Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-Finance | 1 | Accepted-Finance found eligible | |
| 2 | 2₹1.4 L+₹9,220 (7.14%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹1.4 L+₹9,300 (7.20%)Accepted-Finance | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
14 Sept 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowsh
Office of the Executive Engineer MID Akhnoor/Nowsh
Restoration by strengthening of suction lines along with other allied works at LIS Bhanara, LIS fundwal, LIS saroh, LIS Bal.
2022_IFC_186557_1
84/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowsh
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
21 Oct 2022
7 Sept 2022
15 Sept 2022
7 Sept 2022
14 Sept 2022
9 Sept 2022
8 Sept 2022
Desilting / Strengthening of 200 mm dia Suction lines along with foot valves of pumping unit no. 01 & 02 installed at LIS Bhanara. The job involves disconnecting the suction pipes & extraction of suction pipes and footvalves from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes and footvalves with the crow bars, hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges (3No.) and Repair the footvalves by way of welding to damaged body and strainer of foot valve. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines .thereafter connecting the footvalves by P/F of new rubber sheet and nuts and bolts. Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. Complete job in all respects.
Desilting / Strengthening of 150 mm dia Suction lines along with foot valves of pumping unit no. 01 & 02 installed at LIS Fundwal . The job involves disconnecting the suction pipes & extraction of suction pipes and footvalves from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes and footvalves with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges (5no.) and Repair the footvalves by way of welding to damaged body and strainer of foot valve. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines .thereafter connecting the footvalves by P/F of new rubber sheet and nuts and bolts. Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. Complete job in all respects.
Desilting / Strengthening of 200 mm dia Suction lines along with foot valves of pumping unit no. 01 & 02 installed at LIS Saroh. The job involves disconnecting the suction pipes & extraction of suction pipes and footvalves from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes and footvalves with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges(2no.) and Repair the footvalves by way of welding to damaged body and strainer of foot valve. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines .thereafter connecting the footvalves by P/F of new rubber sheet and nuts and bolts. Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. Complete job in all respects
Desilting / Strengthening of 200 mm dia Suction lines along with foot valves of pumping unit no. 01 & 02 installed at LIS Bal. The job involves disconnecting the suction pipes & extraction of suction pipes and footvalves from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes and footvalves with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges (4No.) and Repair the footvalves by way of welding to damaged body and strainer of foot valve. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines .thereafter connecting the footvalves by P/F of new rubber sheet and nuts and bolts. Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. Complete job in all respects
VEE AUTO TRADERS
R M ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .