1:3:6).
24 1 no of 5 HP dewatering pump is considered for cable trench sump pit and 2 nos of dewatering pump for 400/20 kV Transformers
25 No separate structure quantities for 1 no of double pole structue considered. Lattice (MS) structure qunatity can take care of it.
26 Section-Project: The scope of work shall include but shall not be limited to the following based on Contractor supplied drawings
i Foundations for 400 kV & 220 kV bus duct supporting structures and 400 kV and 220 kV GIS bushing (SF6/Air bushing).
ii All civil works including foundations associated with erection of SF6 gas insulated metal enclosed switchgear along with its SF6 ducts.
iii Foundation for lighting poles/panels, bay marshalling boxes, Control cubicles etc.
iv Preparation of storm water drainage layout using POWERGRID standard sections.
v Stone spreading and anti weed treatment including PCC in the switchyard. A layout for the same shall be develeoped by the contractor.
vi Structure and foundation of all equipment and towers for all voltage level.
vii Foundation along with road cum rail tracks, jacking pads unloading platforms, pulling blocks, Gratings, oil pit, firewalls etc. for 02 units of 400/220kV, 3-Phase Transformers.
viii Cable trenches including cable trenches in Transformer area along with covers including road/rail crossing, sump pits, culverts etc. The cable trench layout including invert levels shall be developed by the contractor.
ix All roads as per the layout. Road layout shall be developed by the contractor.
x Fire Fighting Pump House (FFPH) and Water Tank, Control Room Building (CRB), 400 kV GIS Hall, 220 kV GIS Hall, Transit Camp cum Field Hostel as per specification, complete in all respect. Reference concept drawings for FFPH, Water tank, CRB, Tranit Camp cum Field Hostel shall be made available in the tender documents.
xi The roofing of the AHU Room and Panel Rooms (along with bith the GIS Halls) shall be of puff sandwhich panels same as that for GIS Halls.
xii For RCC frame structure buildings and Pre-engineered buildings, the complete civil works including internal and external finishing, stone soling for flooring, plinth protection, drain along plinth protection, electrical conduit and junction boxes, fan boxes, cable transit system etc. required to complete the building in all respect as per the draing shall be payable in the plinth area rate. However teh quantity of the earthowrk (excavation, backfilling, disposal etc.), concrete (all types), reinforcement steel shall be measured and paid under respective items under BPS.
xiii PEB closed store for GIS spares as per specification, complete in all respect. Reference concept drawings for the same shall be made available in the tender documents.
xiv Permanent water supply for control room cum administrative building, Fire fighting pump house building, fire fighting system and transit system.
xv Laying of plumbing and external sewerage system for control room builing, transit camp and security hut.
xvi Foundation for Auxiliary LT transformers & DG set.
xvii Septic tank and Soak pit for control room building (20 no of users), transit camp (20 no of users).
xviii Soil investigation and measurement of earth resistivity as per technical specifications.
xiv Contouring and leveling of the plot and the area for approach road including supply of borrowed earth and filling if any. Proposal of FGL (Finished Ground level) for finalization by the employer based on HFL data etc.
27 Section-Project: The scope of work shall include but shall not be limited to the following based on Owner supplied drawings
i Construction of boundary wall, main gate and security hut as per specification and drawings, including septic tank and soak pit for security hut (05 no of users).
ii Switchyard fencing and switychyard gate.
iii Switchyard cable trench sections.
iv Roads sections.
v Approach road section.
vi Drain sections.
vii Rain water harvesting drawings.
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
SAP Material No Sl. No. Item Description Unit Quantity
SAP Activity No
1000012040 1 HVW Spray system, Hydrent system and complete U/G and O/G piping and accessories etc. outside the pumphouse for 110 MVAR 765KV/ ᷇3 single phase Bus Reactor Nos. 3.0
1000011349 2 ERECTION H/W-765KV BUS REACTOR BAY SET 1.0
1000012373 3 Foundation bolts including nuts, checknuts and washer for lattice/pipe structures MT 2.3
1000030433 4 Color IP Camera With pan, Tilt and Zoom facilities along with all required items, accessories line interface units and fiber cable etc. and including integration in existing Hardware and software for augumention of visual monitoring system SET 1.0
1000014535 5 Lighting fixture type-SF1 as per Technical Specification EA 4.0
1000014536 6 Lighting fixture type-SF2 as per Technical specification EA 4.0
1000014547 7 Lightening Panel Type -ACP-2 as per Technical Specification EA 2.0
1000014548 8 Lightening Panel Type -ACP-3 as per Technical Specification EA 1.0
1000020262 9 Sub-Lighting Panel (Outdoor)type SLP switchyard and street lighting EA 2.0
1000004302 10 40 MM MS ROD FOR MAIN EARTH MAT M 100.0
Note: OWNER SUPPLIED MATERIAL
1000005791 1 765KV, 1PH BUS POST INSULATOR (BPI) EA 3
1000031964 2 1.1KV 3CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000031987 3 1.1KV 5CX2.5SQMM PVC CONTROL CABLE(KM) KM 2
1000031993 4 1.1KV 7CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000031887 5 1.1KV 10CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000031904 6 1.1KV 14CX2.5SQMM PVC CONTROL CABLE(KM) KM 1
1000032049 7 4 PAIR, 0.5 SQMM SCREENED CABLE(KM) KM 1
1000031957 8 1.1KV 3.5CX70SQMM PVC POWER CABLE(KM) KM 0
1000031943 9 1.1KV 2CX6SQMM PVC POWER CABLE(KM) KM 0
1000031985 10 1.1KV 4CX6SQMM PVC POWER CABLE(KM) KM 2
1000056264 11 1.1KV 19CX1.5SQMM PVC CONTROL CABLE(KM) KM 1
1000056265 12 1.1KV 27CX1.5SQMM PVC CONTROL CABLE(KM) KM 1
1000015954 13 Fabrication, supply and galvanising of Lattice structures (MS Steel) MT 15.3 MT
1000011713 14 Fabrication, supply and galvanising of Fasteners, Nuts, Bolts and Washers includes 3 nos. 765 kV BPI & 1 no. LM
1000015927 3 NEUTRAL FORM-110MVAR 765KV REACTOR 1BANK LOT 0.0 Existing Line reactor Neutral Bus will be reused
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
(Installation Part)
SAP Activity No Sl. No. Item Description Unit Quantity
SAP Activity No
100002911 1 Excavation in all kind of soil including rock for all leads and lifts, backfilling, disposal of surplus earth within a lead up to2Km as per technical specification. The surplus earth shall be roughly graded . M3 1,999.10
100001325 2 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) M3 103.87
100001326 3 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) M3 6.04
100001327 4 Providing and laying of Reinforced Cement Concrete M25 mix including pre cast, shuttering, Grouting of pockets & underpinning but excluding steel reinforcement. M3 656.57
100001329 5 STEEL REINFORCEMENT MT 52.53
100001331 6 Misc. Structural steel including rails, embedments, edge protection angles, gratings etc. but excluding the reinforcement MT 19.88
100003692 7 STONE FILLING (40MM) M3 42.00
100001458 8 Construction of rail cum road as per drawing including all item such as excavation,compactions, rolling watering, WBM etc. but excluding concrete reinforcement and structural steel-Section having two rails for Reactor. Sq.m. 189.00
100001328 9 PLAIN CEMENT CONCRETE (PCC-1:5:10) M3 50.63
100001714 10 STONE SPREADING IN SWITCHYARD EXCLUDING PCC Sq. m. 675.00
100001713 11 ANTIWEED TREATMENT Sq.m. 675.00
100001412 12 DRAIN SECTION A-A RM 15.00
100001413 13 DRAIN SECTION B-B RM 15.00
130000761 14 14.4.2 Providing, laying and fixing following dia RCC pipe NP2 class (light duty) in ground complete with RCC collars, jointingwith cement mortar 1:2 (1 cement : 2 fine sand) including trenching (75 cm deep) and refilling etc as required. : 150 mm dia RM 30.00
130000762 15 14.4.3 Providing, laying and fixing following dia RCC pipe NP2 class (light duty) in ground complete with RCC collars, jointingwith cement mortar 1:2 (1 cement : 2 fine sand) including trenching (75 cm deep) and refilling etc as required. : 250 mm dia RM 394.00
100003114 16 External finishing / painting of fire wall (water proofing cement paint) (DSR 13.44.1) Sq.m. 478.08
100007701 17 Supplying and erecting dewatering pumps- 2 HP Nos. 3.00
100001454 18 DEMOLISHING RCC WORK INCLUDING STACKING OF STEEL BAR SAND DISPOSAL OF UNSERVICEABLE MATERIAL M3 10.00
100001542 19 DISMANTLING AND RE-ERCTION OF EXISITNG FENCE RM 15.00
100001442 20 DISMANTLING OF EXISITNG BRICK DRAIN RM 50.00
100001712 21 Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm 50.00
100001712 22 Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC Sqm 50.00
100001735 23 RCC culverts and cable trench crossings including supplying and laying hume pipe 250mm dia of grade (NP-3) excluding concrete RM 10.00
A. TOTAL OF CIVIL WORKS (In Rs.)
B. Dismantling /Erection
- 24 Dismantling of Support structure MT 6.92
100001210 25 Erection of Lattice Structures (MS Steel), for towers, beams and equipment support structure including pack plates / packwashers and gusset plates excluding fasteners and foundation bolts MT 22.53
100001680 26 Erection of fasteners ( nuts, bolts and washers ) including step bolts for lattice and pipe structures to be designed during detailed engineering MT 0.76
100001681 27 Erection of foundation bolts including nuts, checknut and washers for lattice and pipe structures to be designed during detailed engineering MT 2.28
B. TOTAL OF Dismantling/Erection of Structure (In Rs.)
C. Electrical Erection works
100000183 28 ERECTION- SURGE ARRESTER,1-PH,624KV No 3.00
100000194 29 ERECTION-765kV BPI SET 6.00
100001008 30 HVW SPRAY SYSTEM, HYDRENT SYSTEM AND COMPLETE U/G AND O/G PIPING AND ACCESSORIES ETC. OUTSIDE THE PUMPHOUSE FOR 110 MVAR 765KV/ ᷇3 SINGLE PHASE BUS REACTOR No 1.00
100000724 31 765KV REACTOR PROTECTION PANEL-SAS Mandays 4.00
100002068 32 765KV S/S AUTOMATION SYSTEM-MAIN BAY-AUG Mandays 4.00
100016786 33 FIRE PROTECTION-765 KV 1PH REACTOR SET 3.00
100002181 34 1.1KV PVC POWER CABLE LS 1.00
100002182 35 1.1KV PVC CONTROL CABLE LS 1.00
100000186 36 ERECTION H/W-765KV BUS REACTOR BAY SET 1.00
100003034 37 4 PAIR, 0.5 SQMM SCREENED CABLE (KM) KM 0.50
100002500 38 Color IP Camera With pan, Tilt and Zoom facilities along with all required items, accessories line interface units and fiber cable etc. and including integration in existing Hardware and software for augumention of visual monitoring system SET 1.00
100001041 39 Lighting fixture type-SF1 as per Technical Specification EA 4.0
100001042 40 Lighting fixture type-SF2 as per Technical specification EA 4.0
1000001021 41 Lightening Panel Type -ACP-2 as per Technical Specification EA 2.0
1000001022 42 Lightening Panel Type -ACP-3 as per Technical Specification EA 1.0
1000001024 43 Sub-Lighting Panel (Outdoor)type SLP switchyard and street lighting EA 2.0
100001148 44 40 MM MS ROD FOR MAIN EARTH MAT M 100.0
C. TOTAL OF Electrical erection works (In Rs.)
(A+B+C) Total for Installation (In Rs.)
QTY. ESTIMATE FOR 400 kV BAY AT SUBSTATION
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10 F/W painting/ unit F/W painting PCC/UNIT PCC 1:3:6
A 765 kV Gantry
B 400 KV TOWERS 0 0
C 220 KV TOWERS 0 0
400 KV TOWERS (FIROZABAD) 0 0 0 0 0 0
220 KV TOWERS (FIROZABAD) 0 0 0 0 0 0
C.1 145 KV TOWERS 0 0
D 765 Kv EQUIPMENTS 0 0
E.1 400 KV EQUIPMENTS (63 kA fault level) 0 0
7 WT 3.744 0 0.588 0 22.62 0 157.404 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments 0 0
E.2 400 KV EQUIPMENTS (upto 50 kA fault level) 0 0
7 WT 3.12 0 0.49 0 18.85 0 131.17 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments 0 0
F 220 KV EQUIPMENTS 0 0
G 132 KV EQUIPMENTS 0 0
H Cable Trench 0 0
I Road with PCC Shoulder 0 0
J Road with Paver Block 0 0
Rail Cum Road 0 0
2 4 rail (already included in trf/rtr quant) 0 0
K TRANSFORMER 0 0
Common Oil Pit for 765 kV Reactor 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0 0 0
M rainwater harvesting 3.38 0 0 0 0 0 152 0 0 0 0 0 0 0 0 0
V PCC FOR RCC PIPE TO COMMON OIL PIT 50 0 0 0.25 12.5 0.3 15 0 0 0 0 0.12 6 0 0 0 0
X PCCFOR STONE SPREADING 675 50.625 0 0
CONTROL ROOM 750 AREA 900 0 40 0 750 0 63000 0 0 0
Insulator Guy Wire Arrangement 1.175 0 0.2 0 5.98 0 41.1 0 0 0
Outdoor Hybrid GIS (8m×5m×.75m plinth ht) 50 0 3.1 0 56.4 0 2000 0 0 0
Outdoor Hybrid GIS (8m×4m×.75m plinth ht) 40 0 2.5 0 46.9 0 1600 0 0 0
PEB Store_GIS Spare_400kV (15m×20m×6m) 260 0 60 0 840 0 21000 0
PEB Store_GIS Spare_765kV (15m×30m×6m) 350 0 75 0 1080 0 27000 0
quantity due to pile 627 0 82.00 0.00 1414 0 31000 0 0 0
BOQ cum Cost Estimate for Site Package A- Substation Extension (includes Civil, Erection, Testing, Commissioning excluding works for Reactor Shifting) "Under Extn. of 765 kV Orai S/s - Shifting & conversion of 765 kV Fixed Line Reactor to Bus Reactor at WRES XXXIII:Part C1"
in MT below 220 kV 220 kV 400 kV 765 kV Total Reduction by 0% Actual qty considered
below 220 kV Equipment
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
220kV TOWERS AND BEAMS
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
220kV EQUIPMENT SUPPORT STRUCTURES
400kV TOWERS AND BEAMS
Sl. No. Structure MS Structure Steel HT Structure Steel Fasteners Total excluding fateners No. of Foundation Bolts Dia. of Foundation Bolts (mm) unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. X unit wt excluding fdn bolt Fasteners MS foundation bolts
400kV EQUIPMENT SUPPORT STRUCTURES
765kV TOWERS AND BEAMS
Sl. No. Structure Structure Steel MS Structure Steel HT Fasteners No. of Bolts Dia of Bolts unit wt of fdn bolt Wt of Foundation Bolts Fill Nos. MS lattice total weight= nos. * unit wt MS pipe total weight= nos. * unit wt HT total weight= nos. * unit wt fasteners foundation bolts
765kV EQUIPMENT SUPPORT STRUCTURES 0 0
Note: 1 7CC portal has 2 nos of 7CC tower, 1 no of BE,1 no of BF, 1 no of GWCC.
Supply required for structures
Nos Unit weight total
Cable Breakup- Supply
SI. No. SAP Activity No Item Description Unit Qty Unit Rate Amount (Rs) Unit Rate Amount (Rs) Unit Rate Amount (Rs) Remarks/ Reference
Supply F&I Erection
K 1.1kV Grade Power & Control Cables alongwith clamps, lugs, glands, straight through joints etc.
K1 Power Cables
K2 Control cable
Cable Trench Crossing
NP-3 Hume Pipe Dia (mm) Wall Thk (mm)
QTY1 QTY2 250 30
Width of road (m) 3.75 Width of road (m) 3.75 Width of road (m) 5.5
Lenth of hume pipe to be taken (m) 6 Lenth of hume pipe to be taken (m) 6 Lenth of hume pipe to be taken (m) 7.5
Section 2-2 Crossing Road Section 2-2 Crossing Road Section 2-2 Crossing Road PCC (1:2:4) 0.225 m
No of xsings 0 No of xsings 0 No of xsings 0
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum 1.63 m
RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos Sec 2-2
RCC Hume Pipe 300 mm 1 Nos RCC Hume Pipe 300 mm 1 Nos RCC Hume Pipe 300 mm 1 Nos
RCC Hume Pipe 450 mm 1 Nos RCC Hume Pipe 450 mm 1 Nos RCC Hume Pipe 450 mm 1 Nos
Section 3-3 Crossing Road Section 3-3 Crossing Road Section 3-3 Crossing Road
No of xsings 0 No of xsings 0 No of xsings 0 PCC (1:2:4)
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum
RCC Hume Pipe 250 mm 2 Nos RCC Hume Pipe 250 mm 2 Nos RCC Hume Pipe 250 mm 2 Nos PCC (1:2:4)
RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos
RCC Hume Pipe 450 mm 0 Nos RCC Hume Pipe 450 mm 0 Nos RCC Hume Pipe 450 mm 0 Nos
Section 1-1 & 2A-2A Crossing Road Section 1-1 & 2A-2A Crossing Road Section 1-1 & 2A-2A Crossing Road
No of xsings 0 No of xsings 0 No of xsings 0
PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum PCC (1:4:8) 0 cum 2.7 m
RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos RCC Hume Pipe 250 mm 0 Nos
RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos RCC Hume Pipe 300 mm 0 Nos
RCC Hume Pipe 450 mm 4 Nos RCC Hume Pipe 450 mm 4 Nos RCC Hume Pipe 450 mm 4 Nos
Total PCC (1:2:4) 0 cum Total PCC (1:2:4) 0 cum Total PCC (1:2:4) 0 cum
Total PCC (1:4:8) 0 cum Total PCC (1:4:8) 0 cum Total PCC (1:4:8) 0 cum
RCC Hume Pipe 250 mm 0 RM RCC Hume Pipe 250 mm 0 RM RCC Hume Pipe 250 mm 0 RM PCC (1:2:4) 0.21875 m
RCC Hume Pipe 300 mm 0 RM RCC Hume Pipe 300 mm 0 RM RCC Hume Pipe 300 mm 0 RM
RCC Hume Pipe 450 mm 0 RM RCC Hume Pipe 450 mm 0 RM RCC Hume Pipe 450 mm 0 RM
Transit Camp- New Dwg no: C/ENGG/STD/TBCB/TCFH/ARCH/04
GROUND FLOOR 1 490.84 1 0.2 98
FIRST FLOOR 1 411.76 1 0.2 82
SECOND FLOOR 1 411.76 1 0.2 82
THIRD FLOOR 1 226.97 1 0.2 45
GROUND FLOOR-PLINTH 1 220 0.23 0.6 30
FIRST FLOOR 1 176 0.3 0.75 40
SECOND FLOOR 1 176 0.3 0.75 40
THIRD FLOOR 1 176 0.3 0.75 40
THIRD FLOOR ROOF 1 128 0.3 0.75 29
Foundation 46 3 0.6 0.6 50
GROUND FLOOR 46 3 0.6 0.6 50
FIRST FLOOR 46 3 0.6 0.6 50
SECOND FLOOR 46 3 0.6 0.6 50
THIRD FLOOR 46 3 0.6 0.6 50
Foundation pad 46 2.5 2.5 0.3 86
TOTAL CONCRETE 821
EXCAVATION 46 3 3 3 1242
STEEL 80000 say
0 YYYY 220/132 kV Bhatapara GSS
NOS OF TOWER TOTAL BOLTS nos of tower total bolts nos of tower total bolts
a) 765 kV Lattice Structure DIA NOS
b) 400 kV Lattice Structure 0
c) 220kV Lattice Structure 0
c.1) 145kV Lattice Structure
d) 765kV Equipment support structure
ISO(Set of six structures) 32 12 0.0 0 0 0 0 0
WT(set of three structures) 32 16 0.0 0 0 0 0 0
e) 400KvEquipment support structure (Pipe)
ISO(Set of six structures) 28 4 0.0 0 0 0 0 0
WT(set of three structures) 28 4 0.0 0 0 0 0 0
f) 220kV Equipment support structure (Pipe) 20MM DIA 24MM DIA 28MM DIA 32MM DIA 40MM DIA 56MM DIA 63MM DIA 80MM DIA
ISO(Set of six structures) 28 24 0.0 0 TOTAL 0 0 0 0
WT(set of three structures) 28 12 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) 132kV Equipment support structure (Pipe)
WT(set of three structures) 24 0.0 0 0 0 0 0
g) 72.5kV Equipment support structure (Pipe)
ISO ( SET OF 3 STRUCTURE ) 28 24 0.0 0 0 0 0 0
h) double pole str 28 12 0.0 0 0 0 0 0
i) 33 kV Equipment support structure (Lattice) 0 0 0
QTY. ESTIMATE FOR 765/400/220kV SUBSTATION AT YYYY
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10
A 765 kV Gantry
B 400 KV TOWERS
C 220 KV TOWERS
C.1 145 KV TOWERS
D 765 Kv EQUIPMENTS
E 400 KV EQUIPMENTS
7 WT 0 3.12 0 0.49 0 18.85 0 131.17 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments
F 220 KV EQUIPMENTS
G 132 KV EQUIPMENTS
I Road with PCC Shoulder
J Road with Paver Block
Common Oil Pit for 765 kV Trans. 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
Common Oil Pit for 765 kV Reactor 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
6 Fire wall for Reactor 765kV 0 45 0 2.4 0 80 0 4500 0 0 0 0 0 0 0
M rainwater harvesting 0 3.38 0 0 0 0 0 152 0 0 0 0 0 0 0
X PCCFOR STONE SPREADING 0 0
W Double Pole 0 12 0 2 0 52 0 800 0
CONTROL ROOM 750 AREA 0 900 0 40 0 300 0 63000 0
Z LT TRANSFORMER 0 7.5 0 0.4 0 16 0 95 0
QTY. ESTIMATE FOR 765/400/220kV SUBSTATION AT ZZZ
S. NO. ITEM NO. RCC/UNIT RCC PCC/UNIT PCC 1:4:8 EXC/UNIT EXCV. REIN/UNIT R/F MISC/UNIT MISC STEEL 1:2:4/UNIT PCC 1:2:4 STONE/UNIT Stone Filling LATICE/unit LATICE PCC 1:5:10
A 765 kV Gantry
B 400 KV TOWERS
C 220 KV TOWERS
D 765 Kv EQUIPMENTS
E 400 KV EQUIPMENTS
7 WT 0 3.12 0 0.49 0 18.85 0 131.17 0 0 0 0 0 0 0 always multiply 1.5 to nos of wt equpments
F 220 KV EQUIPMENTS
G 132 KV EQUIPMENTS
I Road with PCC Shoulder
J Road with Paver Block
Common Oil Pit for 765 kV Trans. 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
Common Oil Pit for 765 kV Reactor 0 105 0 9.5 0 535 0 10 0 0.5 0 35 0 0 0
6 Fire wall for Reactor 765kV 0 45 0 2.4 0 80 0 4500 0 0 0 0 0 0 0
M rainwater harvesting 0 3.38 0 0 0 0 0 152 0 0 0 0 0 0 0
X PCCFOR STONE SPREADING 0 0
W Double Pole 0 12 0 2 0 52 0 800 0
CONTROL ROOM 750 AREA 0 900 0 40 0 300 0 63000 0
Z LT TRANSFORMER 0 7.5 0 0.4 0 16 0 95 0
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
1-Attachment-8_First Envelope.docx
docx • 0.02 MB
10-Attachment-26_Authorization certificate issued by Domestic Manufacturer.docx
docx • 0.02 MB
11-Attachment-27_Affidavit for self-certification_Iron & Steel.DOCX
docx • 0.02 MB
12-(Mandatory) Attachment -3 (QR).xlsx
xlsx • 0.18 MB
13-(Mandatory) First Envelope- Bid Form & Attachments.xlsx
xlsx • 1.01 MB
2 - (Mandatory) Attachment 14 - Integrity Pact on INR 100- Stamp Papaer.pdf
pdf • 0.20 MB
3-(Mandatory) Attachment 18 - Safety Pact.docx
docx • 0.03 MB
4-(Mandatory) Attachment 20 - Declaration by Key Managerial Person & PoA Holder.docx
docx • 0.02 MB
5-(Mandatory) Attachment 21- Affidavit for self-certification.DOCX
docx • 0.02 MB
6-(Mandatory) Attachment 22-Declaration regarding events encountered pursuant to ITB Clause 2.1.docx
docx • 0.03 MB
7-(Mandatory) Attachment 23- Certificate by bidder.docx
docx • 0.02 MB
8-(Mandatory) Attachment 24- Compliance to eRA process.docx
docx • 0.02 MB
9_Attachment-25_Confirmation in regard to Design and Type Test.docx
docx • 0.02 MB
BoQ.xlsx
xlsx • 0.18 MB
Check List before Uploading bids.docx
docx • 0.02 MB
~$- (Optional) Attachment 25.docx
docx • 0.00 MB
~$- (Optional) Attachment 26.docx
docx • 0.00 MB
~$-(Optional) Attachment 26.docx
docx • 0.00 MB
1-Attachment-8_First Envelope_1.docx
docx • 0.02 MB
10-Attachment-26_Authorization certificate issued by Domestic Manufacturer_1.docx
docx • 0.02 MB
11-Attachment-27_Affidavit for self-certification_Iron & Steel_1.DOCX
docx • 0.02 MB
12-(Mandatory) Attachment -3 (QR)_1.xlsx
xlsx • 0.18 MB
13-(Mandatory) First Envelope- Bid Form & Attachments_1.xlsx
xlsx • 1.01 MB
2 - (Mandatory) Attachment 14 - Integrity Pact on INR 100- Stamp Papaer_1.pdf
pdf • 0.20 MB
3-(Mandatory) Attachment 18 - Safety Pact_1.docx
docx • 0.03 MB
4-(Mandatory) Attachment 20 - Declaration by Key Managerial Person & PoA Holder_1.docx
docx • 0.02 MB
5-(Mandatory) Attachment 21- Affidavit for self-certification_1.DOCX
docx • 0.02 MB
6-(Mandatory) Attachment 22-Declaration regarding events encountered pursuant to ITB Clause 2.1_1.docx
docx • 0.03 MB
7-(Mandatory) Attachment 23- Certificate by bidder_1.docx
docx • 0.02 MB
8-(Mandatory) Attachment 24- Compliance to eRA process_1.docx
docx • 0.02 MB
9_Attachment-25_Confirmation in regard to Design and Type Test_1.docx
docx • 0.02 MB
BoQ_1.xlsx
xlsx • 0.18 MB
Check List before Uploading bids_1.docx
docx • 0.02 MB
~$- (Optional) Attachment 25_1.docx
docx • 0.00 MB
~$- (Optional) Attachment 26_1.docx
docx • 0.00 MB
~$-(Optional) Attachment 26_1.docx
docx • 0.00 MB
02 Section - II ITB SSTE S&I DCB-PRANIT.docx
docx • 0.10 MB
03 Section-III BDS SSTE Vol-I.docx
docx • 0.07 MB
04-Annexure - A (BDS) QR Vol-I.docx
docx • 0.03 MB
07 Section-IV GCC-S&I Rev 3-DCS.pdf
pdf • 1.93 MB
08 Section-V SCC SSTE Vol-I.docx
docx • 0.05 MB
09 -Appendix-I to SCC.doc
doc • 0.17 MB
1-2_Section-II-E-RA Guidelines.docx
docx • 0.03 MB
10-Section - VI Forms and Procedures Vol-I.docx
docx • 0.17 MB
Thumbs.db
db • 0.00 MB
~$ Section - II ITB SSTE S&I DCB-PRANIT.docx
docx • 0.00 MB
~$ Section-III BDS SSTE Vol-I.docx
docx • 0.00 MB
~$ Section-V SCC SSTE Vol-I.doc
doc • 0.00 MB
~$-Annexure - A (BDS) QR Vol-I.doc
doc • 0.00 MB
~$-Annexure-I to Section-V (SCC).docx
docx • 0.00 MB
~$-Section - I IFB SSTE Vol-I.doc
doc • 0.00 MB
~$-Section - I IFB SSTE Vol-I.docx
docx • 0.00 MB
~$-Section - II ITB SSTE SI_SRM_March 2016.doc
doc • 0.00 MB
~$-Section - III BDS SSTE Vol -I.docx
docx • 0.00 MB
~$-Section - V SCC SSTE Vol-I.doc
doc • 0.00 MB
~$-Section - VI Forms and Procedures Vol-I.doc
doc • 0.00 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .