| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹22.0 L+₹58,795.10 (2.74%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹21.7 L
EMD Value
₹22,000
Closing Date
6 Apr 2023, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER BP
BLOCK DEVELOPMENT OFFICE VEPPANAPALLI
Krishnagiri Dt Veppanapalli Block Renovation of Samathuvapuram Water Supply works, Roads, Park and Arch at K.Thippanapalli H/o Billanakuppam Pt Package No VPI-SAMATHUVAPURAM-01
2023_RDTN_297892_1
ROC NO_2088_22_A3_DT_17_03_23
Open Tender
Civil Works - Others
Item Rate
90 days
BLOCK DEVELOPMENT OFFICE VEPPANAPALLI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹22,000
Yes
BDO OFFICE VEPPANAPALLI
11 Apr 2023
1 Apr 2023
6 Apr 2023
1 Apr 2023
6 Apr 2023
1 Apr 2023
1 Apr 2023
Amount
1). RENEWAL OF BT ROADS FOR INTERNAL STREETS OF THANTHAI PERIYAR NINAIVU SAMATHUVAPURAM @ K. THIPPANAPALLI VILLAGE H/O BILLANAKUPPAM. Estimate Amount: Rs.17,15,000.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Hard rock Requiring wedginh and stacking etc.., completed
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Name Board Charegs
1). RENOVATION OF ARCH FOR THANTHAI PERIYAR NINAIVU SAMATHUVAPURAM @ K. THIPPANAPALLI H/O BILLANAKUPPAM. Estimate Amount: Rs.87000.
Clearing the scrub jungles including all labour charegs etc,. Completed.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing and finishing with a one course of ornamental design tiles using cm1:3, 20mm thick etc., completed.
1). REPAIRS AND RENOVATION OF 30000 LIT OHT FOR THANTHAI PERIYAR NINVAIVU SAMATHUVAPURAM AT K. THIPPANAPALLI H/O BILLANAKUPPAM. Estimate Amount: Rs.65000.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing scaf folding charges including cost and conveyance of materials and labour charges etc complete.
Outer Ladder Painting
Providing for Name Board charegs
1). RENOVATION OF THANTHAI PERIYAR NINAIVU SAMAPTHUVAPURAM PLAY GROUND @ K. THIPPANAPALLI VILLAGE H/O BILLANAKUPPAM. Estimate Amount: Rs.307000.
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply & Fixing of chain link fencing wire including all cost and conveyance etc., completed.
Provision for tieing the vertical post pncluding all labour charegs
Provion for Kids Playing Arrangements
Supplying and filling in foundation and basement with gravel including waater consildating etc., completed.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Swing 2 Seats:Swing Top pipe and supporting pipe made of Corrugated steel pipes,seats made of FRP materials 18 inch X 12 inch size and Heavy Duty stainless steel chain,paint of all weather two coats using Epoxy paint including cost and conveyance of all materials,labour
Seesaw 2 Board:Seesaw Top pipe and supporting plpe made of steel pipes,See saw pipe length 7 ft seats made of FRP material with safety hand grip to play 4 children simultaneously,paint of all weather two coats using Epoxy paint including cost and conveyance of all materials,labour charges etc.
SLIDER made of GI sheet and ladders made of 1 inch pipe and 1/2 inch cross steps - Slide 12 and Ladder centrally supported by 1-1/4 inch pipe paint of all weather two coats using Enamel paint including cost and conveyance of all materials, labour charges etc.
Towards Errection and transportion charegs for kids plaing playing materials etc., completed.
Provision for Name Board Charegs
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sakthi
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .