Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
21 Jul 2023, 11:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Power Corporation Limited
Venkat Ramu
Carrying out round the clock monitoring, preventive and breakdown maintenance of chiller, chiller low side equipments, air washer ventilation system & comprehensive maintenance of Split Ac, window Ac, Ductable Ac, Packaged Ac from 1TR to 15TR installed in unit 1, 2 and 3 at BTPS, Kudathini
KPCL/2023-24/PS/WORK_INDENT73
KPCL/2023-24/PS/WORK_INDENT73
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Executive Engineer CAM two Office BTPS Bellary
2 documents required · 2 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Single Work Order: Bidder who have successfully executed AMC of Centralised air condition systems of minimum 100 TR capacities with minimum single work order value of Rs. 73 Lakhs to any Govt./Public/Private Firms as a prime contractor in any one of the preceding five financial years. Work order & work done certificate issued by competent authority shall be enclosed as documentary evidence.
Work Experience: Bidder who has successfully executed AMC of Centralized air condition system of minimum 100TR capacity in any Govt./Public/Private Firms as a prime contractor with work experience in any one of the preceding five financial years. Work order & work done certificate issued by competent authority shall be enclosed as documentary evidence.
Annual Turnover: The bidder should have achieved minimum annual turnover of Rs. 283.00 Lakhs in any TWO Years in the last five financial Years. Turn over certificate issued by chartered accountant shall be enclosed as documentary proof. Also financial turn over & cost of completed works of previous years shall be given weightage of 10% per year to bring them to present price level of the financial year in which tender is invited
Statutory: The bidder should have statutory registration such as registration of establishments/ firm / company, GST Registration Certificate, PF, PAN and furnish Certificates along with technical bid. On demand Original shall be produced for verification.
The Bidder shall give declaration that EMD has not been forfeited and none of his contracts have been terminated/ foreclosed on account of their default in KPCL or elsewhere during the last five years.
₹500
₹4.2 L
20 Jun 2023
20 Jun 2023
24 Jul 2023
12 Jul 2023
5 Jul 2023
Carrying out round the clock monitoring, preventive and breakdown maintenance of chiller, chiller low side equipments, air washer ventilation system & comprehensive maintenance of Split Ac, window Ac, Ductable Ac, Packaged Ac from 1TR to 15TR installed in unit 1, 2 and 3 at BTPS, Kudathini
Round the clock monitoring of centralised air condition chillers & low side equipments such as AHU, Cooling tower, condenser & chilled water pumps and air washer ventilation units installed at Unit 1,...
Carrying out routine, preventive maintenance of Chiller, Chiller Low Side Equipments, Airwasher Ventilation System installed at Unit 1,2 & 3 BTPS including consumables, tools,tackels etc.
Non Comprehensive AMC of Carrier make 150TR water cooled screw chillers installed at Unit 01 TG chiller model 30HXC155A, Qty-02 nos.
Non Comprehensive AMC of Kirloskar make 160TR water cooled screw chillers installed at Unit 03 TG chiller model KWK160.14, Qty- 02 nos.
Comprehensive AMC of Blue star make 180TR water cooled screw chillers installed at Unit 02 TG,chiller model: LCWX1-180EEF, Qty- 02 nos.
Comprehensive AMC of Blue star make 100TR Air cooled scroll chillers installed at Unit 01, ESP, chiller model:XAC2YS-100R3 , Qty- 02 nos.
Comprehensive AMC of Blue star make 100TR Air cooled scroll chillers installed at Unit 02 ESP, chiller model XAC2YS-100R3, Qty- 02 nos.
Comprehensive AMC of Blue star make 48TR Air cooled scroll chillers installed at Unit 1,2 ODY, chiller model XACYS2048A, Qty- 02 nos.
Comprehensive AMC of Blue star make 22TR Air cooled package unit installed at Unit 03 ODY, unit model DPA2642R2A-I, Qty- 03 nos.
Comprehensive AMC of Process cooling Chiller installed at Unit 03 SWAS Room BTPS, unit model FLISPL005TP154, Qty- 02 nos.
Comprehensive AMC of STULZ Precision AC installed at Unit 03 ESP BTPS,unit model SEC 652A, Qty- 03 nos.
Comprehensive maintenance of 1 to 15 TR Split/Window type AC/Ductable/Cassette AC/Package AC (including cost of refrigerants) installed in Unit 1,2 & 3 BTPS
Breakdown maintenance - Attending cracks/punctures/ weld leakage/ pipe damage in centralized Ac/Air washer unit water pipelines & replacement of valves in centralized Ac/Air washer units from 65NB to ...
Breakdown maintenance - Complete Overhauling/Repair of Horizontal Type CF pumps of Chiller unit & Unit 03 Air washer units.
Breakdown maintenance - Minor repair/service/rectification of Air Washer Units/Air handling units (AHU)/Cooling Towers.
Breakdown maintenance - Minor repair/service/rectification of Ventilation Fans, Roof Extraction fans, Supply Fresh air fan and heavy duty exhaust fan.
Dynamic Balancing of AHU - Dynamic Balancing at site of AHU(Air Handling Units) Blowers upto 50,000 m3/Hrs
Dynamic Balancing of AWF - Dynamic Balancing at site of AHF(Air Washer fan) Blowers upto75,000 to 2,00,000 m3/Hrs
Providing of Refrigerant R134a
Providing of Refrigerant R22
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
finalbideportal.pdf
Tender Document • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .