Tender Value
₹2.5 Cr
EMD Value
₹7.4 L
Closing Date
26 Sept 2026, 6:00 pm
Sr. Manager (E-C)
AAI, Puducherry Airport Puducherry-605008
Construction of Boundary wall at Puducherry Airport. SH NCC Hanger to RWY 25 south side (Maruthi School) Phase III (Recall).
2026_AAI_283668_1
AAI/PDY/SM (E-C)/Boundary wall/Ph III/Recall/2026-27/
Open Tender
Civil Works
Works
240 days
AAI, Puducherry Airport
As per Tender Documents
8 documents required · 8 mandatory
₹1,180
₹7.4 L
2 Sept 2026
2 Sept 2026
28 Sept 2026
3 Sept 2026
26 Sept 2026
3 Sept 2026
3 Sept 2026 - 10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 270 | Cum | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | 10 | Cum | - | - |
| 3 | Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km
a) Lime, moorum, building rubbish. | 280 | Cum | - | - |
| 4 | Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km
b) Earth | 850 | Cum | - | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
(a) All kinds of soil | 1,960 | Cum | - | - |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1,190 | Cum | - | - |
| 7 | Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge | 190 | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 170 | Cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:
a) Foundations, footings, bases of columns, etc. for mass concrete | 820 | Sqm. | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:
a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 510 | Sqm. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tenderdocument.pdf
Tender Documents • 10.40 MB
BOQ_337900.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .