Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹10.8 LRejected-Finance | ₹10.8 L | L2 | Rejected-Finance L2 Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw |
| Sl No | Description | Qty | Unit | R SURESHKUMAR L1 | C. MANICKAM L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compound Wall @ Kaikkuruchi Muslim Burial Ground in Kaikkuruchi Panchayat | |||||
| 2.00 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS20B for foundation etc., complete. | 88.32 | Cum | 263.75 ₹23,294.40 | 270 ₹23,846.40 |
| 3.00 | Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete. | 7.71 | Cum | 1,817.5 ₹14,012.93 | 1,820 ₹14,032.20 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement and labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation. | 13.03 | Cum | 5,494.5 ₹71,593.34 | 5,495 ₹71,599.85 |
| 5.00STEEL CENTERING: Centering for sides and soffits includig necessary supports and strutting to the required height for the folllowing RCC items using MS sheets of suitable size of B.G. 10 stiffened with welded MS angles of size 25mmx25mmx3mm for boarding, laid over silver oak (country wood) joist of size 10cmx6.5cm spaced at 90m C/C and supported by causrina props of 10cm to 13cm dia spaced at 75cm C/C complying wth standard specification etc., completed as directed by TWAD board officers. | |||||
| 6.00 | Below Sill Level | 65.08 | Sqm | 547.5 ₹35,631.30 | 575 ₹37,421 |
| 7.00 | Above Sill Level | 52.86 | Sqm | 1,095 ₹57,881.70 | 1,125 ₹59,467.50 |
| 8.00 | Supply and fabrication of steel including cost and conveyance of all materials to site and lobour charges etc., complete | 1,660.09 | Kg | 91.8 ₹1.5 L | 92.5 ₹1.5 L |
| 9.00 | R C C 1:1/2:3 -using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc., Complete | 26.17 | Cum | 8,447.9 ₹2.2 L | 8,450 ₹2.2 L |
| 10.00 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete. | 23.29 | Sqm | 6,143.9 ₹1.4 L | 6,200 ₹1.4 L |
Tender Value
₹11.0 L
EMD Value
₹11,010
Closing Date
15 Dec 2025, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.Uniion Office,Thiruvarankulam
Construction of Compound wall at Kaikkuruchi Muslim Burial Ground in Kaikkuruchi Panchayat
2025_RDTN_630917_1
Tvk/MinorityWelfare/Work
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,010
17 Apr 2026
10 Dec 2025
15 Dec 2025
10 Dec 2025
15 Dec 2025
10 Dec 2025
Amount
Construction of Compound Wall @ Kaikkuruchi Muslim Burial Ground in Kaikkuruchi Panchayat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS20B for foundation etc., complete.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement and labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
STEEL CENTERING: Centering for sides and soffits includig necessary supports and strutting to the required height for the folllowing RCC items using MS sheets of suitable size of B.G. 10 stiffened with welded MS angles of size 25mmx25mmx3mm for boarding, laid over silver oak (country wood) joist of size 10cmx6.5cm spaced at 90m C/C and supported by causrina props of 10cm to 13cm dia spaced at 75cm C/C complying wth standard specification etc., completed as directed by TWAD board officers.
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and lobour charges etc., complete
R C C 1:1/2:3 -using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc., Complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Painting two coats of Emulsion paint with approved cement paint over one coat of priming coat over cement plastered exposed surface of the reservoid including cleaning preparing the surface and curing etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 12 of Section 2 of Instruction to Bidders (ITB) of SBD)
C. MANICKAM (BID ID -1533905)
stage.html
html • 0.05 MB
technical_754492.pdf
techsummary_754492.pdf
BOQ Comparative Chart
xlsx
finsummary_754492.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tvk-Doc.pdf
Tender Documents • 0.28 MB
BOQ_754492.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid