Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.4 LAdmitted-Finance | ₹78.4 L | L1 | Admitted-Finance |
| 2 | L2₹79.5 L+₹1.1 L (1.38%)Admitted-Finance | ₹79.5 L+₹1.1 L (1.38%) | L2 | Admitted-Finance |
| 3 | L3₹80.8 L+₹2.4 L (3.04%)Admitted-Finance | ₹80.8 L+₹2.4 L (3.04%) | L3 | Admitted-Finance |
| 4 | L4₹86.8 L+₹8.4 L (10.7%)Admitted-Finance | ₹86.8 L+₹8.4 L (10.7%) | L4 | Admitted-Finance |
| 5 | L5₹88.8 L+₹10.4 L (13.2%)Admitted-Finance | ₹88.8 L+₹10.4 L (13.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S.SALEEM.ENTERPRISES L5 | FALCON ENGINEERING PROJECTS PRIVATE LIMITED L1 | MUSHTAQ AHMAD BHAT L2 | Dev Constructions L7 | LATIEF AHMAD BHAT L6 | M/S DAR CONSTRUCTIONS PROP. BASHIR AHMAD DAR L4 | MANZOOR AHMAD WANI L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation over areas (exceeding 30 cms in depth, 1.5m in width as well as 10 Sqm on plan) incld. disposal of excavated earth, and lift upto 1.5m, (All kinds of soil). By muanal means | 112.2 | cum | 200 ₹22,440 | 270 ₹30,294 | 200 ₹22,440 | 200 ₹22,440 | 199 ₹22,327.8 | 254 ₹28,498.8 | 165 ₹18,513 Lowest |
| 2.00 | Providing & laying of stone soling in level duly hand packed and laid in layers | 33.52 | cum | 900 ₹30,168 | 800 ₹26,816 | 800 ₹26,816 | 900 ₹30,168 | 1,050 ₹35,196 | 1,100 ₹36,872 | 680 ₹22,793.6 Lowest |
| 3.00 | Providing & laying in position cement conc. of specified grade excld. Cost of centering & shuttering- all work upto plinth level in 1:4:8 (1 cement :4 coarse sand :8 graded stone agg. 40 mm nominal size (Crushed) | 21.44 | cum | 3,000 ₹64,320 Lowest | 4,700 ₹1,00,768 | 4,000 ₹85,760 | 5,000 ₹1,07,200 | 4,500 ₹96,480 | 3,800 ₹81,472 | 3,100 ₹66,464 |
| 4.00 | Providing and laying in position specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing -and reinforcement All work upto plinth level, M20 grade concrete strip raft( foundation, stairfront/back plinth band) | 25.11 | cum | 9,000 ₹2,25,990 | 6,900 ₹1,73,259 | 7,500 ₹1,88,325 | 7,500 ₹1,88,325 | 7,800 ₹1,95,858 | 7,400 ₹1,85,814 | 6,600 ₹1,65,726 Lowest |
| 5.00 | Providing & laying in position cement conc. of specified grade excld. Cost of centering & shuttering- all work upto plinth level in 1:2:4 (1 cement :2 coarse sand :4 graded stone agg. 40 mm nominal size (Crushed) M-15 Grade PCC | 60.96 | cum | 6,500 ₹3,96,240 | 6,800 ₹4,14,528 | 7,000 ₹4,26,720 | 6,500 ₹3,96,240 | 7,200 ₹4,38,912 | 7,400 ₹4,51,104 | 6,200 ₹3,77,952 Lowest |
| 6.00 | providing and laying of Reinforced cement concrete M 20 grade in walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses, fillets, columns, pillars, piers, abutments, posts & struts etc. upto floor five level excld. cost of centering, shuttering finishing & reinforcement. Beams, colounms, slab, slap cannopy, septic tank, soakage pit, stair first floor | 47.2 | cum | 10,500 ₹4,95,600 | 8,400 ₹3,96,480 | 8,000 ₹3,77,600 | 7,500 ₹3,54,000 Lowest | 8,500 ₹4,01,200 | 8,300 ₹3,91,760 | 7,500 ₹3,54,000 Lowest |
| 7.00 | providing and fixing of Reinforcement for RCC work incld. straightening, cutting, bending, placing in positions and binding all complete (T.M.T) | 4,690 | Kg | 90 ₹4,22,100 | 89 ₹4,17,410 | 75 ₹3,51,750 Lowest | 100 ₹4,69,000 | 89 ₹4,17,410 | 110 ₹5,15,900 | 88 ₹4,12,720 |
| 8.00 | providing and fixing of Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, strip raft, plinth band, septic tank, stairs,cable truch wall, plinth protection | 301.36 | Sqm | 200 ₹60,272 Lowest | 250 ₹75,340 | 200 ₹60,272 Lowest | 200 ₹60,272 Lowest | 250 ₹75,340 | 380 ₹1,14,516.8 | 200 ₹60,272 Lowest |
| 9.00 | providing and fixing of Centring & Shuttering for lintels, suspended floors, columns,beams in control room, beams in extended portion, cannopy,slab etc. and removal of form work | 368.34 | Sqm | 200 ₹73,668 Lowest | 450 ₹1,65,753 | 400 ₹1,47,336 | 350 ₹1,28,919 | 550 ₹2,02,587 | 704 ₹2,59,311.36 | 415 ₹1,52,861.1 |
| 10.00 | providing and fixing of Centring & Shuttering of Edges of Slab as per site requirement including removal of form work | 100 | Rm | 10 ₹1,000 Lowest | 80 ₹8,000 | 10 ₹1,000 Lowest | 350 ₹35,000 | 300 ₹30,000 | 65 ₹6,500 | 200 ₹20,000 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
16 Jul 2026, 4:30 pmClosed
Executive Engineer, STD-II, Rajbagh,Srinagar
Office of the Executive Engineer, STD-II, Rajbagh
Construction of double story Control Room Building along with development of land and fencing for 1 x 10 MVA,33 11 KV Receiving Station at Kanidajan, Charari Sharief Budgam
2026_PDD_312958_2
e-NIT No STD-II / 36 of 2026-27 Dated 18-06-2026
Open Tender
Civil Works
Turn-key
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Executive Engineer, STD-II, Rajbagh,Srinagar
₹2.2 L
25 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation over areas (exceeding 30 cms in depth, 1.5m in width as well as 10 Sqm on plan) incld. disposal of excavated earth, and lift upto 1.5m, (All kinds of soil). By muanal means | - | cum | - | - |
| 2 | Providing & laying of stone soling in level duly hand packed and laid in layers | 33.52 | cum | - | - |
| 3 | Providing & laying in position cement conc. of specified grade excld. Cost of centering & shuttering- all work upto plinth level in 1:4:8 (1 cement :4 coarse sand :8 graded stone agg. 40 mm nominal size (Crushed) | 21.44 | cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing -and reinforcement All work upto plinth level, M20 grade concrete strip raft( foundation, stairfront/back plinth band) | 25.11 | cum | - | - |
| 5 | Providing & laying in position cement conc. of specified grade excld. Cost of centering & shuttering- all work upto plinth level in 1:2:4 (1 cement :2 coarse sand :4 graded stone agg. 40 mm nominal size (Crushed) M-15 Grade PCC | 60.96 | cum | - | - |
| 6 | providing and laying of Reinforced cement concrete M 20 grade in walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses, fillets, columns, pillars, piers, abutments, posts & struts etc. upto floor five level excld. cost of centering, shuttering finishing & reinforcement. Beams, colounms, slab, slap cannopy, septic tank, soakage pit, stair first floor | 47.2 | cum | - | - |
| 7 | providing and fixing of Reinforcement for RCC work incld. straightening, cutting, bending, placing in positions and binding all complete (T.M.T) | 4,690 | Kg | - | - |
| 8 | providing and fixing of Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, strip raft, plinth band, septic tank, stairs,cable truch wall, plinth protection | 301.36 | Sqm | - | - |
| 9 | providing and fixing of Centring & Shuttering for lintels, suspended floors, columns,beams in control room, beams in extended portion, cannopy,slab etc. and removal of form work | 368.34 | Sqm | - | - |
| 10 | providing and fixing of Centring & Shuttering of Edges of Slab as per site requirement including removal of form work | 100 | Rm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 1.59 MB
BOQ_1023423.xls
BOQ • 0.29 MB
corrigendumm.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .