Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC GURSARAI JHANSI UTTAR PRADESH | JHANSI | UTTAR PRADESH | 284001 | ₹8.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹8.3 LRejected-Finance | ₹8.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.3 LRejected-Finance | ₹8.3 L | L3 | Rejected-Finance L3 |
Tender Value
₹8.3 L
EMD Value
₹82,880
Closing Date
24 Feb 2026, 5:00 pmClosed
EO
npp gursarai
Npp Gursarai Mohalla Katra Ward No 15 Me Shriram Ghosh Ke Makan Ke Pass Bane Nale Ke Kinare 04 Seetar Purush/Mahila Shochalay Ka Nirman
2026_DOLBU_1113577_1
367/NPPG/15va Tied/Untied/2025-26 Date- 05-02-2026
Open Tender
Civil Works - Others
npp gursarai
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,253
Yes
EO
₹82,880
Yes
28 Feb 2026
9 Feb 2026
25 Feb 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
Clearing jungle including uprooting of rank vegetations grass, bush, wood trees and saplings of girth upto 30 cm. Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. S.I no - 259
Providing cost of dewatering including cost of boaring, laying o 4" dia PVC Pipe, Hire charges of 7.5 K.V. Diesel pumping set, hire charges of pvc pipe and cost of 4" dia plastic pipe for disposal of water as required distance also including wages of repairing leakage during operation with hire charges of tractor including loading and unloading of pumping set. Work S.I. No. NSLA
S/O Diesel For Pumping set with all Comp.
Boring of 30 cm dia piles of double under reamed of 50 cm dia of bulb and 3.5 m depth in black cotton soil with hand operated auger machine including all labour and T&P etc. for proper completion of work. As per IS Code 2911 (Part-III) 1980.New Item 5, Ch- 4.
Excavation in soil mixed with moorum/ shingle/ kankar requiring the use of special T&P such as pickaxes, subbals etc.including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. S.I no - 252
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km (5 miles) from the side of work & including watering, dressing etc. Rate to include cost of all materials labour and tools & plants, etc. required for proper completion of the work.(Si.No.255)
Cement concrete with 4cm gauge approved stone ballast, approved coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.PCC SI No.281
R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in Footing excluding supply of reinforcement and its binding wire and including its fixing and binding the same with 24 B W.G.G.I. binding wire an including neccecary centering & shuttering etc & also including supply of all materials labour & T&P etc required for proper completion of the work. Binding wire cost being included in the item 287 -1st
R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in Plinth beam/lighter beam excluding supply of reinforcement and its binding wire and including its fixing and binding the same with 24 B W.G.G.I. binding wire an including neccecary centering & shuttering etc & also including supply of all materials labour & T&P etc required for proper completion of the work. Binding wire cost being included in the item No-285-1st
RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in Column, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost.SI No.288(1) Ch-5.
Brick Work with non modular fly ash lime bricks (FALG Bricks) conforming to IS:12894, class designation 10 average compressive strength in foundation Cement mortar 1:4 (1 cement : 4 coarse sand) as per sor S.I. No. DSR 6.34.
Brick Work with non modular fly ash lime bricks (FALG Bricks) conforming to IS:12894, class designation 10 average compressive strength in super structure Cement mortar 1:4 (1 cement : 4 coarse sand) as per sor S.I. No. DSR 6.34.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20") in depth and earthwork in embankment to be in 20 cm(8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100') lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in-charge SI NO. 253
RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in Beam, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no -286(1) Ch-5.
RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in Slab, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. S.I. No.284 (1) Ch-5.
12 mm thick plaster on brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work. Plaster & pointing Ch.-13 17.58(III) Ch.13.
15 mm thick plaster on brick work on rough surface with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI. No. 17.59(iii) Ch.-13.
Providing and applying Plaster of paris putty of 2 mm Thickness over plasterod surfaco to prepare the surface even and smooth complete. S.I. No. New item Ref. DAR-13.26. Ch.-15.
One priming coat and Two coat oil distemper on new work including supply of all materials, labour and T&P etc. required for proper completion of work SI.No.649+650, Ch-15.
Finishing walls with Water proof cement paint of approved make and quality on new work with three coats to give an even shade including supply of all materials labour, tools and plants etc. required for proper completion of work.SI No.660+661, Ch-15.
25 mm cement concrete flooring 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate of size 12.5 mm and below) by laid over base concrete finished with floating coat of neat cement (base concrete to be paid separately) including fixing of glass strips. (Excluding cost of glass strips) SI. No. 14.69 Ch.-14.
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks.SI. No. 504 Ch.-10.
Supply of MS angle iron door, window or ventilator frame made of approved MS angle iron wrought to required from including drilling holes, welding and riveting where necessary and also including supply of all material, such as steel hinges of required size, nut and bolts etc and also including all taxes, wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site of work.New Item 2 of Mild Steel and Iron Work page no -53 S.I. No. new item 2
Supply of approved MS windows and M.S grill and ventilators excluding cost of glass panes but including supply of all materials, its fabrication nut and bolt, hold fast required labour and tools and plants for proper completion of work as per direction of Engineer-in-charge and also including cost of handles, stays etc and one coat of red oxide paint complete in all respect at site of work. pg no 53 S.I. no. new item 3
Supply & fixing 6 mm. (1/4") China white glazed in flooring or skirting or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry jointing & polishing complete including supply of all materials, labour and T & P etc. required for proper completion of the work. SI. No. 628
Painting or varnishing new iron work in small areas or new wood work with one coat (up to one Sq. meter) of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950.SI No. 641+642, Ch-15.
Sanitary work
Electrification work
Add 18% GST
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.11 MB
BOQ_2062182.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid