Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
6 Oct 2026, 3:00 pm5d left
BDO BP Ottapidaram
Block development office Ottapidaram
Construction of Art Theatre at Puliyampatti Village in Akkanaikanpatti Panchayat
2026_RDTN_705865_1
BDOoprm A2/2069/2025 Dt15.09.2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Ottapidaram block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹10,000
Yes
18 Sept 2026
18 Sept 2026
6 Oct 2026
18 Sept 2026
6 Oct 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Art Theatre at Puliyampatti Village in Akkanaikenpatti Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 31.16 | Cum | 263.78 | ₹8,219.38 |
| 3 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling including cost and conveyance of all materials to site and all labour charges etc complete | 16.41 | Cum | 120.99 | ₹1,985.45 |
| 4 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 5.39 | Cum | 2,059.93 | ₹11,103.02 |
| 5 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 8.42 | Cum | 5,800.93 | ₹48,843.83 |
| 6 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all curing etc ,complete | 19.99 | Cum | 6,194.7 | ₹1,23,832.05 |
| 7 | R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 20.21 | Cum | 9,555.96 | ₹1,93,125.95 |
| 8 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1.65 | Mt | 91,982.5 | ₹1,51,771.13 |
| 9 | Supplying and erection centering for sides and soffits inculding etc complete., | - | - | - | - |
| 10 | Below Ground level | 55.32 | Sqm | 547.5 | ₹30,287.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
02Technicalbid.pdf
Tender Documents • 0.83 MB
BOQ_848351.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .