Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.7 LAccepted-AOC | ₹94.7 L Quoted ₹95.2 L | L1 | Accepted-AOC Dur to L1 Bidder |
| 2 | L2₹97.7 LRejected-AOC | ₹97.7 L | L2 | Rejected-AOC Dur to L2 Bidder |
| 3 | L3₹1.0 CrRejected-AOC 2339 4 NEHRU COLONY 2339 4 NEHRU COLONY JIND ROAD ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | ₹1.0 Cr | L3 | Rejected-AOC Dur to L3 Bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as per enclosed sheet |
Tender Value
₹99.7 L
EMD Value
₹2 L
Closing Date
22 May 2026, 1:00 pmClosed
Devinder Kumar
UE Division
Raising of existing kerbs cast-in-situ to protect fencing.
2026_HRY_521780_1
202682C64AB6 3550 45D4 9E9B 0E0BDC1026D31874002
Open Tender
Civil Works
Works
180 days
Faridabad
2 documents required · 2 mandatory
₹5,000
₹2 L
Yes
29 Jul 2026
14 May 2026
22 May 2026
14 May 2026
22 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1HSR Items | |||||
| 1.01 | Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
[Through Rate] | 16,065 | Sqm | 88 | ₹14,13,720 |
| 1.02 | Flexible Median Marker Providing and Fixing of Flexible Median Markers as per IRC 79:2019 which shall be made of combination of tough, high impact resistant molded thermoplastic body along with floroscent yellow colour retro-reflective Class C sheeting with minimum exposed reflective area 285 square mm and with rebound property. The reflective sheeting should confirm to Class C Yellow sheeting as per IRC 67-2012 . The flexible median marker shall have overall height of minimum 180 mm, width of minimum 120 mm, body thickness of minimum 2.0 mm and shank depth of minimum 30mm. The retro-reflective heeting shall be on both sides of the Flexible Median Marker and shall be edge protected with no exposed edges which will prevent edge lifting, vandalism, sheeting damage, etc. The edge of sheeting should not come out easily by putting nails, sharp objects etc. The logo of the manufacturer shall be embossed on either side of the body. The product design has to with stand all natural impacts and should not get damaged if any pedestrian stamp on top of it intentionally or
unintentionally. The product should bend up to 90 degree
on both sides without breakage or damage. The Flexible
Median Marker shall be tested from Government Lab for
reboundability and tensile test as per IRC 79 :2019.
[Through Rate] | 7,650 | Nos. | 348 | ₹26,62,200 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-incharge. 1. All kinds of soil [Through Rate] | 153 | cum | 78 | ₹11,934 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
[Through Rate] | 879.75 | cum | 3,975 | ₹34,97,006.25 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
[Through Rate] | 153 | cum | 2,911 | ₹4,45,383 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
[Through Rate] | 6,885 | Sqm | 282 | ₹19,41,570 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_600692.xls
BOQ • 0.38 MB
AD0163804.pdf
Additional Documents • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].