Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.6 LAdmitted-Finance STAKMO | -48.70% | ₹17.6 L | L1 | Admitted-Finance |
| 2 | L2₹18.0 LAdmitted-Finance | -47.47% | ₹18.0 L | L2 | Admitted-Finance |
| 3 | L3₹18.5 LAdmitted-Finance | -46.14% | ₹18.5 L | L3 | Admitted-Finance |
| 4 | L4₹18.7 LAdmitted-Finance R O SPITUK | -45.50% | ₹18.7 L | L4 | Admitted-Finance |
| 5 | L5₹20.6 LAdmitted-Finance | -40.10% | ₹20.6 L | L5 | Admitted-Finance |
Tender Value
₹34.3 L
EMD Value
₹68,680
Closing Date
16 Apr 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer PWD Rnb division Leh
Construction of link road to Tunglung Mohallah Basgo ( Under Capex )
2026_PWD_18689_1
E Tender 218 of R and B Division Leh
Open Tender
Civil Works - Others
60 days
Leh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Office of the Executive Engineer Rnb division Leh
₹68,680
22 Apr 2026
27 Mar 2026
18 Apr 2026
27 Mar 2026
16 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | ||||||
Dry stone pitching ( any thickness ) inluding cost of stones. On Horizontal | - | CUM | - | - | item 02 | |
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | CUM | - | - | item 03 | |
Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | - | CUM | - | - | item 04 | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - | item 05 | |
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | item 06 | |
Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - | item 07 | |
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - | item 08 | |
Edges of slabs and breaks in floors and walls
Under 20 cm wide | - | Rm | - | - | item 09 | |
Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - | item 10 | |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_44761.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid