Expenditure
Capital (Works)
Above/Below/Par
TELECOM
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less ; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited. : Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- 1.Work of Supply, Installation, Testing and Commissioning of networking system through OFC or Copper Cable or Microwave or Wireless or Leased lines using Router/Switches/hubs/LAN Extenders or Wireless LAN/IP DSLAM. OR 2.AMC of networking system through OFC or Copper Cable or Microwave or Wireless or Leased lines using Router/Switches/hubs/LAN Extenders or Wireless LAN/IP DSLAM. NOTE A1: For the following equipment's a.SDH/STM/PDMUX/IPMPLS/VOIP b. Control equipment c. ISDN/IP based exchange d. CCTV/Video surveillance system e. Integrated security system f. Networking equipment g. Train information display board/Coach guidance system/IPIS/GPS CLOCKS h. secured communication system at level crossing gates i. VSAT J. MTRC 1. The equipment shall be procured from: a) If there is any RDSO approved source, then the equipment to be procured from the RDSO approved source or its authorized dealer/distributor b) If there is no RDSO approved source but there is TEC approved source, then the equipment to be procured from the TEC approved source or its authorized dealer/ distributor c) If there is no RDSO or TEC approved source then the equipment to be procured from the OEM or its authorized dealer/ distributor. 2. Make, Model Specification of the offered equipment along with OEM authorization if the tenderer is other than OEM shall be submitted along with the tender. 3. MOU with RDSO approved Source or TEC approved source or the OEM, covering Supply, installation, testing, commissioning of system including after sales support required during warranty period shall be submitted along with the tender.
26 conditions · 15 needing a document upload
Firm has to submit authorization letter for uploading documents on IREPS in case he/she is not an authorized person
PAN card Copy should be enclosed.
Please submit the copy of the registration certificate as applicable, GSTIN certificate should be enclosed.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available ON IREPS portal LIKE net banking, debit card, credit card etc.Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed.
Copy of PAN number and GSTIN number should be submitted.
No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenders shall be treated as NULL & Void.
(i)Tenderers will examine various provisions of the Central Goods and Service Tax Act, 2017(CGST)/Integrated Goods and Service Tax Act,2017(IGST)/Union Territory Goods and Service Tax Act,2017(UTGST)/respective states State Goods and Service Tax Act(SGST) also, as notified by Central/States Govt. and as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit(ITC) likely to be availed by them is duly considered while quoting rates. (ii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority. (iii) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism(RCM) and deposit the same to the concerned authority.
Tenderer should go through Annexure 1 & 2 of Tender Notice (attached in Tender Document)for list of documents required to be uploaded along with the offer.
Augmentation & upgradation of Last Mile connectivity of CMS at various Stations over Lucknow Division, Northern Railway
106-Tele_Tend_01_2026-27
106-Tele_Tend_01_2026-27
Open
Works - General
180 Days
Lucknow, Uttar Pradesh
₹0
₹3.5 L
1 Jun 2026
11 May 2026
18 May 2026
57 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,74,59,079.71 | ||
| — | 27.00 | — | — | ||
| "Supply, Installation,configuration, Testingand Commissioning of Router have LAN/WAN port with minimum 2 Nos of 1G Ethernet Ports, 4 nos. of E1/G.703 ports, and minimum 2X 1G SFP Ports with supply of 2 Nos of 1G SFP Optical Transceivers Module as per clause no. 3.0 of RDSO/SPN/TC84/2008, Rev-0 with latest amendments and versions. INSPECTION: RITES FOR SUPPLY PORTION" | — | — | — | 96,30,831.15 | |
| — | 5.00 | — | — | ||
| "Supply of 24 port Layer3 network switches with 4 Nos. 10/100/ 1000 Base-T/1000 Base-X SFP ports make model DG-GS4628SE DIGISOL /CISCO/JUNIPER or superior. INSPECTION: RITES FOR SUPPLY PORTION" | — | — | — | 5,44,526.05 | |
| — | 30.00 | — | — | ||
| "Supply of Online UPS of Rating 1.0 KVA With Battery Of Backup Time 60 Minutes Brand: Uniline/APC/NUMAX or better INSPECTION: RITES FOR SUPPLY PORTION" | — | — | — | 8,14,212 | |
| — | 15000.00 | — | — | ||
| Blowing/drawing of OFC cables inthe HDPE duct along with all theprotective work as per instructionsof engineer incharge at site. | — | — | — | 1,88,250 | |
| — | 15000.00 | — | — | ||
| "Supply of 40 mm outer dia. PLB HDPE duct as per RDSO Spec. No. RDSO/SPN/TC/45/2013, Rev 2.0 or latest with all accessories (like couplers, bends etc) INSPECTION: RITES FOR SUPPLY PORTION" | — | — | — | 8,90,700 | |
| — | 15000.00 | — | — | ||
| Laying of PLB HDPE pipe in trench/open space, fixing and clamping of HDPE pipe on wall or structure and sealing of the duct after laying with proper fixing material. All the accessories like couplers, end caps/plugs to be provided by the contractor within the same cost and its protective work as per direction of site engineer. | — | — | — | 1,50,300 | |
| — | 12000.00 | — | — | ||
| Excavating and refilling of trench in Normal Soil to the level of ground with rammed earth as per drg. No. NR/S&T/Con./1.1/97A or latest so as not to form a drain 0.3 mtrs. Wide & 1 mtr. Deep on both side of the station alongside the track. It shall conform to the safe distance as per signalling and cable plan in all type of soil. It also includes clearance of roots of trees & bushes. (15cm wide 30cm depth) | — | — | — | 7,00,440 | |
| — | 3000.00 | — | — | ||
| Horizontal direction drilling(HDD)/Trenchlessdigging/machine drilling withoutdamage to surface road /trackfor laying/insertion ofHDPE/GI/DWC pipe. The boreshall be done at the depth ofminimum 1400 mm from theground level. The ground levelshall be considered ignoring thebank height of the bank of the road. Note:- DWC/HDPE/GI PipeSupply is not covered under thisitem. Contactor shall provide allmaterial required for work andadequate nos. of labours forproper laying of cables into thebore. Cable shall be laidcautiously so that it should notget damage due to roughhandling & pressure on cable.Payment of boring shall bemade only aft er DWC/HDPE/GIpipe is laid in the bore." Insp.By Consignee. | — | — | — | 14,89,440 | |
| — | 5000.00 | — | — | ||
| "Supply of 12 Fiber Armored Single mode Optical Fiber ITU - G 652 D. All Dielectric Self Supporting Optical Fiber Cable as per GEM Specification Enclosed. Make: FINOLEX, KEC or Better INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 1,52,350 | |
| — | 5000.00 | — | — | ||
| "Supply of STP (Shielded Twisted Pair)CAT 6 Cable as per RDSO Specification No RDSO/SPN/TC/65/2021 Version 6.0 or latest. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 1,76,650 | |
| — | 10000.00 | — | — | ||
| Laying of OFC/Power cable/CAT-6 cable PA Cable/Data cable and all the other types of telecom cable and all the other types of telecom cable through HDPE pipe/casing capping/fall ceiling with laying/fixing of HDPE pipe/casing capping/uPVC pipe for connecting/interfacing variouys cpmponents and system integration. All materials for jointing and termnaition of power cable/CAT-6 cable as per site requirement are to be supplied by contractor. This item also includes supply of RJ- 45 connector with cap for terminating CAT-6 cable and supply and installation of power board with 4 points (3 nos 5 amp sockets and 1 nos 15 Amps socket) as per site requirement. | — | — | — | 2,54,100 | |
| — | 200.00 | — | — | ||
| "Supply of LC-LC/SC-SC/SC-LC patch cord (5 meter) (3M, TE connectivity, R&M make or superior) (Or as per site requirement) Inspection: Consignee. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 24,054 | |
| — | 362.00 | — | — | ||
| "Supply of Single Mode Patch Cord length 3 meters (LC-LC/SC-SC/SC-LC) or as per site requirement. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 70,007.18 | |
| — | 200.00 | — | — | ||
| "Supply of STP/UTP RJ 45 Connectors Make D-Link, AMP, DAX, Legrand, Molex or Digilink. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 2,228 | |
| — | 30.00 | — | — | ||
| "Supply & Installation of 19"" Rack 17U withpower strip and all fitting accesssories forhousing of network equipment. Both side door INSPECTION: RITES FOR SUPPLY PORTION" | — | — | — | 5,76,936.6 | |
| — | 15.00 | — | — | ||
| "Power Board (3 No's 5 amp & 1 no 15 Amp socket total-4 points). Make: Anchor, Havells or similar. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 8,331.75 | |
| — | 10.00 | — | — | ||
| "Supply, Installation and commissioning of Fibre Distribution Management system (FDMS)/LIU for 24 Fiber complete with all accessories with patch cord & pigtail as per TEC Spec. GR/FDM/01/02April'2007 or latest. This include supply of installation accessories as per technical specification. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 64,053.3 | |
| — | 30.00 | — | — | ||
| "Supply of 12 port loaded LIU rack mountable, LIU shouldbe provided for terminating the optical fiber cables. It shall provide minimum bending radius and splice trays shall function as a splice cover for Pigtail Splicing. Cable glands shall be provided for secure anchoring of incoming cables. Rubber grommets shall be provided at the cable entry point for tight sealing. The splice tray should be made of ABS materials. LIU should be of reputed make. Make: D-Link/3M/ Digilink/Molex/ DAX or similar. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 1,17,684.3 | |
| — | 30.00 | — | — | ||
| Installation, Testing & Commissioning of rack mountable 12 port Loaded LIU. All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost. | — | — | — | 55,534.8 | |
| — | 16.00 | — | — | ||
| "Supply, installation, testing, wiring & commissioning of Layer-2 managed Switch (24 ports 10/100/1000 BASE-Tports, 4x 1G SFP+ ports) as per RDSO Specification No. RDSO/SPN/TC/83/2020 Revision 2.1 or latest (Switches to be procured from TTP approved sources) INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 4,29,788 | |
| — | 64.00 | — | — | ||
| "Supply of SFP Optical/Electrical 1 Gbps or100/1000 Mbps Electrical as required. Make:Cisco, Eoptical or similar suitable for Neon. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 2,83,292.16 | |
| — | 64.00 | — | — | ||
| Installation, testing & commissioning of Single mode1G SFP module compatible to Layer 2 switch. | — | — | — | 9,912.96 | |
| — | 10.00 | — | — | ||
| "Supply, Installation & commissioning of Maintenance free earth using basic earthing kit as per RDSO specification RDSO/SPN/197/2008 or latest and Drg No. SDO/RDSO/E&B /001 & 002 dated 19.9.2008 or latest. Earthing kit consist of 1. Earthing electrode of 17mm dia and 3 meter long-01 no. 2. MEEB (300mm X 25mm X 6MM) -01 no. 3. SEEB (150mm X 25mm X 6 mm) - 01 no. 4. Earth enhancing compound - 30 Kg (minimum). This include provision of earth connection from MEEB to S&T equipment i.e. cable sheath, apparatus case, IPS, data logger, signal etc. with PVC earth wire of size 16/25 Sq.mm through copper lugs of suitable size. PVC wire shall be supplied by Railways. Note: At certain locations it may not be possible to achieve earth resistance of less than 1.0 ohm with one earth electrode/pit due to soil resistivity. In such case provision of loop earth consisting of more than one earth pit shall be done. For interconnection of two earth pits copper tape of size 25X2 sq. mm shall be provided by contractor. The number of pits required shall be decided based upon the resistance achieved for the earth pit already installed. The procedure mentioned above for one earth pit shall be repeated for other earth pits. The other earth so installed for the purpose of loop earthing arrangement shall be counted as separate earth. Material to be procured through RDSO approved firm. Contractor have to submit check list duly signed by OEM after installation. INSPECTION: RDSO FOR SUPPLY PORTION" | — | — | — | 2,39,427.7 | |
| — | 20.00 | — | — | ||
| "Supply, preparation, splicing and installation ofstraight joint for 24 fibers along with enclosureswith heat shrinkable splice protection sleeve as per TEC Specn.G/OJC-02/01 March- 99 or latest. Splicelosses in no case should be more than 0.1 dB. INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 2,88,775.2 | |
| — | 15.00 | — | — | ||
| "Supply of OFC joint enclosure 24 fibers as per RDSO Spec. No. RDSO/SPN/TC/68/2014 Revision 1.0 or latest complete with all accessories (Sealing with mechanical clamp facility) INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 23,791.5 | |
| — | 720.00 | — | — | ||
| Splicing/Dropping /Termination of each fibre/pigtail in the LIU/I0 Box/Terminal Joints through fusion splicing of termination of OFC cables. The fibres terminated shall be tested and the test report (Hard copy and soft copy) shall be submitted to the site Engineer for records . Each fibre shall be properly marked with necessary ferrules/tags.( Inspection by Railway Site Engineer | — | — | — | 87,948 | |
| — | 15.00 | — | — | ||
| "Supply & installation of jointingpit as per Railway requirementwith cover and requiredtrenching to ease out cable/duct(The Joint chamber should bethe size of outer dia 1100 mm.Height-600 mm(2 piece of300mm) INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 89,133.15 | |
| — | 1.00 | — | — | ||
| "Supply of workstation suitable for fault analysis or other application. Note:- Workstation configuration are as follows: Intel Core i5 10500 or higher, 16 GB RAM, HDD 1000 GB, SSD 512 GB Windows 10/11, 2K display 21.5 Inch or better. It also includes supply of Laser duplex Printer (Make HP/Brother or better). INSPECTION: CONSIGNEE FOR SUPPLY PORTION" | — | — | — | 96,381.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACSGCC22-231to6.pdf
ATTACHMENT
GCC Correction slip 7 to 10
ATTACHMENT
GCC_April-2022_1.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
Tender Document
ATTACHMENT
GCCAdvanceCorrectionSlipno7-10.pdf
ATTACHMENT
T-01LMCTENDERDOCUMENT.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .