Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹4.6 L (4.68%)Rejected-AOC GALA NO 3 EDUJI ROAD CHARAI PAWAR INDUSTRIAL ESTATE THANE W THANE W THANE MAHARASHTRA 400601 | THANE | MAHARASHTRA | 400601 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.0 Cr+₹5.7 L (5.76%)Rejected-AOC KULAD NALCONAGAR ANGUL 759145 ODISHA | ANGUL | ANGUL | ODISHA | 759145 | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.0 Cr+₹6.7 L (6.81%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹1.1 Cr+₹11.0 L (11.2%)Rejected-AOC AT GIRANG CHHAK GIRANG NALCO NAGAR KULAD ANGUL ODISHA 759145 | ANUGUL | ODISHA | 759145 | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
14 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. Devadutta Mohanty, DGM (Mech.)-TnC
TnC Department, Smelter Plant, NALCO, Angul, Odisha-759145
Operation of Pollution Control Facilities
2022_NALCO_723464_1
OMC-5604
Open Tender
Job Works
Item Rate
730 days
Smelter Plant, NALCO, Angul
As per NIT Document
6 documents required · 6 mandatory
₹500
Yes
National Aluminium Company Limited
₹1.3 L
Yes
31 Mar 2023
15 Nov 2022
16 Dec 2022
15 Nov 2022
14 Dec 2022
15 Nov 2022
Amount
Item No: 1. Operation of Solid-Liquid Hazardous Waste Incinerator (General shift). 1. Processing of oil containing waste like emulsion filter papers, used vehicle filters, oil soaked cotton wastes, used AlF3 jumbo bags etc. for incineration. 2. Shifting of water portion of emulsion oil barrels from emulsion treatment plant and pouring it into liquid waste tank at hazardous waste incinerator with the help of forklift. 3. Feeding of solid wastes manually into primary chamber of solid waste incinerator. 4. Feeding of liquid waste into primary chamber of liquid waste incinerator by pumping. 5. Operation of panel and maintaining parameters as per direction of Engineer-in-charge. 6. Operation of valves, Fans, Pumps, and incinerator burners. 7. Cleaning oil filters, fuel pump filters of incinerator burners, burner nozzles and diffuser plates whenever required. 8. Cleaning sludge from quenching tank whenever required. 9. Cleaning and removal of incineration ash from the chambers of the incinerator. 10. Bagging of incineration ash in used HDPE bags and keeping it at designated shed. 11. Charging soda ash into effluent pit for neutralization. 12. Cleaning of sludge from effluent pit whenever required. 13. Shifting of LDO filled barrels from LDO storage area to incinerator and charging it into LDO service tank at incinerator by pumping. 14. To assist during maintenance jobs. 15. To assist during incinerator stack sampling. 16. Maintaining housekeeping in and around hazardous waste incinerator. 17. Maintaining log book of all operations. 18. Reporting to the engineer-in-charge and concerned maintenance departments in case of any breakdowns or other problems. NOTE: 1. The contractor has to deploy minimum one Skilled Worker and three Un-Skilled Workers in General shift. 2. Shifting & unloading of oil containing waste at site will be done by Nalco. 3. Tools and tackles like brooms, buckets, ropes, shovel, stick, spade, baskets, etc. required for execution of the job are to be arranged by the contractor at his own cost. 4. Forklift will be provided by Nalco for material handling.
Item No: 2. Disposal of incinerator ash. 1. Loading of incineration ash bags unto the truck / tractor. 2. Shifting and dumping of incineration ash to hazardous waste landfill within the plant boundary. 3. During dumping HDPE bags are required to be separated, only incineration ash is to be disposed in Landfill. NOTE: 1. The contractor has to use his own arrangement for the said job at his own cost. 2. The contractor has to use his own Truck / Tractor for shifting and disposal.
Item No: 3. Operation of Defluoridation Plant (Three shifts-A, B & C). 1. Operation of all pumps, valves and electrical switches in Defluoridation plant, Effluent Pump House and Holding Pool Pump House as per instruction. 2. Opening covers of Alum Dosing tanks, pH Correction Tanks, manhole flanges of resin beds and carbon beds whenever required. 3. To inspect level of water in raw water and treated water sump of Defluoridation plant and Holding pool pump house sump. 4. Operation of switch panels of Defluoridation plant. 5. Operation of DF Plant Compressor whenever required. 6. Shifting/ breaking/ charging alum into Alum Dosing Tanks as per requirement. 7. Shifting/ charging Soda ash/ Lime into pH Correction Tanks as per requirement. 8. Removing/ filling fluoride removal resin into Fluoride Removal Columns (FRC-A,B&C) whenever required as per instruction of EIC. 9. Removing/ filling activated carbon into Activated Carbon Filters (ACF-A,B&C) whenever required as per instruction of EIC. 10. To do backwash of all three Fluoride Removal Columns (FRC-A,B&C) and Activated Carbon Filters (ACF-A,B&C) with filter water as per standard operating procedures (SOP). 11. To do regeneration with alum solution and rinse with filter water of Fluoride Removal Columns as per standard operating procedures (SOP). 12. To run & stop Defluoridation Plant as per direction of Engineer-in-charge. 13. Cleaning of all three Fluoride Removal Columns (FRC-A,B&C) with compressed air once in a week. 14. Cleaning of alum dosing tanks, pH correction tanks and reaction tank whenever required. 15. To assist during maintenance jobs. 16. To collect inlet and outlet samples of Defluoridation plant and send it to Laboratory for analysis on regular basis. 17. To note readings of Pressure gauges, Ammeters, Flow meters in Defluoridation plant, Effluent Pump House and Holding Pool Pump House. 18. Maintaining log book of all operation. 19. To inform Engineer-In-Charge and concerned electrical, mechanical and instrumentation agencies in case of any breakdown. 20. To collect samples from holding pool, zero discharge sump, final discharge point, Watch Towar-23 and from drain-1,2&3 as and when required as per direction of EIC. 21. To measure depths of resin beds & activated carbon beds at specified frequency. 22. To inspect all parts of Defluoridation plant, Effluent Feed Pump House, Holding Pool Pump House & DF Plant Compressor for any abnormality. 23. To assess the quantity of chemicals (i.e. alum and soda ash/ lime) and inform engineer-in-charge the stock level. 24. To operate online fluoride ion analyser and record all results of analysis. 25. To collect sample bottles from Laboratory. 26. To assist during monthly sampling by State Pollution Control Board. 27. To carry correspondences regarding Defluoridation plant. 28. To clean floating debris from raw water and treated water sump of DF plant and Holding pool pump house sump whenever required. 29. To maintain good housekeeping in and around Defluoridation plant. 30. To clean drains of DF plant on regular basis. 31. To do cleaning of the floors of Defluoridation plant, Effluent Feed Pump House, Holding Pool Pump House and shift office room. 32. To clean the bushes around Defluoridation plant, Sand beds, Effluent Feed Pump House, Holding Pool Pump House and shift office room. 33. Operation of Garlanding pump near Wheel washing System for transferring waste water from the Reservoir to Holding pool as and when required as per the instruction of EIC. 34. Any other work assigned by engineer-in-charge as and when required in-case of emergency. NOTE: 1. The contractor has to deploy minimum one Skilled Worker, one Semi-Skilled Worker and one Un-Skilled Worker in each shift. 2. Tools and tackles like brooms, buckets, ropes, shovel, stick, spade, baskets, etc. required for execution of the job are to be arranged by the contractor at his own cost. 3. Forklift will be provided by Nalco for material handling.
Item No: 4. Cleaning of pollution control facilities (Two Shift-A & B). 1. Cleaning of oil, debris, suspended solids and floating materials from oil-water separator pits of all three major Drains i.e. Drain-1, Drain-2 & Drain-3 on regular basis. 2. Cleaning of oil, debris, suspended solids and floating materials from oil-water separator pits of twin recycling sump including recycling sump. 3. Cleaning of oil, debris, suspended solids and floating materials from Holding pool-1, Holding pool-2 & Holding pool-3. 4. Cleaning of Plant final discharge channel from Holding pool-1 over flow point to plant boundary wall. 5. Cleaning of strainers of Drain-1, 2 & 3, Final discharge channel and Channel near watch tower No-23. 6. Placement of Hay stacks in the above areas for removing oil. 7. Cleaning of used Hay stacks and shifting it to hazardous waste incinerator for incineration. 8. Reclaiming oil from the above areas and from all oil-water separator pits mentioned above. 9. Thorough cleaning of the above mentioned areas so that no trace of oil is left on the floor. 10. Cleaning of debris, suspended solids and floating materials from Holding pool pump house sump and raw water and treated water sump at Defluoridation Plant. 11. Shifting of empty barrels from Emulsion Treatment Plant to oil water separator pits for reclaiming oil and shifting filled oil barrels from oil-water separator pits to Emulsion Treatment Plant as and when required. 12. Opening or Closing of sluice gates situated in the channel in between Holding Pool-2 & 3 and in Drain-3 as per the instruction of Engineer-in-charge. 13. Opening or Closing of outlet gate valve of Holding Pool-2 as per the instruction of Engineer-in-charge. 14. Cleaning of approach road to all oil water separators. 15. Cleaning of surrounding road of all Holding Pools. 16. To inspect the level of water of all Holding Pools and inform engineer-in-charge on daily basis. 17. Maintaining log book of all operations. 18. Reporting to the Engineer-in-charge in case of any abnormal situation or other problems. NOTE: 1. The contractor has to deploy minimum two un-skilled workers in A-Shift and two un-skilled workers in B-Shift. 2. Tools and tackles like brooms, buckets, ropes, shovel, stick, spade, baskets, etc. required for execution of the job are to be arranged by the contractor at his cost. 3. Forklift will be provided by Nalco for material handling.
Item No: 4. Cleaning of pollution control facilities (Two Shift-A & B ). 1. Cleaning of oil, debris, suspended solids and floating materials from oil-water separator pits of all three major Drains i.e. Drain-1, Drain-2 & Drain-3 on regular basis. 2. Cleaning of oil, debris, suspended solids and floating materials from oil-water separator pits of twin recycling sump including recycling sump. 3. Cleaning of oil, debris, suspended solids and floating materials from Holding pool-1, Holding pool-2 & Holding pool-3. 4. Cleaning of Plant final discharge channel from Holding pool-1 over flow point to plant boundary wall. 5. Cleaning of strainers of Drain-1, 2 & 3, Final discharge channel and Channel near watch tower No-23. 6. Placement of Hay stacks in the above areas for removing oil. 7. Cleaning of used Hay stacks and shifting it to hazardous waste incinerator for incineration. 8. Reclaiming oil from the above areas and from all oil-water separator pits mentioned above. 9. Thorough cleaning of the above mentioned areas so that no trace of oil is left on the floor. 10. Cleaning of debris, suspended solids and floating materials from Holding pool pump house sump and raw water and treated water sump at Defluoridation Plant. 11. Shifting of empty barrels from Emulsion Treatment Plant to oil water separator pits for reclaiming oil and shifting filled oil barrels from oil-water separator pits to Emulsion Treatment Plant as and when required. 12. Opening or Closing of sluice gates situated in the channel in between Holding Pool-2 & 3 and in Drain-3 as per the instruction of Engineer-in-charge. 13. Opening or Closing of outlet gate valve of Holding Pool-2 as per the instruction of Engineer-in-charge. 14. Cleaning of approach road to all oil water separators. 15. Cleaning of surrounding road of all Holding Pools. 16. To inspect the level of water of all Holding Pools and inform engineer-in-charge on daily basis. 17. Maintaining log book of all operations. 18. Reporting to the Engineer-in-charge in case of any abnormal situation or other problems. NOTE: 1. The contractor has to deploy minimum two un-skilled workers in A-Shift and two un-skilled workers in B-Shift. 2. Tools and tackles like brooms, buckets, ropes, shovel, stick, spade, baskets, etc. required for execution of the job are to be arranged by the contractor at his cost. 3. Forklift will be provided by Nalco for material handling.
Item No: 6. Cleaning of Holding Pool Pump House Sump. 1. Dewatering of Holding Pool Pump House Sump for cleaning of sludge as per direction of EIC. 2. Removal of sludge from Holding Pool Pump House Sump. 3. Shifting & disposal of sludge to landfill as indicated by engineer- in- charge. NOTE: 1. The contractor has to use his own arrangement for the said job at his own cost. 2. The contractor has to use his own Truck / Tractor for shifting and disposal.
Item No: 7. Cleaning of Holding Sump of Defluoridation Plant. 1. Dewatering of raw water and treated water Sump of DF Plant for cleaning of sludge as per direction of EIC . 2. Removal of sludge from raw water and treated water Sump of DF Plant. 3. Shifting & disposal of sludge to landfill as indicated by Engineer-in-charge. NOTE: 1. The contractor has to use his own arrangement for the said job at his own cost. 2. The contractor has to use his own Truck / Tractor for shifting and disposal.
Item No: 8. Disposal of used sand/ carbon sludge/ chemical sludge from sand beds of Incinerator & DF Plant. 1. Cleaning and removal of used sand/ Carbon sludge/ Chemical sludge upto a depth of 250 mm from Sand beds of Incinerator & DF Plant as per direction of EIC. 2. Bagging of used sand/ Carbon sludge/ Chemical sludge in used HDPE bags and keeping it at designated shed. 3. Loading of used sand/ carbon sludge/ chemical sludge bags unto the truck / tractor. 4. Shifting and dumping of used sand/ carbon sludge/ chemical sludge bags to hazardous waste landfill within the plant boundary. 5. During dumping HDPE bags are required to be separated, only used sand/ carbon sludge/ chemical sludge are to be disposed in Landfill. NOTE: 1. The contractor has to use his own arrangement for the said job at his own cost. 2. The contractor has to use his own Truck / Tractor for shifting and disposal.
Item No: 9. Supply of new sand/ gravels for sand beds of Incinerator & DF Plant. 1. Bringing coarse river sand/ gravels to Incinerator & DF Plant site. 2. Spreading of gravels in sand beds of Incinerator & DF Plant after complete removal of used sand/ carbon sludge/ chemical sludge from Sand beds of Incinerator and DF plant as per direction of EIC. 3. Spreading of new sand over the gravels layer at a thickness of 150 mm as per direction of EIC. NOTE: 1. The contractor has to use his own arrangement for the said job at his own cost. 2. The contractor has to use his own Truck / Tractor/ JCB for shifting and laying.
Item No: 10. Covering/ Uncovering of Hazardous Waste with plastic tarpaulin. 1. Covering of hazardous waste at Landfill and dross kept on open concrete area at Scrap & Salvage with plastic tarpaulin as and when required as per instruction of EIC. 2. Pinning of tarpaulin with used tyres to keep the tarpaulin in fixed position. 3. Uncovering of plastic tarpaulin from hazardous waste at Landfill and from dross kept on open concrete area at Scrap & Salvage as and when required as per instruction of EIC. 4. Before uncovering of tarpaulin, tyres used for pinning purpose are to be collected and kept in designated place. NOTE: 1. The contractor has to use his own arrangement for the said job at his own cost. 2. Plastic tarpaulin will be provided by Nalco. 3. Used tyre to pin the tarpaulin will be provided by Nalco.
ADR EXPRESS SERVICES PVT LTD
M/s. Power Construction
M/s. UNIQUE CONSTRUCTION
M/s. G.B. SAMAL
S K BHATTA
M/S SANTOSH GARNAYAK
M/s Ranjeet Construction
M/s. Diptiranjan Enterprise
M/s. ALEKHA MAHIMA CONSTRUCTION
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .