Loading…
Loading…
Tender Value
₹33.3 L
EMD Value
₹66,700
Closing Date
4 May 2026, 6:00 pmClosed
Garrison Engineer
GE (U) Chandimandir Pin-134107
CA NO GE(U)/CHM-81/2025-26 PROVN OF RAIN WATER HARVESTING FACILITY OF OTM ACCN, COVERED SHED FOR FOOD TROLLEY AT PATIENTS COOK HOUSE AND OPEN PARKING FACILITY OPPOSITE JCOs/OR BASERA GUEST ROOMS AT CH (WC) AND CMDC (WC) UNDER GE (U) CHANDIMANDIR
2026_MES_758554_1
GE(U)/CHM-81/2025-26
Open Tender
Civil Works
Item Rate
180 days
GE (U) Chandimandir
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
GE (U) Chandimandir
₹66,700
Yes
25 Apr 2026
30 Mar 2026
8 May 2026
30 Mar 2026
4 May 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means in any type of soil (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in charge | - | Cum | - | - |
| - | Excavating in trenches, not exceeding 1.5m wide and not exceeding 1.5m in depth, for foundations etc or manholes, cesspits, pipes and cables etc. not exc 10 Sqm on plan and getting out in any type of soil all as specified and directed by Engineer - in - Charge. | - | Cum | - | - |
| - | Earth work in excavation by mechanical means in any type of soil (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift exceeding 1.5m but not exceeding 3.0m, as directed by Engineer-in charge | - | Cum | - | - |
| - | Earth work in excavation by mechanical means in any type of soil (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift exceeding 3.0m but not exceeding 4.5m, as directed by Engineer-in charge | - | Cum | - | - |
| - | Excavating in post holes (or similar holes) each not exceeding 0.5 cum, getting out, returning, filling in and ramming earth, in layers not exceeding 25cm, watering, and removing surplus spoil to a distance not exceeding 50m and making good surface all as specified and directed by Engineer - in - Charge. | - | Each | - | - |
| - | Surface excavation not exceeding 30cm deep and averaging 15cm deep and getting out in loose / soft soil all as specified and directed by Engineer - in – Charge. | - | Sqm | - | - |
| - | Returning, filling in, including spreading, levelling, watering and well ramming in layers of soft / loose soil not exceeding 25cm thick all as specified and directed by Engineer - in - Charge. | - | Cum | - | - |
| - | Removal of excavated material to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point all as specified and directed by Engineer - in - Charge. | - | Cum | - | - |
| - | M&L for Hardcore of gauge n exc. 63 mm of broken stone, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface all as specified and directed by Engineer - in - Charge. | - | Cum | - | - |
| - | M&L Cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate as in foundation, filling and mass concrete and sub base all as specified and directed by Engineer - in - Charge | - | Cum | - | - |
stage.html
html • 0.01 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tenderdocuments81.pdf
Tender Documents • 1.57 MB
BOQ_849621.xls
BOQ • 0.30 MB
DateCorrigendum02.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .