| 1 | 1₹39.9 LAccepted-AOC | 1 | Accepted-AOC Being lowest and reasonable | |
| 2 | 2₹63.0 L+₹10.2 L (19.3%)Rejected-Finance | 2 | Rejected-Finance Not being the lowest bidder |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
3 Jul 2023, 6:00 pmClosed
GE(I) R AND D RCI, HYDERABAD
GE(I) RND RCI, MILITARY ENGINEER SERVICES, VIGNYANAKANCHA, RCI, HYDERABAD
REPAIRS TO POWER TRANSFORMER, BUS TRUNKING SYSTERM SF6 CIRCUIT BREAKER CURRENT TRANSFORMERS VOLTAGE STABILIZERS BATTERY BANKS AND CERTAIN CONTROL CABLES AND SWITCH GEARS AT RCI HYDERABAD
2023_MES_599014_1
8838
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
GE(I) R AND D RCI
MES enlisted Class D category b ii and Un enlisted Meeting enlistment criteria of D class in MES and having no recovery pending. For further details ref NIT
8 documents required · 8 mandatory
₹500
Yes
GE(I) R AND D RCI, HYDERABAD
₹99,000
Yes
18 Jul 2023
27 May 2023
5 Jul 2023
27 May 2023
3 Jul 2023
13 Jun 2023
Amount
Disconnecting the electric supply, removing the HT and LT cable connections of the defective Power transformer 132/11 KV of 8000KVA capacity, outdoor type any make, taking down from platform with the help of crane suitable for lifting upto 30Ton or using lifting jacks, loading into low bed trailer of minimum 30Ton load capacity and transporting the same carefully to workshop for necessary repairs, taking all necessary precautions to avoid possible damage during transit and returning the same after carrying out repairs and reinstallation at the same location using crane, re-establishing connections on HV and LV sides complete all as directed.
Note: Hire charge for crane and Trailer, charges for loading/ unloading and transportation are deemed to be included in quoted rate. Any mistake on the part of the contractor during dismantling, transporting and reassembling of transformer shall be made good without any extra cost to government. Decision of Accepting Officer shall be final and binding.
Opening top cover of 132/11KV 8MVA capacity transformer, opening of top cover and draining out the Transformer oil, removing the inspection cover, lifting the core with suitable crane and cleaning all healthy parts including coils, laminations, tank, tap changer including sleeves, drying of assembled core and winding in oven upto required IP values, reassembly of transformer by tanking the dried core and winding assembly, fixing of all oil valves, fittings of accessories, making terminal connections to external bushings, including painting of transformer tank externally with two coats of enamel paint and internally with two coats oil resistant paint, complete Routine tests on PTR as per IS-2026, replacing unserviceable LV/ HV bushings, washers, oil seal, gaskets of inspections cover with new ones including OLTC chamber complete all as specified and directed.
Note: HV/LV bush, transformer oil, LV/HV coils inspection cover gasket, OLTC, transportation and testing of transformer will be measured and paid separately under relevant items.
Transportation to Workshop and return will be measured and paid separately.
Testing of transformer as specified at Sl item of BoQ will be measured and paid separately. However complete Routine tests on PTR as per IS-2026 is deemed to be included in the unit rate quoted.
Any hardware and minor items like nuts, bolts, washers, petroleum jelly, grease, CTC required for complete job are deemed to included in the quoted rate.
Filtration of transformer oil at site after installation will be measured and paid separately but for carrying out Routine tests after repairs in workshop shall be deemed to included in quoted rate.
All routine tests shall be carried out on Transformer in the presence of representative nominated by the Accepting Officer before dispatch of Transformer after carrying out repairs to the work site.
Contractor shall submit 12 months guarantee for no oil leakage in transformer and OLTC part from certified date of commissioning of transformer and if any defects are noticed during this period the same shall be rectified free of cost.
Providing of new copper winding in place of damaged winding for LV + HV (For 1 No Limb)
Supply of breather with Silicagel for main tank
Supply and filling up/toping up of transformer oil conforming to IS: 335 (latest revision), dielectric strength not less than 60KV at 2.5mm gap in power transformer complete all as specified and directed. Make: Power Oil/Servo/Castrol/Shell Note: Test certificate shall be submitted by the contractor.
Providing HT Static rings including new insulation
Providing Parmali wooden rings
Supply and fixing of oil seal for main shaft
M&L for overhaul of PTRs by removal of active parts from tank, cleaning all healthy parts including coils, lamination, tank, tap changer including sleeves. Oven drying of assembled core and winding, reassembliy of transformer by takingthe dried core and winding assembly, fixing of all oil valves, fitting of accessories, making of terminal connections to external bushings, including routine tests on PTR as per IS:2026
Supply and fixing of insulation for LV+HV winding for 3 Limbs
Material and labour for overhauling of radiators by providing new darain plugs and new Teflon washers
M&L for repair/overhaul of stuck radiator butterfly valves
M&L for overhauling of existing OLTC, including drive mechanism complete alongwith replacement of damaged part.
M&L for overhauling of old cooling fans and reconditioning of fan blades, out side casing etc., for proper fuctioning without re-wiring.
Supply and fix Current Transformer 11 KV, Ratio 300-150/1-1A, Core 1-CL 0.5 15 VA, Core 2-CL 5P10 15 VA, STC 26.3 KA for 1 Sec (For New Carbon Carbon and EMP SDTC ) Make : Straton Electricals Pvt Ltd
Dehydration of transformer oil of 8MVA power transformer with ultra high vacuum filtration machine to obtain the dielectric strength of 60KV at 2.5mm gap complete all as directed.
Conducting of Restricted Earth Fault Protection test for 132/11KV, 8.0 MVA transformer by connecting the neutral CT cable to relay control panel and conducting Stability test on transformer confirming the correct function of the relay into operation complete all as directed.
Maruthi international
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .