| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance | 1 | Accepted-Finance Accept | |
| 2 | 2₹1.8 L+₹36,250 (25.5%)Accepted-Finance | 2 | Accepted-Finance Accept | |
| 3 | 3₹2.0 L+₹55,850 (39.3%)Accepted-Finance | 3 | Accepted-Finance Accept | |
| 4 | 4₹2.6 L+₹1.2 L (82.5%)Accepted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | 4 | Accepted-Finance Accept |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
18 Sept 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ETD-Fatehgarh
ETD Fatehgarh 132 KV S/S Bewar Road Fatehgarh, Farrukhabad-209602
Dismantling of 40 MVA TF and Erection of New 40 MVA T/F at 220 KV S/S Farrukhabad under ETD-Fatehgarh
2024_UPTCL_947475_2
T-02/ETD(F)/2024-25
Open Tender
Electrical Works
Fixed-rate
90 days
220 KV SS Farrukhabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
UPPTCL ETD-Fatehgarh
₹4,000
19 Sept 2024
10 Sept 2024
18 Sept 2024
10 Sept 2024
18 Sept 2024
10 Sept 2024
Amount
Work schedule of dismantling of 40 MVA T/F-I and Erection of New 40 MVA T/F at 220 KV S/S Farrukhabad
Complete dismantling the accessories of 40 MVA, 132/33 KV Transformer after opening of Jumpers, removal of earthing and opening of cables & cable connection, draining out the transformer oil up to required level in 209 litres capacity oil drums/tanker, removal of all radiators, conservator tank, oil pipe lines all bushings, turrets, fan motors, mashalling box. RTCC panel etc with proper gasket along with nuts and bolts to complete the jobs satisfactorily including proper stacking, Blanking plates, nuts and bolts. All T&P required for execution of work shall be arranged by the contractor at his own cost (if required)
Shifting of main tank of 40 MVA. 132/33 KV transformer approximate 20 mtrs away from the plinth+ including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech Specn (if required)
Additional shifting 1 Job for every 5 Mtr.
Shifting of main tank of New 40 MVA. 132/33 KV transformer from unloading point up to plinth, approximate 20 mtrs distance including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech Specn
Additional shifting 1 Job for every 5 Mtr. (if required)
Complete, erection of 40 MVA T/F by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of oil pipe line. erection of cooling fans, making control cables connection of T/F, bucholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank , Earthing of main tank, Neutral bushing HV and LV side, by using MS Flat 50x6/75x10 mm size ,Jumpering from HV with single MOOSE/ ZEBRA and LV Side With Double Zebra/ Panther complete upto 33kv main bus and all other associates work for completing of work.
Termination of cable in RTCC & marshaling box transformer relay panel if required with the assurance of proper reflection of parameters in the meters, gauges provided on RTCC, OLTC, Marshaling box, transformer etc.
Placement of new RTCC panel of this new 40 MVA T/F in control room at 220KV S/S Farrukhabad including its Termination & fitting and laying of control cable if required as per site requirement and its connections
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating th T/F oil through PVT. Centrifuging machine and taking the BDV value of the oil periodically till the required value is achieved. Approx. 16 KL
After centrifuging and achieving the desired value of BDV & PPM (as per specification of T/F manufacturer), testing of T/F oil (Dissloved Gas Analysis, Tan Delta, Dielectric Strength & Water content test) is to be done at CPRI lab/before charging of T/F and after charging of T/F. Works includes sample collection, transportation and submission of reports ,
M/s S.S. Refregeration
TAJ ENTERPRISES
Versha and Brothers
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .