| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹15.6 L (12.6%)Rejected-Finance 0 BARAGOAN JANGIGANJ BHADOHI SANT RAVIDAS NAGAR UTTAR PRADESH 221310 | BHADOHI | UTTAR PRADESH | 221310 | ₹1.4 Cr+₹15.6 L (12.6%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr+₹15.8 L (12.7%)Rejected-Finance | ₹1.4 Cr+₹15.8 L (12.7%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 Cr+₹20.6 L (16.6%)Rejected-Finance GRAM ALIPUR MORNA TEHSIL MAWANA DISTRICT MEERUT UTTAR PRADESH 245001 | 245001 | ₹1.4 Cr+₹20.6 L (16.6%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.5 Cr+₹23.2 L (18.7%)Rejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.5 Cr+₹23.2 L (18.7%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | NARESH KUMAR L4 | CHATURBHUJ INFRASTRUCTRE INDIA PRIVATE LIMITED L6 | M/S Harish Kumar Contractor L1 | MA AND SONS L5 | M/S SINGH CONTRACTOR L3 | SHRI SAI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | 383.84 | CUM | 400 ₹1,53,536 | 470 ₹1,80,404.8 | 366.86 ₹1,40,817.08 | 400 ₹1,53,536 | 341 ₹1,30,889.44 Lowest | 440.3 ₹1,69,004.75 |
| 2.00 | Surface Dewatering for digging earth etc . | 6,042.6 | KWH | 32 ₹1,93,363.2 | 43 ₹2,59,831.8 | 34.39 ₹2,07,826.16 | 10 ₹60,426 Lowest | 38 ₹2,29,618.8 | 39.74 ₹2,40,132.92 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as direction by the engineer-in-charge. | 1,135.47 | CUM | 90 ₹1,02,192.3 | 90 ₹1,02,192.3 | 76.43 ₹86,783.97 | 70 ₹79,482.9 Lowest | 128 ₹1,45,340.16 | 85 ₹96,514.95 |
| 4.00 | Providing and laying C.C. (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc.complete | 244.02 | CUM | 5,500 ₹13,42,110 | 5,551 ₹13,54,555.02 | 4,511.25 ₹11,00,835.23 Lowest | 5,500 ₹13,42,110 | 4,686 ₹11,43,477.72 | 5,169 ₹12,61,339.38 |
| 5.00 | Providing and laying R.C.C. (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc.complete | 180.4 | CUM | 6,630 ₹11,96,052 | 6,682 ₹12,05,432.8 | 5,655.82 ₹10,20,309.93 | 6,800 ₹12,26,720 | 5,452 ₹9,83,540.8 Lowest | 6,222 ₹11,22,448.8 |
| 6.00 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc.complete . | 702.27 | CUM | 7,535 ₹52,91,604.45 | 7,610 ₹53,44,274.7 | 6,221.58 ₹43,69,228.99 Lowest | 8,100 ₹56,88,387 | 6,305 ₹44,27,812.35 | 7,086 ₹49,76,285.22 |
| 7.00 | Ordinary Centering and shuttering work including cost of all labour and T&P etc. Complete. | 516.76 | sqm | 750 ₹3,87,570 | 785 ₹4,05,656.6 | 657.3 ₹3,39,665.31 | 450 ₹2,32,542 Lowest | 575 ₹2,97,137 | 731 ₹3,77,751.56 |
| 8.00 | Special Centering and shuttering work including cost of all labour and T&P etc. Complete. | 1,214.55 | sqm | 970 ₹11,78,113.5 | 1,010 ₹12,26,695.5 | 825.39 ₹10,02,477.42 | 600 ₹7,28,730 Lowest | 852 ₹10,34,796.6 | 977 ₹11,86,615.35 |
| 9.00 | Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 50.56 | M.T. | 66,000 ₹33,36,960 | 65,500 ₹33,11,680 | 53,534.36 ₹27,06,697.24 Lowest | 70,000 ₹35,39,200 | 72,237 ₹36,52,302.72 | 61,072 ₹30,87,800.32 |
| 10.00 | Providing and fixing P.V.C. pipe 110mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc. | 10 | R.M. | 150 ₹1,500 Lowest | 180 ₹1,800 | 214 ₹2,140.04 | 200 ₹2,000 | 426 ₹4,260 | 170 ₹1,700 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
12 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1068184_15
02/SE-1/2025-26
Open Tender
Civil Works
Piece-work
180 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.3 L
SE OFFICE 1ST IWC MEERUT
13 Nov 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
10 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .