Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹3,900
Closing Date
29 Aug 2026, 5:00 pm6d left
Executive Officer,Baripada Municipality
Executive Officer,Baripada Municipality
Construction of Guard Wall from Tapan Babu House towards Amar Kumar Mishra House in Ward No-26
2026_ORULB_139288_2
BPDM 6 of 2026-2027
Open Tender
Civil Works - Roads
Percentage
45 days
Baripada Municipality
As per DTCN
3 documents required · 3 mandatory
₹2,000
₹3,900
Yes
20 Aug 2026
20 Aug 2026
31 Aug 2026
20 Aug 2026
29 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling & removing cement concrete including stacking the debris within intial lead and lift 50mtr lead (Unit-1 cum) | 3 | Cum | 877.16 | ₹2,631.48 |
| 2 | Earthwork in foundation & Plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge | 23.1 | Cum | 282.88 | ₹6,534.53 |
| 3 | Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge (Unit-1 cum) | 10.9 | Cum | 593.81 | ₹6,472.53 |
| 4 | C.C.(1:3:6) with 40mm CBHG metal including cost,carriage and royalty of materials (Unit-1 cum) | 5.65 | Cum | 6,990.25 | ₹39,494.91 |
| 5 | C.C.(1:2:4) with 12mm CBHG chips including cost,carriage and royalty of materials (Unit-1 cum) | 1.75 | Cum | 8,615.71 | ₹15,077.49 |
| 6 | R.C.C. work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials | 23.85 | Cum | 7,066.7 | ₹1,68,540.8 |
| 7 | Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. | 11.93 | Qntl | 9,538.36 | ₹1,13,792.63 |
| 8 | Rigid & smooth centering & shuttering for RCC works including false works and dismantling them after casting including cost of materials complete in ground floor | 125.65 | Sqm | 249.83 | ₹31,391.14 |
| 9 | Cost of Photo & Signboard | 1 | Full set | 810 | ₹810 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.33 MB
BOQ_606837.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].