Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 CrAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹24.1 Cr+₹43.1 L (1.82%)Rejected-Finance A 1 12 2ND FLOOR PASCHIM VIHAR NEW DELHI 110063 700013 | NEW DELHI | NEW DELHI | DELHI | 110063 | L2 | Rejected-Finance Rejected |
Tender Value
₹26.3 Cr
EMD Value
₹52.9 L
Closing Date
18 Feb 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE RED Lucknow Circle
SE RED Lucknow Circle
Construction and 5-Year Maintenance of Road Under Full Depth Reclamation/ In-Situ Stabilization with Cement and Additive of Pkg No UPFDR-36 In District Sitapur (UP 66142, 66157 66135, 66158)
2022_UPRRD_115502_19
5978/T252/UPRRDA /PMGSY3-Batch-1/21-22 Dt 10-12-21
Open Tender
CIVIL
Percentage
365 days
Sitapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹52.9 L
CEO UPRRDA LUCKNOW
30 Apr 2022
11 Jan 2022
19 Feb 2022
11 Jan 2022
18 Feb 2022
26 Jan 2022
17 Jan 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| 2 | 1- MRL12-T 03 (SIDHAULI MISHRIKH PISAWAN ROAD) KM 34 TO BANOURA ROAD (Length 5.050 Km) Distt: - Sitapur Pkg No UP 66135 | - | - | - | - |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. [RA-1] | 18,225.9 | Sqm | 5.8 | ₹1,05,710.22 |
| 4 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 [RA-4] | 2,936.14 | Cum | 142.7 | ₹4,18,987.18 |
| 6 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause [RA- 15] | 1,008.46 | Cum | 41 | ₹41,346.9 |
| 7 | Construction of Sub-grade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead up to 1000m as per Technical Specification Clause 303.1 [RA-5] | 6,503.34 | Cum | 107 | ₹6,95,857.38 |
| 8 | Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne) RA-6] | 4,130.92 | Cum | 3,760.81 | ₹1,55,35,605.25 |
| 9 | Providing and laying Primer coat with Bitumen(SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70-1.0 kg/Sqm using mechanical means as per technical Specification Clause-502. [RA-9] | 18,847.5 | sqm | 40.4 | ₹7,61,439 |
| 10 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion Distributor at the 0.20-0.25 kg per sqm on the prepared Bituminous/Granular Surface cleaned with hydraulic broom as per Technical Specification -503 [RA-10] | 18,847.5 | sqm | 12.92 | ₹2,43,509.7 |
| 11 | SAMI/Bitumen impregnated Geotextile layer
Providing and laying Stress Absorbing Membrane Interlayer (SAMI)/bitumen impregnated geotextile layer after clearing of the road surface geotextile conforming to physical requirements of clause 703-3, laid over a tack coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1.05 kg per sqm over thoroughly cleaned and repaired surface to provide a water resistance membrane and crack retarding layer paving fabric to be free of wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to maximise paving fabric contact with pavement Surface. [As per the Letter no. 2795/T-252/FDR/UPRRDA/2021 dated 23-02-2021] (RA-12) | 18,337.5 | sqm | 75 | ₹13,75,312.5 |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_185749.xls
BOQ Document • 0.50 MB
90614602.pdf
Tender Document • 2.09 MB
FDR_36_SBD.pdf
Tender Document • 0.77 MB
90614604.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .