Loading…
Loading…
Tender Value
₹697.2 Cr
EMD Value
₹13.9 Cr
Closing Date
14 Jul 2026, 12:00 pm4d left
Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to T-9) & from Km 110.02 to Km 113.12 involving 1 No Tunnel(T-1), BLT Works & its approaches and Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Over Bridge (ROBs), Road Under Bridge (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleeper, Special PSC Sleepers (For Turnouts, Improvised SEJs, Guard Rails Etc), Point (Thick Web Switches & WCMS Crossing, Glued Joints, H- Beam/ Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, OHE foundations, Supply and Erection of OHE Masts, Provision of 1X25 kV Conventional Type OHE (OHE-22.660TKM) including 2.86 Km ROCS in Tunnel, Provision of one feeding post (TSS) Modifications/Conversion to Underground for overhead electrical HT/LT Power Line Crossings, construction of Platforms, Station Buildings, FOB, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification works etc in Waltair Division of East Coast Railway.
EPC-CONIIVSKP2026019
EPC-CONIIVSKP2026019
Open
30 Months
Vizianagaram, Andhra Pradesh
₹0
₹13.9 Cr
14 May 2026
14 May 2026
30 Jun 2026
Separate rates should be quoted for Schedule G1A, G1B & G1C.}
Execution of any other item not covered in Schedule G, Schedule -G1A & G1B), but covered under
USSOR-2021 & CPWD-DSR-2023.
S No. Item Description of Item Unit Qty Rate Amount
covered in Schedule G
above(Schedule-G of EPC Agreement)
and Schedule -G1A, G1B& G1C
above,through items from ECoR
USSOR-2021& CPWD-DSR-2023 Items
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Soil Report Min Br Part1
ATTACHMENT
GunupurNewB.GLine_BR-
ATTACHMENT
Soil Report Min Br Part3
ATTACHMENT
BR-368_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-372_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-375_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-377_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-379_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-386_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-387_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BR-390_Hydrology_GunupurtoTheruvali.pdf
ATTACHMENT
BLTletterCT-EF-BLT-IFSdtd.24.07.2024.pdf
ATTACHMENT
1x6.10mPSCSlab_1.pdf
ATTACHMENT
1x2.44mRCCSlab.pdf
ATTACHMENT
1x6.0x5.0LHS.pdf
ATTACHMENT
1x2.0x2.0mBoxSyphon.pdf
ATTACHMENT
1x7.50x8.00mRCCBOXROB.pdf
ATTACHMENT
KMZFileLinkGNPR-THV.pdf
ATTACHMENT
RefBR.NO_38518.0M._ROB_1.pdf
ATTACHMENT
RefBRNO-3671x6x6RCCBox.pdf
ATTACHMENT
TentativedwgBRNO-373.pdf
ATTACHMENT
TentativedwgBRNO-374.pdf
ATTACHMENT
DURGISTATIONYARD.pdf
ATTACHMENT
BANKILIP.H.STATIONYARD.pdf
ATTACHMENT
110-115LSECTIONNWP-GNPR_1.pdf
ATTACHMENT
120-125LSECTIONNWP-GNPR.pdf
ATTACHMENT
125-130LSECTIONNWP-GNPR.pdf
ATTACHMENT
130-135LSECTIONNWP-GNPR.pdf
ATTACHMENT
135-140LSECTIONNWP-GNPR.pdf
ATTACHMENT
140-145LSECTIONNWP-GNPR.pdf
ATTACHMENT
FOBAlongwithramp.pdf
ATTACHMENT
1x4.0x2.0mRCCBox.pdf
ATTACHMENT
Refdwgof1x36.0MROB.pdf
ATTACHMENT
TUNNEL_T-1_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-2_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-3_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-4_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-5_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-6_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-7_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-8_GUNUPUR.pdf
ATTACHMENT
TUNNEL_T-9_GUNUPUR.pdf
ATTACHMENT
EPC Agt GNPR THV Ph III Sch G1 Pt1
ATTACHMENT
EPC Agt GNPR THV Ph III Sch G1 Pt2
ATTACHMENT
0.0SoilReport_Nuapada-GunupurNewB.GLine_BR-366_367_368_372.pdf
ATTACHMENT
0.0SoilReport_Nuapada-GunupurNewB.GLine_BR-374_375_377_378_378A.pdf
ATTACHMENT
0.0SoilReport_Nuapada-GunupurNewB.GLine_BR-387_390_394.pdf
ATTACHMENT
EPCAgreementGNPR-THVPh-IIIEPCwithScheduleG-1Part-I.pdf
ATTACHMENT
EPCAgreementGNPR-THVPh-IIIEPCwithScheduleG-1PartSchedule.pdf
ATTACHMENT
RFPDocumentGNPR-THVPhase-III1.pdf
ATTACHMENT
EPC-GNPR-THVTechnicalSpecificationsandSplConditions.pdf
ATTACHMENT
Download all tender documents and submit your bid