Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹3.5 L+₹50,001 (16.7%)Rejected-Finance | ₹3.5 L+₹50,001 (16.7%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | harry construction and construction L1 | Varun Sharma L2 |
|---|---|---|---|---|---|
| 1.00 | Deployment of consultant for Preparation of plan proposal and Detailed Project report for A/A&E/S, filling up of Nabard performas including field survey, related study, estimation including topographical survey site plan, L-section, etc including drawing of all civil structure and hydraulic design. The DPR shall invariably have related L-sections, X-sections, Site plan, Index plan, KML File of the project area, Hydraulic Design (Detail studies for estimation of water availability, peak water demand, design of Rising main and distribution system studies i/c writing of report) and Drawings as well as Structural Design and Drawings of various components where applicable, using AutoCad and other related genuine licensed software with latest versions and getting the same approved from the competent authority of the department nicely binded 03 copies of DPR shall be supplied in hard & 01 copy in soft format complete in all respect as per direction of Engineer-in-charge. | 1 | Job | 2,99,999 ₹2,99,999 Lowest | 3,50,000 ₹3,50,000 |
Tender Value
₹2.1 L
EMD Value
₹4,146
Closing Date
3 Sept 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Baddi
(S.H Preparation of Project report for A/A and E/S, including field survey related study, estimation including topographical survey site plan, L-section, etc. by outsourcing including drawing of all civil structure and hydraulic design.) Under Nabard
2026_HPIPH_142132_1
NIT No. 18319-419 Dt. 27-08-2026
Open Tender
Civil Works
Item Rate
90 days
Baddi
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹4,146
16 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
27 Aug 2026 - 2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Deployment of consultant for Preparation of plan proposal and Detailed Project report for A/A&E/S, filling up of Nabard performas including field survey, related study, estimation including topographical survey site plan, L-section, etc including drawing of all civil structure and hydraulic design. The DPR shall invariably have related L-sections, X-sections, Site plan, Index plan, KML File of the project area, Hydraulic Design (Detail studies for estimation of water availability, peak water demand, design of Rising main and distribution system studies i/c writing of report) and Drawings as well as Structural Design and Drawings of various components where applicable, using AutoCad and other related genuine licensed software with latest versions and getting the same approved from the competent authority of the department nicely binded 03 copies of DPR shall be supplied in hard & 01 copy in soft format complete in all respect as per direction of Engineer-in-charge. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
PWD6.pdf
Tender Documents • 0.26 MB
PWD8.pdf
Tender Documents • 0.98 MB
TandC.pdf
Tender Documents • 0.18 MB
BOQ_211047.xls
BOQ • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .